Manhattan Gold Corporation LimitedASX: MHC

Promising Surface Exploration Informs Tibooburra RC Drilling Program

HIGHLIGHTS

  • Recent exploration by Novo at the Clone prospect included detailed structural, lithological and regolith mapping, pXRF and < 80# mesh soil sampling, and rock chip sampling.

  • Novo rock chip sampling returned peak results of 89.6 g/t Au and 41.9 g/t Au from mullock dump samples associated with historical workings, and 31.4 g/t Au and 10.4 g/t Au from quartz vein outcrop over 700 m of strike, supporting previous high grade drill results.

  • Soil sampling defined a ~ 600 m long and up to 250 m wide coherent anomaly > 30 ppb Au, with peak results of 1,585 ppb Au and 1,440 ppb Au.

  • Mapping defined a west dipping thrust (Clone Thrust) associated with high grade gold mineralisation and significant sericite-carbonate alteration.

  • A ~2,000 m targeted RC drill program is planned to commence in April 2025 to test this high-grade gold mineralised trend.

  • RC drilling at Clone completed by Manhattan Corporation Limited (ASX: MHC) in 2023, highlighted potential for shallow dipping high-grade gold mineralisation, with excellent drill results returned from 11 holes including1:

    • 7 m at 7.23 g/t Au from 81 m, including 3 m at 16.1 g/t Au (CL0007)

    • 9 m at 6.03 g/t Au from 16 m (CL0010)

    • 6 m at 4.22 g/t Au from 66 m, including 2 m at 11.65 g/t Au (CL0004)

    • 31 m at 1.29 g/t Au from 60 m, including 3 m at 6.52 g/t Au (CL0002)

  • The Manhattan RC program tested some 250 m strike of an interpreted trend > 700 m to a maximum depth below surface of 75 m.

  • The Clone prospect is underexplored with mineralisation open in all directions and trending under cover to the south.

  • The southern cover sediments extend for up to 15 km over the prospective target basement corridor and provide opportunities to explore for potential ‘blind discoveries’.

Mike Spreadborough, Executive Co-Chairman and Acting Chief Executive Officer, said: “We look forward to commencing our RC drill program at the Clone prospect, which forms part of our Tibooburra Gold Project, located in northwestern NSW.

“Tibooburra is a standout exploration opportunity due to previous high-grade drilling results and compelling exploration upside. We aim to start drilling this month and the program we have developed will test several priority gold targets which were identified through our recently completed three-week reconnaissance program. The remainder of 2025 is set to be a busy year exploration-wise for Novo and we are focused on executing on our strategy and delivering significant value to our shareholders.”

PERTH, Australia, April 01, 2025 (GLOBE NEWSWIRE) -- Novo Resources Corp. (Novo or the Company) (ASX: NVO) (TSX: NVO) (OTCQB: NSRPF) is pleased to announce that an RC program at the Tibooburra Gold Project (Tibooburra) (Figure 1), located in northwestern NSW is planned to commence in April 2025. The drill program will focus on the Clone prospect (Figures 2 and 3) over a strike of several hundred metres and is designed to test high-grade gold targets recently confirmed during a successful three-week field campaign of mapping and surface sampling.

Location of the Tibooburra Gold Project, in northwestern NSW.
Drone footage of mapping activities at the Clone prospect
Figure 1: Location of the Tibooburra Gold Project, in northwestern NSW.
Tibooburra project tenure, with regional geology, drill collars, main prospects, highlighting multiple parallel mineralised trends.
Figure 2: Drone footage of mapping activities at the Clone prospect

Figure 3: Tibooburra project tenure, with regional geology, drill collars, main prospects, highlighting multiple parallel mineralised trends.

Tibooburra is an advanced exploration opportunity which covers much of the historic Albert Goldfield (Figure 1). Tenure includes six granted exploration licences over 630 sq km.

The agreement with Manhattan Corporation Limited (ASX: MHC) (Manhattan)2 grants Novo an option to acquire a 70% interest in the tenements comprising this tenure, subject to (among other things) Novo meeting two minimum expenditure requirements over two 12 month periods. Refer to Novo’s 13 December 2024 news release titled “Novo strengthens portfolio with two High-Grade gold projects in NSW, Australia” for the detailed terms of the agreement with Manhattan.

Geological mapping and surface sampling of the Clone trend defined several targets that warrant drill testing or further surface geochemical sampling and review. Results from minus 80# mesh soil sampling confirmed Au anomalism associated with the Clone Thrust and splay structures, with rock chip sampling confirming high-grade gold mineralisation within the main zone of workings.

An initial Novo RC drill program of ~ 2,000 m is planned to commence in April 2025 and will target the main zone of historical workings at Clone over ~700 m of strike.

Overview

The Albert Goldfields lies on a unique district-scale bend at the boundary of the Thomson and Delamarian orogens, with stratigraphy wrapping around the Tibooburra granite intrusive complex to the northeast.

Over 200 historic workings on multiple lines, delineating over 34 km of interpreted mineralised trends have been identified at Tibooburra. Several targets were highlighted by Manhattan including New Bendigo, Clone, Pioneer, Elizabeth Reef and Good Friday (Figure 3). However, outside of the New Bendigo prospect, little systematic modern exploration has been conducted. The area is significantly under-explored, and satellite imagery and interpretation show untested cover sequences, particularly in the south. At Clone, extensive historical workings manifest over ~450 m strike and 20 m to 40 m in depth.

