Bayan Airport in Tabang site
https://www.bayan.com.sg 0
Operationally, the third quarter has seen significant improvement in
production and sales volumes compared to 2Q25.
Overall 3Q25 EBITDA and NPAT actual performance was lower than Budgeted which was principally due to lower ASP combined with lower sales volumes.
Despite this, 3Q25 financial performance still generated healthy margins
and profit levels.
2024
YTD
3Q24
YTD
3Q25
3Q24
3Q25
Financial Performance
(In Million USD)
Revenue
3,446.2
2,469.6
2,439.9
935.6
818.1
Gross Profit
1,332.8
914.7
773.4
332.4
247.0
EBITDA
1,355.0
920.1
805.3
347.1
272.0
Net Profit After Tax
943.4
635.0
533.7
247.9
177.2
Financial Ratios
Gross Profit Margin (%)
38.7%
37.0%
31.7%
35.5%
30.2%
EBITDA Margin (%)
39.3%
37.3%
33.0%
37.1%
33.3%
Net Profit Margin (%)
27.4%
25.7%
21.9%
26.5%
21.7%
Net Debt to EBITDA (x)
Net Cash
Net Cash
Net Cash
Net Cash
Net Cash
Operational Statistics
Overburden Removal (MBCM)
257.5
194.2
223.8
71.3
91.5
Strip Ratio (x) - based on production volume
4.5
4.9
4.6
5.0
4.4
Coal Production (MT)
56.9
40.0
48.3
14.4
20.6
Sales Volume (MT)
56.2
40.1
49.5
15.6
17.2
Average Selling Price (US$/MT)
61.3
61.5
49.3
60.1
47.5
Average Cash Costs (US$/MT)
37.8
39.2
33.5
38.4
32.2
1H25 Production
- Bayan is ranked 3rd by sales
40 35.9 33.5
Million Tonnes
32 24 16 8 0 27.7 21.7 14.5 10.4 volumes and production in Indonesia based on 1H25 actual performance.Bayan's 1H25 production and sales volumes increased by 8% and 31% over 1H24 levels.
Bumi Adaro Bayan PTBA Kideco ITMGSource: Company Filings, Company Data
1H25 Sales Volume
The first phase of Muara Pahu was opened in 2023 with the second phase completed in 1Q24 which has allowed us to commence
40 34.8 33.9
Million Tonnes
32 24 16 8 0 32.2 21.6 14.4 11.7expansion in 2024 and beyond.
This will allow Bayan to expand production at Tabang to more than 80 mtpa.
Bumi Adaro Bayan PTBA Kideco ITMGSource: Company Fillings. Company Data
Capex Intensity by Country (1) Tabang Capacity Growth
The Muara Pahu barge loading
40+
80+
…Unlocking tangible capacity upside at ~US$10/ton discretionary growth Capex130
159 161
175
207
218
facility which consist of 3 integrated lines of side dumps/crushers/conveyors and
barge loader were complete in the
1002023 2024+
85
65 71
5050
96 98 110
1Q24.
10 13 23
0Source: Wood Mackenzie Notes
Based on 2012 real dollars
US$460m Capex (include BCT) divided by an incremental 45+ Mtpa production / sales capacity
2017 - 2023 CAGR (Production)
All three barge loaders will add an additional 45+ million MT to our existing capacity.
Total expansionary capex in the region of US$ 460 million (2019-2026) for the Tabang Project including the 100km haul road, overland conveyors and barge
loaders at Muara Pahu and the
upgrade of the BCT.
-5 GEMS Bayan PTBA Adaro Kideco Bumi ITMG -1.0 -1.7 -4.4Source: Company Fillings. Company Data 4