PERTH, AUSTRALIA, Nov. 24 /CNW/ - Mirabela Nickel Limited (TSX: MNB, ASX: MBN) is pleased to announce an updated Proven and Probable Reserve for Santa Rita as follows:

        Santa Rita Proven and Probable Reserves November 2008

-------------------------------------------------------------------------
JORC Reserve        Mt          Ni          Cu          Co       Pt (ppb)
-------------------------------------------------------------------------
   Proven           15.1       0.65%       0.16%       0.017%      108
-------------------------------------------------------------------------
  Probable         105.9       0.59%       0.16%       0.015%       89
-------------------------------------------------------------------------
   Total           121.0       0.60%       0.16%       0.016%       91
-------------------------------------------------------------------------

Contained nickel - 726,000t (1,600 million lb)
Strip ratio - 7.2 to 1
Weighted average recovery - 70.2% Ni

Attached are the proposed Mine Production Schedule (Table 1.1) and Plant Production Schedule (Table 1.2).

The Reserve estimate is based upon the Potential Mill Feed Resource Estimate (pit optimised resource) announced in September 2008 as follows:

Measured and Indicated Resource - 130mt grading 0.60% Ni and 0.16% Cu
Inferred Resource - 20mt grading 0.60% Ni and 0.16% Cu
Strip ratio - 7.6 to 1

The Reserve estimate cannot include the 20mt of Inferred Resource (located at the base of the resource pit shell) and therefore uses a smaller pit design based only upon the Measured and Indicated Resource. An additional 11,000m of in-fill drilling is required to convert this Inferred Resource to Indicated, whereupon the Reserve estimate is likely to be upgraded to a larger pit broadly in line with that used for the resource.

The recent pit optimisation work highlights the need for further drilling in the Central deeps area, where the only constraint on the pit driving deeper appears to be a lack of data. Based on recent drilling results, the Southern high grade zone is broadening with depth particularly to the north into the Central deeps area. Accordingly, there remains the potential for at least one more substantial in-pit resource upgrade. An additional 8,000m of Pit Extension drilling is planned in this area once resource drilling recommences.

The final pit design was based on a pit optimisation shell run at a nickel price of US$7.00 lb (discounted) (Lodged on the Company's website at http://www.mirabela.com.au/projects_galleries.asp). The final pit is 2,300m long in the north-south direction and 1,250m wide in the east-west direction. The base of the pit is 555m vertical depth (from the eastern surface), and the total surface area is about 173 hectares.

The conversion of resources to reserves (as defined by the Canadian NI 43-101 and Australian JORC mining codes) requires detailed estimates of economic and physical parameters for mining. The resultant average owner-operator mining costs (US$ per tonne of material) are as follows:

Operating cost - $1.20/t(x)
Capital allowance - $0.24/t
Total mining cost - $1.44/t (or $11.85 pt ore)
(x) based on a long term exchange rate of R$2.20 to the US dollar

This is a modest increase in average mining costs relative to the Company's maiden reserve announced in January 2008, mostly attributable to the greater average depth of the pit. Also, about 10% of the total material movement will be by contractor mining to reduce the owner mining fleet requirements in peak years where material movement exceeds 55 million tonnes. The contractor mining cost is estimated to be US$1.57/t.

The Reserve is based on a plan to mine and process 6.4 million tonnes of ore per year, with a peak total mining rate of about 78 million tonnes per year. The ore will be treated through a conventional sulphide ore nickel concentrator currently under construction and scheduled for completion in mid 2009. The product from this processing facility will be a 13% nickel concentrate.

The detailed analysis carried out for the Reserve estimate will be included in an updated Santa Rita NI 43.101 report that will be published within the next 45 days.

(signed)                 (signed)
Nick Poll                Craig Burton
Managing Director        Corporate Director

Background

Mirabela Nickel Ltd owns 100% of the world class Santa Rita nickel sulphide project and is listed on the Australian and Toronto stock exchanges. With a JORC Reserve of 121mt grading 0.60% Ni for 726,000t of contained Ni, Santa Rita is the largest nickel sulphide discovery world-wide in the last 12 years.

Construction of a 6.4 mtpa nickel sulphide concentrator commenced in November 2007 and is currently 65% complete. The plant will produce 18,500 tpa of nickel in a sulphide concentrate from one open-cut mine starting from mid 2009 increasing to 26,000 tpa by mid 2010. At this rate of production the project will have a mine life of about 20 years.

The information in this report that relates to mine scheduling studies, ore reserve and mining costs estimation is based on information compiled by Carlos Guzman who is a professional Mining Engineer and Project Manager with NCL Brasil and a Member of the Australasian Institute of Mining and Metallurgy and is a Qualified Person in accordance with NI 43-101. Carlos Guzman is a consultant to Mirabela Nickel Limited. Mr. Guzman consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

All other technical information in this report has been reviewed by Nicholas Poll, who is a Member of the Australasian Institute of Mining and Metallurgy. Nicholas Poll is the Managing Director of the Company. Nicholas Poll consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Caution Regarding Forward Looking Statements: The forward-looking statements made in this announcement are based on assumptions and judgments of management regarding future events and results. Such forward-looking statements, including but not limited to those with respect to reserve targets or the development of a mine at Santa Rita and the Company's capital expenditures and estimated future production involve known and unknown risks, uncertainties, and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any anticipated future results, performance or achievements expressed or implied by such forward-looking statements. Such factors include, among others, the actual market prices of nickel, the actual results of current exploration, the actual results of future mining, processing and development activities, changes in project parameters as plans continue to be evaluated, as well as those factors disclosed in the Company's filed documents.

