Major Zinc-Lead Discovery at Earaheedy Project
Filed with ASX · · 14 pages · English
• 26 drill holes out of 26 intersected visual Zn-Pb mineralisation, 2 holes fast tracked (EHRC050 and EHRC044) have been received confirming a Major Zinc-Lead Discovery RC Drill Hole EHRC050 • 34m @ 4.22% Zn + Pb from 66m - Vertical Hole (True Width) o Includes 17m @ 6.65 % Zn + Pb from 73m With higher grade core zone of ▪ 14m @ 5.02% Zn, 2.03% Pb (7.05% Zn + Pb) from 76m RC Drill Hole EHRC044 • 2
Rumble Resources Limited on 6ix
Story so far
Earlier from Rumble Resources
- Response to ASX Price & Volume Query
- Drilling Update at Earaheedy Zinc-Lead-Silver Project
- Pause in Trading
- Drilling Commenced at Earaheedy Zinc-Lead-Silver Project
- Drilling Expands Large-Scale Gold-Copper-Silver System
Later from Rumble Resources
- $40m Placement to Fast Track Exploration at Earaheedy
- Investor Presentation
- Quarterly Activities and Cashflow Report
- Major Drill Program Commenced at Earaheedy Zn-Pb Disc
- Large Scale SEDEX Style System Emerging at Earaheedy Pro
Follow Rumble Resources into a list and get an email when it puts out news.
Follow Rumble Resources