Seascape Energy Asia PlcLSE: SEA

Corporate Update

· Issued by Seascape Energy Asia Plc




‌Corporate update

Taking Seascape to the next level

July 2025





‌Executive & board




Significant regional experience



James Menzies

Executive Chairman

  • Salamander Energy (Founder/CEO)

  • Coro Energy, TAP Oil

  • Lambert Energy

  • MSc Geophysics & Planetary Physics

Nick Ingrassia

Chief Executive

  • Salamander Energy (BD Head)

  • DNO, Longboat, Faroe, Valiant

  • Morgan Stanley, RBS

  • MA Ancient History

Pierre Eliet

Executive Director, Chair Malaysia

  • IPC and ROC Oil Malaysia

  • Cairn (Capricorn)

  • PhD Geology, BA Earth Science

  • IDP-C INSEAD



Graham Stewart

Non-executive director



2

Geraldine Murphy





Non-executive director



Haida Hazri

Non-executive director





‌Seascape snapshot

+250 bcf gas cluster development + upside

Discovered Resources + Exploration Upside

Temaris Cluster

(SEA 100%, op)

Discovered Resources

DEWA Cluster

(SEA 28%)

Material, Malaysian-focused, gas-weighted portfolio built in ~2 years

Block 2A (Kertang)

(SEA 10%)



High Impact Exploration





A 9 TCF giant

300-400 bcf gas cluster development

Sabah

Peninsular Malaysia

Brunei

Indonesia

~£40 million

Market cap

3 Source: Seascape estimates

£10 million

cash, no debt

Sarawak`

+50 mmboe

est 2C resources

+170 mmboe

est prospective resources





‌Competitively advantaged in Malaysia

Delivering success where others struggle

SEA key achievements from Feb-23

2023

  • Block 2A award

  • EnQuest/SEA AMI

H1

2024

H2

H1

2025

H2

  • DEWA application

  • Southeast Asia pivot

  • DEWA award (28%)

  • Block 2A farm-out!

  • Temaris application

  • Temaris award (100%)

pursuing further growth opportunities



High barriers-to-entry in Malaysia

  • Few qualified small-cap, international E&Ps

  • Well-established, long-standing relationships

  • Timing is everything

    Working in tandem with regulator

  • Trust earned from delivery on promises

  • Strong connections at all levels

    Malaysian team in Malaysia

  • Focused on growing regional team

  • Young, well-respected, technical excellence

  • Long-term commitment to the country

4





‌Structurally short gas position

LNG imports into Peninsular Malaysia required to meet soaring demand

Peninsular Malaysia Gas Demand

2A

Kerteh

Peninsular Malaysia

Temaris

Sarawak Gas Demand

Brunei

Gas power plant Petchem plant

LNG



Regas

Auz+

DEWA

Bintulu

Sarawak

LNG Regas Terminal

LNG

Regas

4 BCM

LNG

5 Sources: Energy Institute Statistical Review of Energy 2024, Petronas MPM, Woodmac





‌Huge opportunity

Malaysia has ~10 billion boe of stranded resources*



6 *Source: Wood Mackenzies estimates



‌Asset overview

7





‌Temaris: appraised and ready to develop

New award on accelerated development timeline

Tembakau

8

~200 bcf



Temaris Cluster

(SEA 100%, op)



Discovered Resources + Exploration Upside



+250 bcf gas cluster development + upside



Originally drilled by Lundin Oil (now IPC)

  • Tembakau (2012, 2014); Mengkuang (2015)

  • Recently relinquished due to geographic priorities

    Significant data set gained with award

  • Full 3D seismic coverage, DSTs, + 145m of core

  • DST test rates of up to 16 mmscfd

  • Normally-pressured, dry gas, low impurities

    Shallow water (~68m), near infrastructure (~50 km) Targeting low-cost development plan

  • Enhanced 'SFA PSC' terms

  • Minimal, unmanned facilities

  • Production plateau of up to 100 mmscfd (~17 kboepd)





