Talisman Mining LimitedASX: TLM

Exploration Update -Lucknow Gold Project

· Issued by Talisman Mining Limited

Filed with ASX · · 14 pages · English

• Maiden drilling program targeting interpreted high-grade lode offset position of the historical Lucknow Project (historical production +400,000oz at an estimated mined grade of +100g/t) advancing, with the first hole, LUDD001, completed to a final depth of 621.5m. • The hole intersected a highly fractured zone which is interpreted to represent the flat-lying fault that has offset the main lode c

Talisman Mining Limited on 6ix

Story so far

Earlier from Talisman Mining

Later from Talisman Mining

All Talisman Mining news releases