Business
Koryx Copper Announces Further Significant Drill Results for the Haib Copper Project, Southern Namibia
Highlights 17 drill holes reported with consistent, wide intercepts up to 599m in width. CuEq Grades exceeding average MRE grade with pockets of higher-grade

About this update from Koryx Copper S.a.
Highlights 17 drill holes reported with consistent, wide intercepts up to 599m in width. CuEq Grades exceeding average MRE grade with pockets of higher-grade Au and Mo. Best 8 of 17 drill hole assays as follows: • HM132: 150m @ 0.45% CuEq (157ppm Mo, 0.048g/t Au) (90 – 240m) incl. 28m @ 0.67% CuEq (282ppm Mo, 0.048g/t Au)22m @ 0.56% CuEq (57ppm Mo, 0.041g/t Au) (8 - 30m)18m @ 0.40% CuEq (23ppm Mo, 0.018g/t Au) (466 – 484m)60m @ 0.37% CuEq (62ppm Mo, 0.023g/t Au) (510 – 570m) • HM129: 144m @ 0.36% CuEq (136ppm Mo, 0.021g/t Au) (294 - 438m)84m @ 0.33% CuEq (30ppm Mo, 0.041g/t Au) (0 - 84m) • HM130: 132m @ 0.41% CuEq (37ppm Mo, 0.022g/t Au) (6 - 138m) incl. 18m @ 0.53% CuEq (51ppm Mo, 0.019g/t Au) • HM124: 94m @ 0.42% CuEq (35ppm Mo, 0.035g/t Au) (76 - 170m) Incl. 16m @ 0.66% CuEq (80ppm Mo, 0.051g/t Au)10m @ 0.55% CuEq (86ppm Mo, 0.040g/t Au) (190 – 200m) 52m @ 0.62% CuEq (77ppm Mo, 0.040g/t Au) (212 – 264m) 14m @ 0.39% CuEq (4ppm Mo, 0.042g/t Au) (30 - 44m) • HM145: 38m @ 0.57% CuEq (152ppm Mo, 0.031g/t Au) (160 - 198m) incl. 7m @ 0.91% CuEq (514ppm Mo, 0.043g/t Au) • HM126: 36m @ 0.45% CuEq (161ppm Mo, 0.024g/t Au) (16 – 52m)32m @ 0.36% CuEq (195ppm Mo, 0.018g/t Au) (60 – 92m)26m @ 0.39% CuEq (116ppm Mo, 0.019g/t Au) (102 – 128m) • HM123: 18m @ 0.78% CuEq (97ppm Mo, 0.027g/t Au) (52 - 70m)28m @ 0.40% CuEq (46ppm Mo, 0.036g/t Au) (238 - 266m) • HM125: 76m @ 0.40% CuEq (36ppm Mo, 0.033g/t Au) (80 – 156m) incl. 8m @ 1.09% CuEq (58ppm Mo, 0.068g/t Au)38m @ 0.40 CuEq (237ppm Mo, 0.028g/t Au) (220 – 258m) 30m @ 0.34% CuEq (446ppm Mo, 0.021g/t Au) (274 – 304m) Drilling is ongoing with 14 drill rigs engaged in infill, growth, geotech and exploration drilling. Significant progress made with ongoing met testwork aiming to simplify and optimize the processing flow sheet. A more detailed project update describing this will be ...