RC drilling by Manhattan in 2023 highlighted potential for shallow dipping high-grade gold mineralisation. Excellent drill results were returned in fresh rock from an initial 11-hole RC drill program testing 250 m strike to a maximum depth below surface of 75 m, including2:

  • 7 m at 7.23 g/t Au from 81 m, including 3 m at 16.1 g/t Au (CL0007)

  • 9 m at 6.03 g/t Au from 16 m (CL0010)

  • 6 m at 4.22 g/t Au from 66 m, including 2 m at 11.65 g/t Au (CL0004)

  • 31 m at 1.29 g/t Au from 60 m, including 3 m at 6.52 g/t Au (CL0002)

This mineralisation remains open in all directions, with targeted mineralised basement trending under cover sediments to the south. The cover sediments extend for some 15 km providing opportunities for exploration targeting potential ‘blind discoveries’.

Novo has not conducted data verification (as that term is defined in National Instrument 43-101 Standards of Disclosure for Mineral Projects and JORC 2012) in respect of the above data from New Bendigo and Clone and therefore is not to be regarded as reporting, adopting or endorsing those results/figures. No assurance can be given that Novo will achieve similar results.

Recent Soil and Rock Chip Sample Results

A three-week field campaign comprising geochemical surface sampling and detailed mapping of the main ~ 3 km strike at the Clone prospect was completed in February 2025, with all assay results returned. The field programs were devised to investigate controls on gold mineralisation and allowed Novo to design a follow up RC drilling program to validate previous drill results. Novo is anticipating that this program may significantly extend known mineralisation along strike, down dip and down-plunge.

Results from all aspects of the exploration work proved extremely promising, supporting the decision to commit to ~2,000 m of RC drilling at Clone in April 2025.

Mapping identified a package of folded and sheared deep marine meta-sediments ranging from siltstone (shale and slate) to phyllite with limited variation in grain size. Metamorphism of the host rocks is greenschist facies. Structure in the mapping area is dominated by complex folding (possibly multi-phase) including interpreted isoclinal folding in the immediate Clone area, overprinted by a strong NW trending regional foliation.

Mineralised late-stage NNW to NW trending moderately southwest dipping shears (interpreted as reverse faults) have been the focus for much of the historical workings. Generally, the best mineralisation occurs where these structures bend in a more northerly direction (Figure 4), producing 1 m to 10 m wide shear zones. The main shear, the Clone Thrust, is traceable over 3 km strike and trends under cover to the NW and SE. Several splay structures are also present and are potentially part of the fertile architecture of the belt (Figure 4 and Figure 5). NNE trending cross-cutting faults are common, with interpreted sinistral movement on the main shear zones. Mineralised veining includes west dipping late-stage quartz veins which vary between laminated, massive, brecciated and sheared, and contain rare sulphide and green sericite.

Structural mapping and thematically mapped minus 80# mesh soil samples over the ~ 3 km Clone Trend

Figure 4: Structural mapping and thematically mapped minus 80# mesh soil samples over the ~ 3 km Clone Trend

Alteration, especially in these mineralised shears, is dominated by intense sericite and minor sulphides (pyrite and arsenopyrite). Green sericite is present on quartz vein selvedges in almost all historic workings. A broad strong zone of alteration is present between the Clone Thrust and the Western Splay adjacent to the main Clone target.

Conventional minus 80# mesh soil sampling on a nominal grid of 20 m x 40 m over areas of historical workings, extending to 20 m x 80 m to the north and south, has defined a 600 m long coherent > 30 ppb Au anomaly with peak results of 1,585 ppb Au and 1,440 ppb Au over the main target area. See Appendix 1 for significant soil sample results.

Rock chip sampling (Figure 5 and Figure 6) yielded peak results of 89.6 g/t Au and 41.9 g/t Au from mullock dump samples at the northern end of the main Clone workings. The samples comprised sheared phyllite with multiple centimetre scale quartz veinlets and minor boxwork after sulphides. In the southern part of the main workings, peak results include 31.4 g/t Au and 10.4 g/t Au from within the west dipping Clone Thrust (Figure 7). Several samples collected in the main area graded > 3 g/t Au. See Appendix 2 for all rock sample results.

Soil sampling anomaly and rock chip sampling across the main Clone Prospect

Figure 5: Soil sampling anomaly and rock chip sampling across the main Clone Prospect

High-grade gold assay results may highlight the potential for a coarse component of gold in the mineralised system at Clone, leading to difficulties in obtaining accurate rock chip results. A program of 20-30 samples grading > 0.1 g/t Au will be re-assayed via screen-fire assay to assess the coarse gold deportment and better inform assays of drill samples.

Detailed map showing Manhattan RC drill collars, in addition to results from recent Novo rock chip and mullock dump sampling at Clone; results may not be indicative of mineralisation in the district
Rock chip sample results from an exposure of the west dipping Clone Thrust, highlighting a significant high-grade zone of mineralisation over approx. 8 m width with a peak result of 31.4 g/t Au from the western-most quartz vein; results may not be indicative of mineralisation in the district
Figure 6: Detailed map showing Manhattan RC drill collars, in addition to results from recent Novo rock chip and mullock dump sampling at Clone; results may not be indicative of mineralisation in the district

Figure 7: Rock chip sample results from an exposure of the west dipping Clone Thrust, highlighting a significant high-grade zone of mineralisation over approx. 8 m width with a peak result of 31.4 g/t Au from the western-most quartz vein; results may not be indicative of mineralisation in the district

Planned RC Drill Program

Geological mapping and surface sampling of the Clone trend defined several targets that warrant drill testing or further surface geochemical sampling and review.

