Talisman Mining LimitedASX: TLM

Lachlan Project Update - RC Drilling Program

· Issued by Talisman Mining Limited

Filed with ASX · · 8 pages · English

• Drill contractor appointed and drill rig mobilised for commencement of drilling at the Lachlan Project by the end of October 2019. • 2,600 metre Reverse Circulation (RC) program across five priority gold targets, including: • A large high-grade gold-in-soil anomaly at the Harding’s Prospect, extending over 1km with a peak of +500ppb Au • Twin parallel high-grade gold-in-soil anomalies at +2km Me

Talisman Mining Limited on 6ix

Story so far

Earlier from Talisman Mining

Later from Talisman Mining

All Talisman Mining news releases