INVESTMENT HIGHLIGHTS
Advancing a world-class Cu project in Namibia
Simple, scalable, near term. Low risk, low cost, long life.
Investor Presentation / April 2026 Heye Daun: President & CEO
INVESTMENT HIGHLIGHTS - THE WORLD CLASS NEW HAIB Cu/Mo PROJECT
Excellent Pedigree: Formerly Rio Tinto and Teck owned, >120,000m of historical drilling and extensive metallurgical
testwork. Enhanced PEA & technical studies completed in 2025 incl. +55,000m infill drill program underway.
Technically Simple & Economically Sound: Large-scale, low cost, long life. Scalable, pre-PFS-stage open pit sulphide Cu/Mo/Au project located at low altitude in an ideal, infrastructure-rich area of southern Namibia close to the South African border. PFS to be published in H2 2026.
Refinanced under credible new Leadership: Since end of 2024 under proven Namibian leadership & technical team with impeccable track record of successful Namibian mine development & shareholder value creation.
Proven Value Creation Strategy: Stated aim of optimizing, right-sizing and de-risking the project towards an investment decision and/or asset/equity sale.
Low Equity Valuation
TSXV:KRY 2
Highly successful business partnership. Delivered significant shareholder value
through multiple successful mining exits since 2011.
Proven leadership & technical team with strong Namibian roots.
- Focus on core competence (identify, acquire, advance) and repeating past success.
In early 2024 took over leadership & management control of TSXV-KRY and initiated turn-around (refinanced, new technical team & strategy)
In progress …..
Completed 2024
Completed 2016 Completed 2011
Change in management control in early 2024
~$100m working capital raised since 2024
~10x growth in share price since early 2024
PEA-stage
PFS Q4 2026
$390m* cash sale to Yintai**
Transaction closed 2024
Founded 2016 by HD/AF
Competitive bid process and navigation of complex approvals
3moz, DFS-stage, fully permitted
Sold in $200m merger with Ross Beaty's Odin Mining to form Lumina Gold in 2016 (EQX contribution ~$70m)
HD negotiated transaction with Ross Beaty
PFS-stage, sold to CMOC
for $581m
$180m sale to B2Gold
Transaction closed in 2011
Co-founded 2009 by HD/AF+
1.8moz, PEA-stage & largely permitted in 2011
Currently in production,
~200kozpa
* incl. break-fee, reverse break-fee & bridge equity
Executive Team
Heye Daun
President & CEO
Namibian mining engineer and company builder with +25 years of mining & public markets experience
Three successful exits: OSI sold to Shanjin for $368m in 2024; AYX sold to BTO for $180m in 2012 and EGX merged into LUM in $200m transaction in 2016
Previous roles in banking & fund management in South Africa. First 10 years of career with Rio Tinto, AngloGold & Goldfields, building & operating mines in Africa
Tony Da Silva
Chief Financial Officer
Qualified Chartered Accountant with + 20 years of experience as a finance professional in private and public companies, auditing and capital asset management,
Ex-CFO for Osino Resources, sold to Shanjin for $380m Previously with Nexia International and BlueAlpha Investment Management.
Management Team
Alan Friedman
Chairman
Toronto-based public markets entrepreneur with 25 years of experience in acquisitions, financings, go-public transactions and M&A
Co-founder and Director of TSX-V listed Eco (Atlantic) Oil and Gas Ltd., and co-founder of Auryx Gold Corp. and Osino Resources Corp. Formerly with Investec Bank and Director of the Canada-Southern Africa Chamber of Business
Two successful mining exits: AYX sold to BTO for C$ 180m in 2012 and Osino
sold to Shanjin for C$ 380m in 2024
Charles Creasy
VP Project
Steve Burks
Senior Met Study
Jon Andrew
VP Exploration
Simson Kupindi
Operations Geology
Rob Zipplies
Sustainability
Julia Becker
Corporate
CAPITAL STRUCTURE
SHAREHOLDER OVERVIEW
SIGNIFICANT SHAREHOLDERS
RESEARCH COVERAGE
Share Price (April 14, 2026) | C$3.41 |
52-Week Trading Range | C$0.85 - 3.90 |
Basic Shares Outstanding | 120.33m (est.) |
Options Outstanding | 0.58m |
RSUs Outstanding | 7.55m |
Warrants Outstanding | 4.59m |
Fully Diluted Shares Outstanding | 132.72m |