Results from minus 80# mesh soil sampling confirmed Au anomalism associated with the Clone Thrust and splay structures, with rock chip sampling confirming high-grade gold mineralisation within the main zone of workings.

The initial RC drill program of ~ 2,000 m is planned to commence in April 2025 and will target the main zone of historical workings at Clone over ~700 m of strike.

A heritage survey has been completed by the Tibooburra Local Aboriginal Land Council (TLALC), with no heritage sites located on the drill pads or the field track required to access the northern drill holes. An APO for all proposed drillholes and the northern access track was successfully returned in March.

Authorised for release by the Board of Directors.

CONTACT

Investors:
Mike Spreadborough
+61 8 6400 6100
info@novoresources.com

North American Queries:
Leo Karabelas
+1 416 543 3120
leo@novoresources.com

Media:
Cameron Gilenko
+61 466 984 953
cameron.gilenko@sodali.com


QP STATEMENT

Mrs. Karen (Kas) De Luca (MAIG), is the qualified person, as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects, responsible for, and having reviewed and approved, the technical information contained in this news release. Mrs De Luca is Novo’s General Manager Exploration.

JORC COMPLIANCE STATEMENT

The information in this news release that relates to previously reported Exploration Results from Novo’s NSW Gold Portfolio is extracted from Novo's ASX announcement entitled Novo Strengthens Portfolio with Two High-Grade Gold Projects in NSW, Australia released to ASX on 13 December 2024 which is available to view at www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. The Company confirms that the form and context in which the competent persons findings are presented have not been materially modified from the original market announcement.

The information in this news release that relates to the previously reported exploration target at Belltopper is extracted from Novo’s ASX announcement entitled Belltopper Mineralisation Modelling Defines Prospectivity released to ASX on 25 September 2024 which is available to view at www.asx.com.au. The Company confirms that it is not aware of any new information or data that materially affects the information in the original market announcement and that the form and context in which the Competent Person’s findings are presented has not been materially modified from the original market announcement.

FORWARD-LOOKING STATEMENTS

Some statements in this news release may contain “forward-looking statements” within the meaning of Canadian and Australian securities law and regulations. In this news release, such statements include but are not limited to planned exploration activities and the timing of such. These statements address future events and conditions and, as such, involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by the statements. Such factors include, without limitation, customary risks of the resource industry and the risk factors identified in Novo’s annual information form for the year ended December 31, 2024 (which is available under Novo’s profile on SEDAR+ at www.sedarplus.ca and at www.asx.com.au) and in the Company’s prospectus dated 2 August 2023 which is available at www.asx.com.au. Forward-looking statements speak only as of the date those statements are made. Except as required by applicable law, Novo assumes no obligation to update or to publicly announce the results of any change to any forward-looking statement contained or incorporated by reference herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If Novo updates any forward-looking statement(s), no inference should be drawn that the Company will make additional updates with respect to those or other forward-looking statements.

__________________
1 Refer to ASX news release by Manhattan Corp dated 10/07/2023 – New High-Grade Gold Discovery
2 Refer to ASX news release by Novo Resources dated 13/12/2024 – Novo Strengthens Portfolio with Two High-Grade Gold Projects in NSW, Australia.

ABOUT NOVO

Novo is an Australian based gold explorer listed on the ASX and the TSX focussed on discovering standalone gold projects with > 1 Moz development potential. Novo is an innovative gold explorer with a significant land package covering approximately 5,500 square kilometres in the Pilbara region of Western Australia, along with the 22 square kilometre Belltopper project in the Bendigo Tectonic Zone of Victoria, Australia.

Novo’s key project area in the Pilbara is the Egina Gold Camp, where De Grey Mining is farming-in to form a JV at the Becher Project and surrounding tenements through exploration expenditure of A$25 million within 4 years for a 50% interest. The Becher Project has similar geological characteristics as De Grey’s 12.7 Moz Hemi Project#. Novo is also advancing gold exploration south of Becher in the Egina Gold Camp, part of the Croydon JV (Novo 70%: Creasy Group 30%). Novo continues to undertake early-stage exploration elsewhere across its Pilbara tenement portfolio.

Novo has also formed a lithium joint venture with SQM in the Pilbara which provides shareholder exposure to battery metals.

Novo has recently strengthened its high-quality, Australian based exploration portfolio by adding the TechGen John Bull Gold Project in the New England Orogen of NSW, and Manhattan Tibooburra Gold Project in the Albert Goldfields in northwestern NSW. Both projects demonstrate prospectivity for significant discovery and resource definition and align with Novo’s strategy of identifying and exploring projects with > 1 Moz Au potential. These high-grade gold projects compliment the landholding consolidation that forms the Toolunga Project in the Onslow District in Western Australia.

Novo has a significant investment portfolio and a disciplined program in place to identify value accretive opportunities that will build further value for shareholders.

Please refer to Novo’s website for further information including the latest corporate presentation.

