VANCOUVER, Sept. 8 /CNW/ - Kimber Resources Inc. (AMEX:KBX, TSX:KBR)
Kimber Resources is pleased to report further drill results from the
Monterde Project.
Results include three Reverse Circulation ("RC") holes on the Carotare
deposit (CTR), one core hole (MTC) and 19 RC holes (MTR) on Carmen deposit.
The results also include two of the best gram-metre intervals we have reported
from the more than 400 holes on the Carmen deposit.
<<
Highlights include:
Carotare
--------
CTR-38 12 metres (at) 2.35 g/t Au eq.
including a 4 metres (at) 5.10 g/t Au eq
Carmen
------
MTR-387 42 metres (at) 6.01 g/t Au eq.
including 6 metres (at) 27.65 g/t Au eq.
MTR-389 18 metres (at) 11.31 g/t Au eq.
including 10 metres (at) 19.38 g/t Au eq.
>>
Drill results at Carotare are from the eastern part of the deposit.
CTR-38 was a step-out to the NE of CTR-33 (reported August 8, 2006) and the
most notable interval from the hole was 12 metres of 2.35 g/t Au eq.
At Carmen, MTR-387 with 42 metres of 6.01 g/t Au eq. including 6 metres
of 27.65 g/t Au eq. was a step out, down dip and located in the Cob structure
which is located to the east of the main Carmen structure. This structure was
not mined by the old-timers but the grades in this interval (eg. 6 metres (at)
27.65 g/t Au eq) are consistent with some of the material they took from
Carmen at that time. MTR-388 also has high grade intercepts including 8 metres
of 9.38 g/t Au eq. and was targeting the Cob structure as well.
MTR-389 with 18 metres of 11.31 g/t Au eq. including 10 metres of 19.38
g/t Au eq. in the southern part of the main Carmen structure. Again, this
material would have been of economic interest for the old-timers. These
pockets of high grade are typical of the deposit and make very good open pit
material.
<<
Gold
Equiv-
Drill Hole From To Interval Gold Silver alent
---------- ---- --- -------- ----- ------ -------
(m) (m) (m) (g/t) (g/t) (g/t)(x)
CTR- 38 40 52 12 0.566 134 2.35
incl 46 50 4 0.569 340 5.10
and 142 148 6 1.593 3 1.63
CTR- 39 30 42 12 1.403 19 1.65
and 52 60 8 0.869 4 0.93
CTR- 40 14 32 18 0.804 9 0.93
and 94 98 4 2.273 84 3.39
MTC- 35 86 96 10 0.439 90 1.64
and 200 208 8 0.461 37 0.95
and 242 256 14 1.250 125 2.91
and 280 284 4 2.178 2 2.21
MTR-384 74 82 8 5.252 65 6.12
and 218 234 16 3.793 12 3.95
MTR-385 Short intervals of low-grade
MTR-386 44 48 4 0.456 135 2.25
and 68 78 10 0.179 42 0.74
and 88 106 18 0.016 35 0.48
and 196 200 4 1.164 26 1.50
and 210 264 54 1.372 55 2.10
hole ended in mineralization
MTR-387 172 176 4 0.901 110 2.37
and 196 238 42 4.751 95 6.01
incl 216 222 6 24.250 255 27.65
and 248 256 8 0.696 45 1.29
hole ended in mineralization
MTR-388 26 30 4 2.060 31 2.47
and 188 218 30 1.974 93 3.22
incl 210 218 8 6.678 203 9.38
and 264 278 14 2.969 42 3.53
incl 270 276 6 6.377 49 7.03
hole ended in mineralization
MTR-389 96 102 6 0.517 47 1.14
and 124 142 18 9.285 152 11.31
incl 130 140 10 16.132 227 19.38
and 152 160 8 0.178 43 0.75
MTR-391 206 214 8 1.031 56 1.77
hole ended in mineralization
MTR-392 224 236 12 3.652 98 4.96
and 284 296 12 1.099 6 1.17
MTR-393 156 160 4 1.004 112 2.50
and 222 234 12 0.618 22 0.91
and 302 306 4 1.120 30 1.52
hole ended in mineralization
MTR-394 142 150 8 1.368 66 2.25
and 154 184 30 0.449 50 1.12
incl 166 174 8 0.809 42 1.36
hole ended in mineralization
MTR-395 200 230 30 0.155 51 0.83
and 236 246 10 0.203 39 0.72
and 250 262 12 1.457 49 2.11
hole ended in mineralization
MTR-396 Several short intervals
MTR-397 274 282 8 1.448 24 1.76
hole ended in mineralization
MTR-398 180 188 8 0.131 51 0.80
and 200 218 18 0.758 50 1.43
MTR-399 156 166 10 1.928 46 2.54
and 204 212 8 0.903 60 1.70
MTR-400 100 106 6 0.476 161 2.62
MTR-401 20 28 8 0.111 83 1.22
and 166 174 8 0.450 60 1.25
MTR-402 184 196 12 0.262 64 1.12
and 210 216 6 1.996 120 3.59
and 250 256 6 1.148 29 1.54
MTR-404 24 42 18 0.238 64 1.10
and 118 126 8 1.168 74 2.16
(x) Gold equivalent grade assumes equivalence of 75 grams of silver to
one gram of gold.
True widths are expected to range between 65% and 85% of the intervals
reported on the table above. All samples are prepared and analysed by ALS
Chemex.
About Kimber
Kimber Resources Inc., which holds a 100% interest in the Monterde
property in the Sierra Madre of northern Mexico, is advancing the Carmen
gold-silver deposit towards production. The Carmen deposit, an underground
mine in the 1930's, is a typical low sulphidation epithermal system, oxidized,
and believed to be suitable for open pit mining. Two adjacent epithermal
systems first identified in 2005, the Carotare deposit and El Orito Norte
exploration target appear to be similar to the Carmen. The goal of the company
is to demonstrate at least three million resource ounces from the two deposits
and exploration target identified. For further information on the company
visit SEDAR or the company website at www.kimberresources.com.
Mr. Fernando Oviedo, B.Sc., managed this program of drilling on the
Monterde project. Mr. J.B. Richards, P.Eng., Vice President Engineering, and
designated Qualified Person (Q.P.) for the project is responsible for quality
control and has verified the data disclosed. He has determined that the
laboratory reports matched the drill sample logs and that the quality control
assays fall within reasonable limits. QA./QC procedures incorporate blanks and
duplicates inserted at the drill site and standards inserted after sample
preparation. Drilling is by reverse circulation. A one eighth split of each
two-metre section of the drill hole, weighing approximately 6 kg is processed
by ALS Chemex at its preparation laboratory in Chihuahua, Mexico. Pulps are
analysed by ALS Chemex at its laboratory in North Vancouver, British Columbia,
using 50 gram subsamples, fire assay with an AA finish for gold and four-acid
digestion and ICP finish for silver from a 0.4 gram subsample. Highgrade gold
or silver intervals are re-assayed by fire assay with gravimetric finish.
Cautionary Statement
Statements in this release may be viewed as forward-looking statements.
Such statements involve risks and uncertainties that could cause actual
results to differ materially from those projected. There are no assurances the
Company can fulfill such forward-looking statements and the Company undertakes
no obligation to update such statements. Such forward-looking statements are
only predictions; actual events or results may differ materially as a result
of risks facing the Company, some of which are beyond the Company's control.
>>