Business

Nicola Mining to Commence Gold Production at Dominion Gold Project

Vancouver, British Columbia--(Newsfile Corp. - June 1, 2026) - Nicola Mining Inc. (NASDAQ: NICM) (TSXV: NIM) (FSE: HLIA), (the "Company" or "Nicola") is pleased to announce that it is in the final stages of preparation to commence gold and silver extraction operations at its Dominion Gold Project ("Dominion"). The high-grade gold project is located approximately 43 kilometres northeast of the Town of Wells and 110 kilometres southeast of Prince George, British Columbia. Material extracted from..

articleNicola Mining Inc.June 1, 20264/news/nicola-mining-to-commence-gold-production-at-dominion-gold-project-1
Nicola Mining to Commence Gold Production at Dominion Gold Project

About this update from Nicola Mining Inc.

Vancouver, British Columbia--(Newsfile Corp. - June 1, 2026) - Nicola Mining Inc. (NASDAQ: NICM) (TSXV: NIM) (FSE: HLIA), (the "Company" or "Nicola") is pleased to announce that it is in the final stages of preparation to commence gold and silver extraction operations at its Dominion Gold Project ("Dominion"). The high-grade gold project is located approximately 43 kilometres northeast of the Town of Wells and 110 kilometres southeast of Prince George, British Columbia. Material extracted from Dominion will be processed at the Company's wholly owned Merritt Mill, the only fully permitted milling facility in British Columbia authorized to process gold and silver material sourced from throughout the province. In anticipation of commencement of operations, the Company has advanced multiple key infrastructure, equipment, and operational initiatives, while also strengthening its reclamation profile through an additional $251,000 payment toward reclamation bonding requirements under Mines Act Permit MX-100000488[1], as well as the following: Mill feed extraction is expected to commence first week of July. Mr. Peter Espig, CEO of Nicola Mining Inc., commented: "Dominion represents a highly compelling high-grade gold asset that we believe possesses both exceptional near-term production potential and significant long-term strategic value for Nicola. The project has consistently demonstrated robust mineralization, with vein systems remaining open in all directions and returning grades of up to 113 grams of gold per tonne (3.31 ounces of gold per tonne) [3]. As we transition toward extraction, we are particularly excited by the opportunity to establish Dominion as a meaningful and sustainable source of premium-grade mill feed for our Merritt Mill operations. Concurrently, we continue to work closely with Blue Lagoon Resources Inc., which continues to achieve important production milestones while maintaining strong operational discipline and grade control. We believe the convergence of these developments positions Nicola for a transformative period of operational growth and increasing cash flow generation." Qualified Person The scientific and technical disclosures included in this news release have been reviewed and approved by Will Whitty, P.Geo., who is the Qualified Person as defined by NI 43-101. Mr. Whitty is Vice Pres...

View stock analysis, news, and events for Nicola Mining Inc.

Nicola Mining Inc.Peter EspigGold ProjectPrince George, British ColumbiaNicolaNicola MiningBritish Columbiagold and silverMerritt, British ColumbiaCompany