Property Map

*An Exploration Target as defined in the JORC Code (2012) is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tonnes and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a Mineral Resource. Accordingly, these figures are not Mineral Resource or Ore Reserve estimates as defined in the JORC Code (2012). The potential quantities and grades referred to above are conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource and it is uncertain if further exploration will result in the estimation of a Mineral Resource. These figures are based on the interpreted continuity of mineralisation and projection into unexplored ground often around historical workings. The Exploration Target has been prepared in accordance with the JORC Code (2012), as detailed in the Company’s ASX announcement released on 25 September 2024 (available to view at www.asx.com.au). The Tonnage range for the exploration target is 1.5Mt to 2.1Mt, the Grade range is 6.6g/t Au to 8.4g/t Au and the Ounces range from 320koz Au to 570 koz Au. The Company confirms that it is not aware of any new information that materially affects the information included in the original market announcement and that all material assumptions and technical parameters underpinning the estimates in the original market announcement continue to apply and have not materially changed. Dr Christopher Doyle (MAIG) and Dr Simon Dominy (FAusIMM CPGeo; FAIG RPGeo), are the qualified persons, as defined under National Instrument 43-101 Standards of Disclosure for Mineral Projects, responsible for, and having reviewed and approved, the technical information relating to the Exploration Target. Dr Doyle is Novo’s Exploration Manager - Victoria and Dr Dominy is a Technical Advisor to Novo.

#Refer to De Grey’s ASX Announcement, Hemi Gold Project mineral Resource Estimate (MRE) 2024, dated 14 November 2024. No assurance can be given that a similar (or any) commercially viable mineral deposit will be determined at Novo’s Pilbara Projects.

Appendix 1 –Table of Soil Sample Results, GDA94 z54

Sample ID

Sample Type

Year

Easting (m)

Northing (m)

Height (m)

Au (ppb)

