Pilbara Nickel Exploration Update
Filed with ASX · · 15 pages · English
o A second hole, 22OSBRC002, was drilled by RC to 150m then extended with a diamond tail to 348.5m intersecting a point close to the centre of the FLEM (Fixed Loop EM) conductor plate • On completion of the drill holes, down-hole electro-magnetic (DHEM) surveying was undertaken with several low-order conductor targets identified within the sulphide-bearing conductor horizon • Laboratory analysis o
Earlier from Greentech Metals
- GRE: Drilling Commences at Osborne Nickel Target
- Additional Information LR 5.7.2
- Pause in Trading
- Deeper Cu-Zn Mineralisation Increases Potential at Whundo
- GreenTech Metals Ltd - Completion of 100% Earn-in of Whundo Cu-Zn Project
Later from Greentech Metals
- Large EM Copper Target Identified North Of Whundo
- Ayshia and Whundo Exploration Update
- Update on Testing Targets at Whundo Cu-Zn Project
- DHEM Survey Highlights New Targets at Shelby and Austin CuZn
- New Base Metals Prospect Acquired South of Whundo
Follow Greentech Metals into a list and get an email when it puts out news.
Follow Greentech Metals