Right Resources LimitedASX: RRE

Pilot Project Drilling Update

· Issued by Right Resources Limited

Filed with ASX · · 12 pages · English

• Drilling is progressing at the Pilot Project, with the first hole ever drilled at the project now at 459.4m depth and continuing. • Multiple styles of mineralisation have been intersected from 2m downhole to current hole depth. • Approval received to extend drill holes to a maximum depth of 700m (previously 600m), enabling broader testing of the mineralised system. • Assay results have not yet b

Right Resources Limited on 6ix

Story so far

Earlier from Right Resources

Later from Right Resources

All Right Resources news releases