K00003

Soil

2025

584,379

6,725,360

191

20

K00005

Soil

2025

584,419

6,725,360

185

117

K00006

Soil

2025

584,440

6,725,359

185

291

K00007

Soil

2025

584,460

6,725,360

184

22

K00012

Soil

2025

584,559

6,725,359

189

15

K00023

Soil

2025

584,500

6,725,400

192

18

K00026

Soil

2025

584,441

6,725,399

192

29

K00027

Soil

2025

584,418

6,725,398

192

299

K00028

Soil

2025

584,401

6,725,400

190

38

K00029

Soil

2025

584,380

6,725,400

190

30

K00030

Soil

2025

584,359

6,725,400

189

16

K00031

Soil

2025

584,339

6,725,400

188

24

K00033

Soil

2025

584,400

6,725,480

190

23

K00034

Soil

2025

584,378

6,725,481

189

39

K00036

Soil

2025

584,360

6,725,479

188

31

K00037

Soil

2025

584,340

6,725,480

189

226

K00038

Soil

2025

584,320

6,725,480

188

40

K00039

Soil

2025

584,300

6,725,479

187

72

K00040

Soil

2025

584,279

6,725,479

187

21

K00041

Soil

2025

584,260

6,725,480

187

19

K00042

Soil

2025

584,238

6,725,479

187

21

K00046

Soil

2025

584,200

6,725,439

185

16

K00052

Soil

2025

584,320

6,725,439

190

137

K00053

Soil

2025

584,340

6,725,440

191

22

K00054

Soil

2025

584,361

6,725,439

190

24

K00055

Soil

2025

584,381

6,725,440

191

31

K00056

Soil

2025

584,401

6,725,440

192

154

K00057

Soil

2025

584,420

6,725,439

194

29

K00058

Soil

2025

584,441

6,725,440

195

32

K00075

Soil

2025

584,417

6,725,479

192

101

K00076

Soil

2025

584,440

6,725,519

191

178

K00077

Soil

2025

584,420

6,725,520

186

1,585

K00078

Soil

2025

584,406

6,725,520

185

848

K00079

Soil

2025

584,380

6,725,520

183

80

K00083

Soil

2025

584,240

6,725,520

179

19

K00084

Soil

2025

584,220

6,725,520

178

36

K00089

Soil

2025

584,321

6,725,560

177

15

K00090

Soil

2025

584,340

6,725,559

179

50

K00091

Soil

2025

584,360

6,725,558

180

286

K00093

Soil

2025

584,460

6,725,559

183

16

K00094

Soil

2025

584,480

6,725,559

183

35

K00102

Soil

2025

584,460

6,725,519

185

18

K00103

Soil

2025

584,301

6,725,640

185

112

K00104

Soil

2025

584,320

6,725,639

185

254

K00105

Soil

2025

584,341

6,725,640

186

188

K00106

Soil

2025

584,360

6,725,640

185

43

K00108

Soil

2025

584,400

6,725,639

187

16

K00113

Soil

2025

584,500

6,725,599

189

20

K00122

Soil

2025

584,361

6,725,600

187

40

K00123

Soil

2025

584,336

6,725,599

185

64

K00124

Soil

2025

584,321

6,725,600

190

21

K00125

Soil

2025

584,300

6,725,600

190

18

K00126

Soil

2025

584,280

6,725,599

189

62

K00127

Soil

2025

584,260

6,725,599

189

492

K00128

Soil

2025

584,240

6,725,600

188

38

K00129

Soil

2025

584,220

6,725,599

187

36

K00130

Soil

2025

584,220

6,725,639

187

15

K00131

Soil

2025

584,239

6,725,640

189

18

K00132

Soil

2025

584,260

6,725,640

191

29

K00133

Soil

2025

584,281

6,725,640

190

25

K00136

Soil

2025

584,439

6,725,680

197

31

K00138

Soil

2025

584,401

6,725,680

195

19

K00140

Soil

2025

584,361

6,725,680

192

18

K00141

Soil

2025

584,340

6,725,680

192

47

K00142

Soil

2025

584,319

6,725,677

192

1,440

K00143

Soil

2025

584,300

6,725,680

192

45

K00144

Soil

2025

584,276

6,725,679

191

20

K00149

Soil

2025

584,203

6,725,676

187

30

K00152

Soil

2025

584,160

6,725,759

184

17

K00153

Soil

2025

584,180

6,725,761

183

16

K00154

Soil

2025

584,240

6,725,759

182

21

K00155

Soil

2025

584,260

6,725,760

183

47

K00163

Soil

2025

584,420

6,725,760

186

29

K00168

Soil

2025

584,321

6,725,840

187

15

K00172

Soil

2025

584,220

6,725,840

185

23

K00176

Soil

2025

584,140

6,725,839

185

18

K00190

Soil

2025

584,221

6,725,920

187

51

K00223

Soil

2025

584,040

6,726,239

189

20

K00224

Soil

2025

584,060

6,726,240

189

21

K00239

Soil

2025

583,920

6,726,399

191

20

K00241

Soil

2025

583,880

6,726,399

191

25

K00253

Soil

2025

583,900

6,726,559

201

15

K00257

Soil

2025

583,820

6,726,559

205

15

K00258

Soil

2025

583,801

6,726,559

207

51

K00263

Soil

2025

583,701

6,726,560

198

23

K00268

Soil

2025

583,620

6,726,560

197

20

K00269

Soil

2025

583,600

6,726,560

196

24

K00274

Soil

2025

583,521

6,726,559

195

16

K00291

Soil

2025

584,361

6,725,880

189

19

K00306

Soil

2025

584,277

6,725,721

187

17

K00309

Soil

2025

584,340

6,725,720

186

16

K00322

Soil

2025

584,301

6,725,800

182

42

K00324

Soil

2025

584,200

6,725,800

183

22

K00333

Soil

2025

584,119

6,725,880

187

17

K00334

Soil

2025

584,141

6,725,880

186

21

K00338

Soil

2025

584,199

6,725,880

188

18

K00340

Soil

2025

584,239

6,725,880

188

20

K00354

Soil

2025

584,201

6,726,000

197

16

K00360

Soil

2025

583,900

6,726,160

183

15

K00451

Soil

2025

584,402

6,725,319

177

21

K00454

Soil

2025

584,461

6,725,320

179

75

K00455

Soil

2025

584,481

6,725,318

178

28

K00456

Soil

2025

584,500

6,725,320

181

21

K00479

Soil

2025

584,541

6,725,280

181

16

K00482

Soil

2025

584,482

6,725,280

177

19

K00499

Soil

2025

584,481

6,725,240

178

19

K00504

Soil

2025

584,460

6,725,719

190

55

K00506

Soil

2025

584,500

6,725,680

189

15

K00511

Soil

2025

584,520

6,725,599

182

18

K00512

Soil

2025

584,540

6,725,599

183

64

K00514

Soil

2025

584,579

6,725,560

186

17

K00528

Soil

2025

584,660

6,725,400

192

27

K00529

Soil

2025

584,640

6,725,400

193

31

K00539

Soil

2025

584,441

6,725,199

181

20

K00540

Soil

2025

584,461

6,725,200

181

15

K00550

Soil

2025

584,640

6,725,200

191

61

K00551

Soil

2025

584,660

6,725,200

190

16

K00567

Soil

2025

584,660

6,725,040

193

20

K00578

Soil

2025

584,860

6,725,039

190

32

K00601

Soil

2025

584,521

6,725,241

186

27

K00602

Soil

2025

584,541

6,725,240

188

15

K00611

Soil

2025

584,721

6,725,239

193

18

K00613

Soil

2025

584,425

6,725,160

186

22

K00614

Soil

2025

584,440

6,725,160

186

18

K00627

Soil

2025

584,660

6,725,161

187

26

K00658

Soil

2025

584,600

6,725,081

185

16

K00662

Soil

2025

584,680

6,725,080

185

32

K00663

Soil

2025

584,700

6,725,080

183

19

K00697

Soil

2025

583,520

6,726,720

197

16

K00708

Soil

2025

584,681

6,724,959

178

21

K00744

Soil

2025

584,701

6,724,802

178

26

K00762

Soil

2025

583,480

6,726,641

191

15

K00768

Soil

2025

583,580

6,726,640

192

24

K00772

Soil

2025

583,641

6,726,640

194

21

K00773

Soil

2025

583,661

6,726,640

196

18

K00800

Soil

2025

583,701

6,726,800

206

16

K00814

Soil

2025

583,599

6,726,960

189

19

K00846

Soil

2025

583,540

6,726,680

199

16

K00875

Soil

2025

583,740

6,726,881

201

15

K00888

Soil

2025

583,501

6,726,880

197

18

K00891

Soil

2025

583,442

6,726,880

193

48

K00896

Soil

2025

583,360

6,726,880

191

37

K00905

Soil

2025

583,620

6,726,600

204

22

K00953

Soil

2025

583,660

6,726,800

207

18

K00993

Soil

2025

583,440

6,726,840

193

18

K00994

Soil

2025

583,460

6,726,840

193

132

Appendix 2 –Table of Rock Sample Results, GDA94 z54

Sample ID

Sample Type

Year

Easting (m)

Northing (m)

Height (m)

