Carnarvon Energy LimitedASX: CVN

Roc-1 well update

· Issued by Carnarvon Energy Limited

Filed with ASX · · 3 pages · English

Since the last report the 216 mm (8 ½”) hole has drilled from a depth of 4,855 metres to approximately 4,943 metres. Over the weekend the logging program commenced with quad combo wireline logging. Current Operations As at 06:00 hours on 29th December 2015 the rig was running the pressure test tools. Forward Plan It is estimated to take a further three to five days to acquire the full suite of wir