‌Temaris exploration: low-risk, high-potential


Upside could more than double resource size

Temaris Cluster PSC

Mengkuang

Tembakau

Additional Prospective Resources

Significant exploration upside already identified

  • Mid-Miocene fluvial channel systems

  • High-quality reservoirs, excellent porosity/permeability

  • Evident in multiple horizons across Temaris PSC

  • Largely 'low risk' near-field potential

    Seismic reprocessing underway

  • Allow amplitude calibration against existing wells

  • De-risking sands vs gas-filled sands

  • Potential to explore/appraise during development

    Opportunities extend into adjacent acreage

  • Acreage available in 'second phase' of MBR 2025

  • End 2025 application deadline, early 2026 award

Prospective resource review in upcomiing CPR

9 Source: Seascape, photos of Mulu National Park (Sarawak, Malaysia)

Composite Map - Sum of Amplitudes



‌DEWA: progressing toward development plan

Subsurface work substantially complete

Discovered Resources

DEWA Cluster

(SEA 28%)

Initial focus fields Additional gas fields

D30



DANAU

D41



DANA

DAFNAH

WEST

Discoveries from late-1980s & mid-2000s

  • Shell & PCPP

    300-400 bcf gas cluster development

  • Significant nil-cost data set with award

    42% 30% 28%

12 gas fields & discoveries
  • Six fields high-graded

  • ~300-400 bcf recoverable

    Shallow water (~50m), near infrastructure (~45 km)

    Significant progress made on subsurface models, now progressing preferred development plan/route

  • Minimal, unmanned facilities, est $5-7/boe of capex

  • Production plateau of up to 100 mmscfd (~17 kboepd)

Bintulu LNG

Sarawak

10 Source: Seascape





‌Large prize close to infrastructure

Significant, high-quality dataset means no appraisal needed

DEWA

D35

~25km

Bayan

~45km

Bintulu LNG



Wellhead Platform

11 Source: Seascape, picture from Tarpon Systems website





‌Block 2A: 9 TCF of nil-cost, blue-sky upside

Full, uncapped carry on Malaysia's largest undrilled structure

Kertang

amplitude brightening

A'

A

Block 2A

Cycle V/VII

gas chimney

Cycle II/III

A A'

Cycle I

Brunei

~200 km2 closure

coals

Block 2A (Kertang)

(SEA 10%)

A 9 TCF giant

High Impact Exploration

42.5%

40%

7.5%

10%

Firm well commitment during Q3 2025

  • Important part of its multi-well, deepwater drilling campaign during 2026/2027 in Sarawak

12 Source: Seascape

Bintulu LNG

DEWA

Sarawak



‌Outlook

13





‌Traction & catalysts

Industry and market are only just starting to realise Seascape's potential

Current Asset Base Next Steps Future Growth Steps

DEWA (SEA 28%)

CPR: publish contingent resource figures Temaris (SEA 100%, op)

CPR: publish contingent & prospective resource figures Block 2A (SEA 10%)

Final partner approval of Kertang drilling

Granular geology, define well location/cost/timing

Beyond Kertang: additional on-block prospectivity

  • Step-out "Kertang-look-a-like" prospects

  • Shallow Turbidite play in south of block

Continue acreage build-out around existing Malaysian position

Initiate Temaris farm-out to long-term, strategic partner

  • Retain significant, operated interest

Potential to establish a third 'core area' in Malaysia

Opportunistic approach to growth elsewhere in the region

Interest in Seascape is building as an emerging, high-quality pure play

14 "CPR": Independent, Third-Party Competent Persons Report



‌Substantial resources vs listed peers

Seascape development PSCs bring significant growth potential

Peer Group Market Cap v Reserves & Resources

2P

2C

M/Cap



£500



150

£400 120

£300 90

£200 60

£100 30

£0

Jadestone Valeura EnQuest

Seascape

Seascape

0

Sunda Conrad Pharos Criterium Upland

15 Source: Company disclosures and Seascape estimates

Note: Figures only include reserves & resources in Southeast Asia held by each Company and adjusted for recent transactions, M/Cap as at 7 July 2025 converted to GBP





‌Taking Seascape to the next level

Summary

Competitively Advantaged

Limited peer group Deep regional network

Part of the Malaysian ecosystem

High-Quality Portfolio

Hard value + nil-cost blue sky upside Greenfield, simple developments Gas-weighted

Just Getting Started…

Significant opportunities in Malaysia Potential to expand regionally

Grow where we have a role to play

16



‌

seascape-energy.com

IR@seascape-energy.com

@SeascapeEnergy



















Seascape Energy Asia