Au g/t

R08501

Rock Chip

2025

584,630

6,725,239

188

0.01

R08502

Rock Chip

2025

584,207

6,725,875

185

0.01

R08503

Rock Chip

2025

584,136

6,726,016

186

<0.01

R08504

Rock Chip

2025

584,147

6,726,032

186

<0.01

R08505

Rock Chip

2025

583,959

6,726,024

182

<0.01

R08506

Rock Chip

2025

583,993

6,726,086

183

0.01

R08507

Rock Chip

2025

583,769

6,726,607

198

<0.01

R08508

Rock Chip

2025

583,701

6,726,775

192

<0.01

R08509

Mullock Grab

2025

583,636

6,726,526

193

0.01

R08510

Rock Chip

2025

583,637

6,726,527

192

0.03

R08512

Rock Chip

2025

583,652

6,726,499

193

0.01

R08513

Rock Chip

2025

583,645

6,726,507

192

0.01

R08514

Rock Chip

2025

583,538

6,726,696

192

<0.01

R08516

Rock Chip

2025

583,471

6,726,830

190

0.08

R08517

Rock Chip

2025

583,412

6,726,966

187

0.02

R08518

Rock Chip

2025

584,942

6,726,444

203

<0.01

R08519

Rock Chip

2025

584,886

6,726,665

210

0.01

R08520

Rock Chip

2025

584,269

6,725,573

183

0.04

R08521

Rock Chip

2025

584,271

6,725,573

182

0.02

R08522

Rock Chip

2025

584,274

6,725,576

183

0.02

R08523

Rock Chip

2025

584,254

6,725,619

182

0.01

R08524

Mullock Grab

2025

584,297

6,725,573

185

0.01

R08525

Rock Chip

2025

584,299

6,725,575

184

0.03

R08527

Mullock Grab

2025

584,285

6,725,724

185

0.02

R08528

Rock Chip

2025

584,292

6,725,735

183

0.01

R08529

Rock Chip

2025

584,284

6,725,730

183

0.01

R08530

Rock Chip

2025

584,286

6,725,731

183

0.03

R08531

Mullock Grab

2025

584,309

6,725,703

183

89.6

R08532

Mullock Grab

2025

584,313

6,725,690

184

41.9

R08533

Mullock Grab

2025

584,327

6,725,670

184

1.03

R08534

Mullock Grab

2025

584,330

6,725,669

184

1.7

R08536

Rock Chip

2025

584,345

6,725,654

184

7.72

R08537

Rock Chip

2025

584,351

6,725,649

183

4.01

R08538

Rock Chip

2025

584,356

6,725,603

187

3.88

R08539

Mullock Grab

2025

584,370

6,725,586

187

2.38

R08540

Rock Chip

2025

584,366

6,725,588

185

1.84

R08541

Rock Chip

2025

584,364

6,725,588

185

1.5

R08542

Rock Chip

2025

584,361

6,725,588

186

0.84

R08543

Rock Chip

2025

584,362

6,725,586

186

0.15

R08544

Rock Chip

2025

584,376

6,725,568

184

4.79

R08545

Rock Chip

2025

584,376

6,725,568

184

0.24

R08546

Rock Chip

2025

584,375

6,725,569

184

2.5

R08547

Rock Chip

2025

584,375

6,725,569

184

0.14

R08548

Rock Chip

2025

584,375

6,725,569

184

0.45

R08549

Rock Chip

2025

584,373

6,725,569

184

31.4

R08551

Rock Chip

2025

584,377

6,725,568

183

0.48

R08552

Rock Chip

2025

584,370

6,725,575

183

0.33

R08553

Rock Chip

2025

584,369

6,725,575

183

10.4

R08554

Rock Chip

2025

584,368

6,725,574

183

0.3

R08555

Rock Chip

2025

584,368

6,725,573

183

0.57

R08556

Mullock Grab

2025

584,468

6,725,586

186

0.08

R08557

Rock Chip

2025

584,476

6,725,589

187

0.04

R08558

Rock Chip

2025

584,473

6,725,587

187

0.03

R08559

Rock Chip

2025

584,401

6,725,519

188

4.91

R08561

Rock Chip

2025

584,400

6,725,518

188

0.44

R08562

Rock Chip

2025

584,400

6,725,518

188

2.32

R08563

Rock Chip

2025

584,407

6,725,506

198

0.09

R08564

Rock Chip

2025

584,399

6,725,518

188

0.12

R08565

Rock Chip

2025

584,490

6,725,541

199

0.02

R08566

Mullock Grab

2025

584,432

6,725,455

199

0.03

R08567

Rock Chip

2025

584,652

6,725,152

202

0.01

R08568

Rock Chip

2025

584,654

6,725,147

200

0.02

R08569

Rock Chip

2025

584,663

6,725,136

201

0.01

R08570

Rock Chip

2025

584,673

6,725,111

199

<0.01

R08571

Rock Chip

2025

584,439

6,725,717

194

0.01

R08572

Rock Chip

2025

584,477

6,725,594

187

0.02

R08573

Rock Chip

2025

584,277

6,725,409

182

0.02

R08574

Rock Chip

2025

584,347

6,725,438

185

<0.01

R08575

Mullock Grab

2025

584,416

6,725,394

186

0.19

R08576

Mullock Grab

2025

584,474

6,725,305

185

0.23

R08577

Rock Chip

2025

584,508

6,725,474

192

<0.01

R08578

Rock Chip

2025

584,230

6,725,586

188

<0.01

R08579

Rock Chip

2025

584,755

6,724,894

190

<0.01

R08580

Rock Chip

2025

584,728

6,724,883

189

<0.01

R08601

Rock Chip

2025

585,409

6,725,033

190

<0.01

R08602

Rock Chip

2025

585,433

6,724,539

171

<0.01

JORC Code, 2012 Edition – Table 1

Section 1: Sampling Techniques and Data

(Criteria listed in the preceding section also apply to this section)

Criteria

JORC Code explanation

Commentary

Sampling techniques

  • Nature and quality of sampling (e.g., cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

  • Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

  • Aspects of the determination of mineralisation that are Material to the Public Report.

