La Mascotte gold results confirm down-plunge continuity
Filed with ASX · · 19 pages · English
Summary by 6ix AI
The results indicate continuity of down-plunge mineralisation and are being incorporated into the first JORC Resource Estimate for La Mascotte, expected soon. Additionally, drilling at the Knockhill and Royal Star prospects has intercepted further mineralisation, supporting previous discoveries. The company is also assessing assay results from the Pianto project and conducting reconnaissance at other project areas.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Kalgoorlie Gold Mining Limited on 6ix
Earlier from Kalgoorlie Gold Mining
- La Mascotte results confirm 500m strike length
- Diamond Drilling Commences at La Mascotte
- Kalgoorlie Gold Loyalty Option Prospectus
- Strong auger results define new gold targets
- Targeting underway at Pinjin and Ninga Mia Projects
Later from Kalgoorlie Gold Mining
- First La Mascotte Mineral Resource
- Pinjin farm-in & acquisition
- $1.4m institutional share placement and $0.5m SPP
- Thick shear-hosted gold mineralisation at Kirgella Gift
- High-grade gold in surface rock chips at Zelica Project
Follow Kalgoorlie Gold Mining into a list and get an email when it puts out news.
Follow Kalgoorlie Gold Mining