Market Capitalization (FD) | C$452.58m |
Estimated Cash (Jan 30, 2026) | ~C$66.0m |
Debt (excl. vehicle finance) | Nil |
Other 54%
120.3m
Issued
Institutions, Strategics, & HNW 26%
Teck
~5%
Management
& Directors
SHARE PRICE PERFORMANCE (RELATIVE 1-YEAR)
CAD51m financing
concluded Jan 2026 @ C$2.45/share
~15%
Ross Beaty
Management & Namibian HNW
Jamie Spratt | $5.50 | |
T. Combaluzier | $5.10 | |
Cole McGill | $4.25 | |
Bereket Berhe | $4.00 |
Current & former in-country mining producers (gold, diamonds, uranium, copper and industrial metals)
+120 year mining history
STABLE & MINING FRIENDLY
Stable democracy, independent judiciary, diverse economy
Transparent system of mineral & surface title
Strong political and social support of mining with stated ambitions to develop mineral resources
EXCELLENT INFRASTRUCTURE
Excellent physical & social infrastructure
Within 20km's of essential utilities, roads, grid power, water supply & well-serviced towns
WELL-ESTABLISHED MINING INDUSTRY
Major revenue earner & employer
Stable tax code and fair fiscal terms
N$ sovereign bonds trading at 8.3% YTM, comparing well to other favorable mining development jurisdictions such as Botswana (10.2%), Mexico (7.8%), and Brazil (9.7%) for similar maturities
Haib is a large, world-class, advanced open-pit Cu/Mo porphyry deposit with a long history of exploration & project development
One of a few Paleoproterozoic porphyry copper
deposit in the world (two in Namibia).
Excellent pedigree (Falconbridge, Rio Tinto, Teck) with a long history of exploration & project advancement
Due to its age (1.9Ga), multiple metamorphic and deformation events, but classic mineralization and alteration features typical of these deposits remain.
Mainly chalcopyrite with minor bornite and chalcocite present
Comparable size & grade projects in younger belts; Pebble (Alaska), Warintza (Ecuador). Tier 1 examples often have significant supergene enrichment; Escondida (Chile)
Haib Cu/Mo
Porphyry Project Location
Approximate Future Open Pit Outline
Haib Open Pit
Orange river water pump station, pipeline & site water storage dam
Existing Grid power close to site (to be upgraded)
Grid Power
Application for NamPower to conduct a capacity assessment to connect to the 220kV line 45km from the plant site
- 150MW power demand sufficient grid power available from SA grid via Namibia
PV, wind power assessment underway
Water Supply
- 20m m3 pa water demand for a 20mtpa plant. Various supply scenarios:
- Orange river source: (9km) plus on- site water storage in attenuation dams - capacity for up to 6 month's water storage
- Neckartal dam alternative: (230km pipeline) backup / growth option being advanced
Category
Indicated Inferred
Tonnes (Mt)
414
345
Cu Grade (%)
0.35
0.33
Cu Content Cu Content (Mlbs) (kt)
3,216 1,459
2,503 1,136
August 2024 MRE at 0,25% cut-off grade
TSXV:KRY 10
HAIB PROJECT
NW-SE Longitudinal Section Looking North-east
0m 250m 500m
PLANNED FUTURE SITE LAYOUT (CLAUDE AI-GENERATED)
Image Credit: Tertius Liebenberg / Capricorn Asset Management
-
Right-size & Optimize:
Complete met testwork, demonstrate techno-economic feasibility of conventional sulfide flotation process
Investigate viable, novel processing techniques to enhance process flowsheet
Deliver Updated PEA (end Q2 26) & Interim MRE Update (Q1 2026)
Enhanced PFS (Q4 2026)
-
Deliver Additional Upside:
Improve MRE size and grade (Mo/Au by-products, high grade shoots, low grade halo)
Evaluate low grade processing options (conventional mill/float + sorting vs. heap leach options)
Demonstrate effectiveness of ore sorting, coarse particle flotation (CPF) & heap leach trade-offs
-
Further De-risk & Permit:
Establish strong social license (national, regional, local)
Enhanced infrastructure & utility trade-off studies (water, power, transport)
Complete major permitting (environmental & mine permitting)
Best-in-class specialist mining & engineering consultants, directed by proven & highly competent in-house technical team with a fifteen (15) year track record of successful Namibian mine development and project exits.
