Phase 2 Lithium Drilling Commenced at King Tamba
Filed with ASX · · 3 pages · English
Summary by 6ix AI
The drilling program will involve a significant number of holes designed to explore high-grade lithium anomalies in the area. Results from this drilling will be reported once laboratory analyses are completed.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Krakatoa Resources Ltd. on 6ix
Story so far
Earlier from Krakatoa Resources
- Placement to Advance King Tamba Lithium Drilling
- Lithium Exploration Drilling Expanded
- Thick Pegmatites Intersected at King Tamba
- Drilling Commenced at King Tamba
- Extension of Lithium Pegmatite Corridor at King Tamba
Later from Krakatoa Resources
- Multiple Pegmatites Drilled at King Tamba
- RC Drilling Resumes at King Tamba
- King Tamba Update
- Multi-element hits at King Tamba
- 1.2g/t Gold and 10.5% Copper Identified at Turon
Follow Krakatoa Resources into a list and get an email when it puts out news.
Follow Krakatoa Resources