  • In cases where ‘industry standard’ work has been done this would be relatively simple (e.g., ‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other cases, more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g., submarine nodules) may warrant disclosure of detailed information.

  • Rock chips samples were collected by grab sampling 1 – 3 kg of material. Sample sites were selected based to be representative on the lithology sampled, and the same sampling technique was employed at each sample site where possible.

  • Mullock grab samples were collected by grab sampling 1 – 3 kg of material from mullock dumps adjacent to historical mining activities. These are to provide some indication of potential grades obtained from historic workings and are not representative of in situ material.

  • Soil samples of 200 g were collected from small pits 10 cm – 40 cm in depth and sieved to <80# mesh. A 30 g aliquot was digested via fire assay and analysed via AAS finish.

Drilling techniques

  • Drill type (e.g., core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (e.g., core diameter, triple or standard tube, depth of diamond tails, face-sampling bit, or other type, whether core is oriented and if so, by what method, etc).

  • No drilling was undertaken.

Drill sample recovery

  • Method of recording and assessing core and chip sample recoveries and results assessed.

  • Measures taken to maximise sample recovery and ensure representative nature of the samples.

  • Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

  • No drilling was undertaken.

Logging

  • Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

  • Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

  • The total length and percentage of the relevant intersections logged.

  • No drilling was undertaken.

  • Rock chip samples are geologically logged with quantitative and qualitative data collected including a description of lithology, vein type and vein densities, and alteration.

Sub-sampling techniques and sample preparation

  • If core, whether cut or sawn and whether quarter, half or all core taken.

  • If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

  • For all sample types, the nature, quality, and appropriateness of the sample preparation technique.

  • Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

  • Measures taken to ensure that the sampling is representative of the in-situ material collected, including for instance results for field duplicate/second-half sampling.

  • Whether sample sizes are appropriate to the grain size of the material being sampled.

  • Rock chip samples were dried, crushed and pulverised with 85% passing < 75 µm (PUL-23) by ALS to create a 50 g charge, then assayed for Au by fire assay Au-AA26.

  • Soil samples required no preparation and were analysed for Au with a 30 g aliquot digested via fire assay and analysed via AAS finish.

  • The sampling techniques and sample sizes are considered appropriate for this style of mineralisation.

Quality of assay data and laboratory tests

  • The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

  • For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

  • Nature of quality control procedures adopted (e.g., standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (if lack of bias) and precision have been established.

  • The rock chip sample assay methodology is considered appropriate for the style of mineralisation tested. The method includes inserting 2 CRM standards and 2 blanks per 100 samples or at least one of each per sample submission.

  • The soil sample assay methodology has low level detection for gold and multi-elements and is considered appropriate for soil geochemistry for outcropping or near surface mineralisation. The method includes insertion of at least 2 blanks 2 CRM standards and 4 field duplicates per 100 samples.

  • No QAQC issues were detected.

Verification of sampling and assaying

  • The verification of significant intersections by either independent or alternative company personnel.

  • The use of twinned holes.

  • Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

  • Discuss any adjustment to assay data.

  • Primary data was collected in the field and stored using database compatible excel templates which were then forwarded to the database manager email for upload to the Geobank (v2022.5) database, buffered through a validation portal that ensures code and primary record compliance. Geobank is a front-end UX/UI tender software platform (developed and sold by Micromine) attached to a SQL v15.1 server.

  • Assay data was loaded from lab certificates received from the registered laboratory by an internal database manager or external database consultant, and industry-standard audit trails and chain-of-custody was adhered to.

  • Verification included checking the data against original logs and utilising laboratory certificates.

  • No adjustments of the assay data were made.

Location of data points

  • Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

  • Specification of the grid system used.

  • Quality and adequacy of topographic control.

  • All surface sample locations were recorded by hand-held GPS using the GDA 2020 zone 54 co-ordinate system.

Data spacing and distribution

  • Data spacing for reporting of Exploration Results.

  • Whether the data spacing, and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

  • Whether sample compositing has been applied.

  • Limited rock samples are taken and are indicative of potential grade tenor. These do not necessarily represent or imply any continuity or scale potential.

  • Grab samples from mullock dumps are not representative of in situ mineralisation and are only used as a guide as to potential historical activity.

  • Soil samples were taken on a nominal grid of 20 m by 40 m orientated to be perpendicular to the interpreted strike of the system.

Orientation of data in relation to geological structure

  • Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

  • If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

  • The soil sample grid was orientated to best intersect the lithological and structural trends at right angles.

  • Rock samples were taken across features with geological data recorded to best reflect unbiased sampling of possible mineralised structures.

Sample security

  • The measures taken to ensure sample security.

  • All samples are stored and managed on site by internal staff. Samples are then transported by reputable companies to a registered laboratory where they are stored in a locked facility before being tracked and processed through the preparation and analysis system at the laboratory.

Audits or reviews

  • The results of any audits or reviews of sampling techniques and data.