Large Scale and De-risked
28mtpa conventional Milling & Flotation (>0.225% Cu) + 7mtpa Heap Leach (>0.15% Cu)
Conventional open pit with 1.8 stripping ratio
PEA based on historical MRE, with significant future upside (pending completion of 55,000m drill program)
Life-of-Mine Avg Payable Annual Cu Production(2) Unit Costs (Y1-10) C1 / AISC Capital Intensity (3) 23 Years 92,000 tpa $1.81/lb & $2.05/lb 16,871/t Cu
Does not include $159 million of H/L and SX/EW Capex in years 2 and 3
92,000 Cu production (first 10 years) and 88,000 (Life-of-Mine)
First 10 Years of Production, Upfront Capital / Average Cu Production per annum (first 10 years)
C$35m work program aiming to increase MRE grade and size, optimize & right size & demonstrate the techno-economic feasibility of a 100ktpa open pit copper mine
Aiming to deliver a permitted, de-risked PFS project, with financing, DFS & implementation to commence in 2027
2024 2025 2026 2027
EXPLORATION PHASE
STUDY PHASE
FEASIBILITY & FINANCING
IMPLEMENTATION PHASE
Drilling & Resource
MRE
Update
55,000m resource conversion & growth drill program
H a i b C o p p e r P r o j e c t
Studies
Met Testwork & Trade-offs
PEA
MRE
Update
PFS
Variability Testwork
DFS & FEED
Permitting
Permitting (Mining & Environmental)
Site-specific Permits
Financing
Project Financing
Construction
EXPLORATION
EXPLORATION
EXPLORATION &
EXPLORATION
License consolidation,
data interpretation
Target definition, target testing, discovery drilling
O t h e r
Zambia/Namibia Regional Exploration
Sustainability Management
Developing a sustainability plan and implementation roadmap2025
2026
That is materiality-driven and considers compliance, risk, stakeholder and investor expectations, best practices and business strategy
Develop responsible mining implementation roadmap
Define Koryx's responsible mining narrative
Map and engage community stakeholders
Develop local content plan (employment, supply, economic development)
Ensure environmental stewardship, regulatory compliance and high occupational health & safety standards
Guiding frameworks and standards
Continue embedding sustainability practices and improve sustainability performance
Publish inaugural sustainability report
THE NAMIBIAN MINING
What is this data showing?
Revenue breakdown per tonne of copper produced at Koryx Copper s Haib project.
Revenue per tonne Cu
Local Spend
Foreign Spend
PAYE
Import Duties Revenue-based Taxes
5134
5140
5380
Final Investors Returns
20%
money go?
67%
of revenues captured by Namibia
Source: Wood
Ma c kenzie Anolysis
These numbers are ba se d on Koryx Cop per's recently
pu bI is he d, and pu blic Iy
COPPER
5262
ava ial b Ie Pre limina ry
Economic Assessment and the projections made therein. Refer to koryxco pper.com
Copper Developers Junior Copper Producers Intermediate Copper Producers1.50x
1.37x
1.27x 1.37x
1.19x
0.95x
0.87x
0.77x 0.85x
0.71x
0.61x
Developers Median: 0.42x
0.47x
0.39x 0.44x 0.45x 0.46x
0.32x 0.38x
0.31x
0.22x 0.27x 0.28x
0.12x
0.06x 0.11x
Alta
St.
Augustine
Oroco
Caravel
Gunnison
Hot Chili
Koryx
Western Copper
Aldebaran
SolGold
Northern Dynasty
ATEX
Solaris
Northisle
Arizona Sonoran
Faraday
Marimaca
Trilogy
NGEx
Ivanhoe
Electric
Atalaya
Capstone
29Metals
Sandfire
Lundin Mining
(ratio)
Ero Copper
Source: Street consensus broker estimates
Notes: Metrics accounted for on an attributable basis for Trilogy, Oroco, Aldebaran and NGEx. Pricing date as of 13-Feb.
PEA-stage copper exploration and development company focused on advancing its 100% owned, advanced-stage Haib Copper Project in Namibia, whilst also building a portfolio of copper exploration licenses in Zambia.
Highly Capable Team
Multi-exit track record in capital markets, mining project development and M&A
Quality Asset Pedigreed Haib Cu/Mo project long-life, low-risk, low-cost, fast-tracking to development
World-class Jurisdiction
Namibia is stable, mining-friendly with excellent infrastructure & predictable permitting
Blue-chip Financial Backing Management, Ross Beaty, Teck (Anglo), Institutions & Namibian HNW
Excellent Growth Potential Right-size & optimize, improved MRE, improved PFS due end 2026
Low Equity Valuation Low valuation, downside protected, primed for re-rating Major near-term Catalysts MRE Update Q1 and PFS Q4 2026