Mithril derisks target 1 with 75% indicated resource
Filed with ASX · · 23 pages · English
Summary by 6ix AI
The upgraded estimate includes a substantial portion classified as indicated, constrained within preliminary mining shapes, which enhances its applicability for future mine planning. This resource upgrade is seen as a major de-risking milestone, providing a stronger foundation for future development and economic evaluation.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Mithril Silver and Gold Limited on 6ix
In the deck
Earlier from Mithril Silver and Gold
- Mithril drills 7.25 m @ 4.01 g/t Au, 225 g/t Ag at T1
- MTH Drills 7.00 G/T Gold, 370 G/T Silver Over 9.65 M at T1
- High-grade and widespread silver and gold at target 3
- Mithril Appoints James Barr as Vice President, Exploration
- Mithril LiDAR study reveals 1.5 km trend & historic mines
Later from Mithril Silver and Gold
- Mithril Derisks Target 1 with Mine Constrained and Diluted Resource Upgrade - 75% Indicated
- Updated: Mithril Silver and Gold June 2026 Quarterly Report Upgraded T1 MRE and District Expansion Drill Program
- Mithril Silver & Gold Announces Filing Of Technical Report
- Wide, high-grade hits confirm 550M strike at target 4
- Mithril Drills Wide, High-Grade Intercepts Confirming 550m Strike with First Systematic Drilling in the Copalquin-Zaragoza Structure at Target 4
Follow Mithril Silver and Gold into a list and get an email when it puts out news.
Follow Mithril Silver and Gold