  • No audits have been undertaken.


Section 2: Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section)

Criteria

JORC Code explanation

Commentary

Mineral tenement and land tenure status

  • Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

  • The security of the tenure held at the time of reporting along with any known impediments to obtaining a license to operate in the area.

  • The Tibooburra project comprises tenements EL7437, EL8688, EL8691, EL9092, EL9094 and EL9202 and are held by Awati Resources Pty Ltd, a wholly owned subsidiary of Manhattan

  • Novo is required to spend $0.5M within the first earn-in period of 12 months, and $1M within the second earn-in period of 12 months to earn the option to form a 70 / 30 unincorporated joint venture with Awati, in which Awati is free-carried until the completion of a positive definitive feasibility study3

  • The tenement package is covered by two separate Native Title Claims. The Malyangapa Combined Proceedings (NC2022/0002) and the Wongkumara people (QC2008/003). The region is administered by the Tibooburra LALC based in Tibooburra

  • The tenements are currently in good standing and there are no known impediments.

Exploration done by other parties

  • Acknowledgment and appraisal of exploration by other parties.

  • Proto Resources and Investments completed an RC drilling program at the Pioneer and Phoenix project in 2006.

  • Meteoric Resources completed RAB and Aircore drilling at the New Bendigo, Phoenix, Pioneer and The Kink prospects in 2011 and 2012. RAB holes at New Bendigo returned very strong gold anomalous results that highlighted the potential for significant gold mineralisation at the New Bendigo Prospect. Meteoric Resources also completed soil, stream and rock chip sampling across selected areas of the tenure.

  • Awati Resources completed diamond drilling in 2016 at New Bendigo as part of the NSW department Co-operative Drilling Program and followed up with an RC drilling program in 2018 confirming the gold anomalies in the 2011-2012 RAB drill program.

  • Manhattan Corporation completed additional RC drill programs at New Bendigo, Clone, Phoenix and Pioneer, identifying a substantial high-order gold anomaly at the Clone prospect

Geology

  • Deposit type, geological setting, and style of mineralisation.

  • The Tibooburra Project covers the Tibooburra and Koonenberry Greenstone Belts. The district is widely regarded as the northern extension of the Victorian Goldfields. The project is located at the boundary between two major orogens (Delamarian and Thomson) and mineralisation consists of high-grade laminated quartz-sulphide veins hosted within Cambrian sedimentary rocks intruded by Devonian granites within a tightly folded and faulted domain.

Drill hole Information

  • A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes, including Easting and northing of the drill hole collar, Elevation or RL (Reduced Level – elevation above sea level in metres) of the drill hole collar, dip and azimuth of the hole, down hole length and interception depth plus hole length.

  • If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

  • Significant soil sample results that were the basis of the soil contours are listed in Appendix 1.

  • All rock sample results collected by Novo are listed in Appendix 2.

Data aggregation methods

  • In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (e.g., cutting of high grades) and cut-off grades are usually Material and should be stated.

  • Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of low-grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

  • The assumptions used for any reporting of metal equivalent values should be clearly stated.

  • No drilling was undertaken.

Relationship between mineralisation widths and intercept lengths

  • These relationships are particularly important in the reporting of Exploration Results.

  • If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

  • If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (e.g., ‘down hole length, true width not known’).

  • No drilling was undertaken.

  • Rock sample results are indicative in nature and, whilst representatively sampling the target lithology, do not contain any width or length information other than a qualitative description of the target.

Diagrams

  • Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported. These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

  • Refer to the body of the release for appropriate maps and diagrams.

Balanced reporting

  • Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

  • Due to the large number of soil samples, not all results are reported in Appendix 1. All results greater than 15 ppb are reported, comprising all samples used to generate anomalous soil contours.

  • All rock sample results are reported.

Other substantive exploration data

  • Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples – size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

  • No additional data.

Further work

  • The nature and scale of planned further work (e.g., tests for lateral extensions or depth extensions or large-scale step-out drilling).

  • Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

  • Refer to the body of the release. Novo intends to complete a 2,000m RC drilling program to test the high-grade mineralisation at Clone at depth, along strike and down plunge.


No Section 3 or 4 report as no Mineral Resources or Ore Reserves are reported in this Appendix

__________________
3 Refer to ASX news release by Novo Resources dated 16/12/2024 – Novo Strengthens Portfolio with Two High-Grade Gold Projects in NSW, Australia

Photos accompanying this announcement are available at

https://www.globenewswire.com/NewsRoom/AttachmentNg/540ec385-0b56-4930-9955-d918c15766e2

https://www.globenewswire.com/NewsRoom/AttachmentNg/1256943b-c790-4d1b-bfa3-653e664b92f0

https://www.globenewswire.com/NewsRoom/AttachmentNg/0829898f-fad0-4e99-84f4-c7018ea24d34

https://www.globenewswire.com/NewsRoom/AttachmentNg/2d4edc6c-d557-4e05-800c-aea39ffbe737

https://www.globenewswire.com/NewsRoom/AttachmentNg/3656539e-4794-4c59-9471-98604893f417

https://www.globenewswire.com/NewsRoom/AttachmentNg/8429e080-cfc2-4804-8710-bc4eef98d0a3

https://www.globenewswire.com/NewsRoom/AttachmentNg/af0bed22-4da7-4ac2-84c9-11251ea8e4e3

https://www.globenewswire.com/NewsRoom/AttachmentNg/a62ccce8-36d9-40ec-ad26-93c866d86068