                 TABLE 1.1 - MINE PRODUCTION SCHEDULE

-------------------------------------------------------------------------
                                                           Mined Ore
              Mined Ore                                    (Ktonnes)
       ------------------------  Waste   Total   Strip  -----------------
Mining   Ore   Nickel  Nickel   Ktonnes Ktonnes  Ratio   Direct    To
Year   Ktonnes   (%)  (ktonnes)                         Tipping stockpile
-------------------------------------------------------------------------

Y00       357   0.697    2.49     7,643   8,000   21.40       -       357
Y01     1,160   0.679     7.9     5,840   7,000    5.04     580       580
Y02     5,898   0.580    34.2    36,652  42,550    6.21   2,949     2,949
Y03     6,400   0.606    38.8    48,600  55,000    7.59   3,200     3,200
Y04     6,400   0.544    34.8    48,600  55,000    7.59   3,200     3,200
Y05     6,400   0.611    39.1    48,600  55,000    7.59   3,200     3,200
Y06     6,400   0.595    38.1    51,600  58,000    8.06   3,200     3,200
Y07     6,400   0.579    37.1    48,600  55,000    7.59   3,200     3,200
Y08     6,400   0.585    37.5    68,600  75,000   10.72   3,200     3,200
Y09     6,400   0.561    35.9    71,440  77,840   11.16   3,200     3,200
Y10     6,400   0.565    36.2    48,600  55,000    7.59   3,200     3,200
Y11     6,400   0.578    37.0    48,600  55,000    7.59   3,200     3,200
Y12     6,400   0.571    36.6    48,600  55,000    7.59   3,200     3,200
Y13     6,400   0.624    39.9    48,600  55,000    7.59   3,200     3,200
Y14     6,400   0.690    44.1    48,600  55,000    7.59   3,200     3,200
Y15     6,400   0.620    39.6    69,209  75,609   10.81   3,200     3,200
Y16     6,400   0.616    39.4    69,208  75,608   10.81   3,200     3,200
Y17     6,400   0.571    36.6    36,816  43,216    5.75   3,200     3,200
Y18     6,400   0.627    40.1    11,237  17,637    1.76   3,200     3,200
Y19     6,400   0.618    39.6     6,258  12,658    0.98   3,200     3,200
Y20     4,779   0.661    31.6     3,192   7,970    0.67   2,389     2,389
-------------------------------------------------------------------------
Total 120,993   0.600   726.4  875,096  996,089    7.23  60,318    60,675
-------------------------------------------------------------------------


                TABLE 1.2 - PLANT PRODUCTION SCHEDULE

                                 Plant Feed
       ------------------------------------------------------------------
Mining   Ore   Nickel Nickel Copper Cobalt  Paladium Platinum  Gold   S
Year   Ktonnes   (%) (ktonnes) (%)    (%)     (ppb)     (ppb)  (ppb) (%)
-------------------------------------------------------------------------

Y01     1,517   0.683  10.4   0.163  0.018     44.7     119.3  71.9  0.00
Y02     5,898   0.580  34.2   0.152  0.016     35.4      81.2  49.9  0.00
Y03     6,400   0.606  38.8   0.148  0.016     42.2      93.6  56.8  0.00
Y04     6,400   0.544  34.8   0.144  0.014     58.2      99.5  58.4  0.00
Y05     6,400   0.611  39.1   0.153  0.016     50.4      90.9  57.6  0.00
Y06     6,400   0.595  38.1   0.152  0.016     44.6      91.1  55.7  0.00
Y07     6,400   0.579  37.1   0.151  0.016     44.8      94.6  57.2  0.00
Y08     6,400   0.585  37.5   0.151  0.016     46.4      97.6  57.8  0.00
Y09     6,400   0.561  35.9   0.150  0.015     37.2      78.1  46.9  0.00
Y10     6,400   0.565  36.2   0.153  0.015     31.9      67.4  44.2  0.00
Y11     6,400   0.578  37.0   0.156  0.015     36.2      82.5  52.1  0.00
Y12     6,400   0.571  36.6   0.156  0.015     32.9      78.3  53.0  0.00
Y13     6,400   0.624  39.9   0.163  0.016     49.9     102.3  68.2  0.00
Y14     6,400   0.690  44.1   0.172  0.017     63.0     138.2  82.6  0.00
Y15     6,400   0.620  39.6   0.167  0.016     44.2      96.0  66.2  0.00
Y16     6,400   0.616  39.4   0.168  0.016     36.0      82.5  59.1  0.00
Y17     6,400   0.571  36.6   0.162  0.015     34.6      73.5  51.8  0.00
Y18     6,400   0.627  40.1   0.172  0.016     37.4      89.6  65.3  0.00
Y19     6,400   0.618  39.6   0.166  0.016     32.6      85.3  60.0  0.00
Y20     4,779   0.661  31.6   0.177  0.016     41.4     107.0  69.3  0.00
-------------------------------------------------------------------------
Total 120,993   0.600 726.4   0.159  0.016     42.1      91.2  58.6  0.00
-------------------------------------------------------------------------

       ----------------------
          Nickel   Recovered
Mining   Recovery   Nickel
Year       (%)     (ktonnes)
-----------------------------

Y01        70.9       7.4
Y02        68.9      23.6
Y03        71.1      27.6
Y04        67.6      23.5
Y05        67.6      26.4
Y06        66.8      25.4
Y07        68.0      25.2
Y08        68.7      25.7
Y09        67.1      24.1
Y10        69.4      25.1
Y11        69.9      25.9
Y12        70.9      25.9
Y13        67.7      27.0
Y14        68.1      30.0
Y15        71.6      28.4
Y16        73.8      29.1
Y17        72.7      26.6
Y18        74.9      30.0
Y19        74.7      29.5
Y20        75.2      23.8
-----------------------------
Total      70.2     510.3
-----------------------------