Latest 8 Mile Drilling Supports Exploration Target
Filed with ASX · · 14 pages · English
Metal Bank Limited (ASX: MBK) (‘Metal Bank’, ‘MBK’ or the ‘Company’) is pleased to report the results of a six hole reverse circulation (RC) drilling program for a total of 750m on the Flori’s Find gold deposit at the 8 Mile Project in southeast Queensland, Australia (refer Figure 4). The drill program was aimed at evaluating the extension to near surface mineralisation at Flori’s Find, both down
Story so far
Earlier from Metal Bank
- Signficant Gold Target Defined at Eidsvold Project
- 8 Mile Maiden Gold Mineral Resource and Exploration Target
- Resignation of Managing Director
- Large Gold System Emerging at 8 Mile Project
- Amended Quarterly Cashflow Report
Later from Metal Bank
- MBK grants option to acquire its Triumph tenements
- Placement and Entitlement Offer to raise up to $2.11M
- Entitlement Offer Prospectus
- Placement Completed and Entitlement Offer Prospectus Lodged
- Drilling contract signed and exploration programs commenced
Follow Metal Bank into a list and get an email when it puts out news.
Follow Metal Bank