Greenland Mines Ltd NASDAQ:GRML
Greenland Mines Concludes Three-Day Technical Workshop to Define and Advance Next Phase of Skaergaard Gold and Critical Metals Project Development
Source: Yahoo Finance
CHARLOTTE, N.C., June 25, 2026 /PRNewswire/ -- Greenland Mines Ltd ("Greenland Mines" or the "Company") (Nasdaq: GRML) is pleased to announce that it has successfully concluded a three-day, multi‑disciplinary planning and development workshop for the Skaergaard Precious and Critical Metals Project in southeast Greenland. The workshop brought together more than 15 international experts from GTK Mintec, Geological Survey of Finland (Finland), SLR Consulting (Canada, UK and Ireland), WSP (Denmark) and several other topic specialist consultants and scientists, alongside the full Greenland Mines team, to design the next phase of technical work, field activities, and development pathways for Skaergaard.
Over June 22–24, the workshop focused on three main themes: advancing the understanding of Skaergaard's orebody and processing pathways; building the technical foundation through next-coming technical fieldwork, drilling, sampling and environmental programs; and defining a structured roadmap to an Initial Assessment ("IA") or Preliminary Economic Assessment ("PEA") and beyond.
Sessions covered Skaergaard's geological framework and learnings from decades of layered intrusion research, processing-relevant mineralogy and metallurgical test work, the 2026 drilling, sampling and geophysical programs, environmental baseline studies and tailings/process water management, mine engineering and potential mining scenarios, logistics concepts and the pathway toward a future exploitation license and next stage development studies.
The workshop program included in‑depth metallurgical and processing discussions led by GTK Mintec, resource modeling and mine engineering sessions led by technical advisers from SLR and independent international consultants, and environmental baseline and permitting‑relevant workstreams with WSP Denmark, integrated with presentations and moderated discussions by Greenland Mines on overall development plans, the 2026 field season, and the long‑term roadmap for Skaergaard. This structure allowed specialists in geology, layered intrusions, mineral resources, processing, mine engineering, infrastructure and environmental assessment to work together in a coordinated format and to test different strategic options for the project.
The Company believes the workshop was highly successful in aligning all key technical and advisory teams on priorities for the upcoming field season and on the critical work packages required to support a robust IA/PEA and subsequent study phases. Outcomes include an updated integrated plan for the 2026 drilling and sampling campaign, a refined strategy for metallurgical test work and flowsheet development, a framework for how geotechnical and environmental data will feed into mine design and permitting, and an agreed roadmap that extends beyond the IA/PEA toward potential exploitation licence application and long‑term development options at Skaergaard and its potential North Atlantic Critical Metals Corridor.