DENVER, March 15 /CNW/ - Golden Star Resources Ltd. (TSX:GSC) (AMEX:GSS) today announced an update on the exploration results for the Prestea Underground on our Bogoso/Prestea property in Ghana.

PRESTEA UNDERGROUND

Golden Star acquired access to the Prestea Underground in 2002, an area that has been historically mined for more than 100 years by a number of mining companies. Past production totals in excess of 9 million ounces of gold from an area that extends over a strike length of about seven kilometers on the Ashanti Trend and was mined down to about a maximum depth of about 1,400 meters over a portion of that strike length. Since acquiring this property, Golden Star has carried out the first comprehensive compilation of past activities at Prestea and is doing the first ever coordinated modern exploration program on this section of the Ashanti Trend.

As disclosed in our press release of February 14, 2007 the total Prestea Underground Mineral Resource now stands at 1.1 million tonnes of Indicated Mineral Resource grading 16.30 grams per tonne (g/t) gold and 5.0 million tonnes of Inferred Mineral Resource grading 8.68 g/t gold. The following update provides greater detail on some of the Mineral Resources contained within this estimate.

WEST REEF

The West Reef is a steeply dipping laminated quartz vein within a graphitic shear zone running sub-parallel to and in the hangingwall of the Prestea Main Reef.

As at December 31, 2006, we upgraded a portion of the West Reef Mineral Resource to an Indicated Mineral Resource of 0.86 million tonnes grading 18.3 g/t gold for 507,000 contained ounces of gold. In addition, we have an Inferred Mineral Resource of 0.51 million tonnes grading 11.6 g/t gold. The updated Mineral Resource estimates for the West Reef were based on results from nine additional drill holes, additional QA/QC and improved geostatistical grade interpolation parameters.

This additional work increased our confidence in the West Reef estimates and enabled Golden Star's consultants to upgrade the classification of a portion of the Mineral Resource as stated in our August 16, 2006 press release to an Indicated Mineral Resource. A review of the screen fire assay QA/QC on duplicate samples of the original 50 gram charge fire assay results has determined that the original fire assay results are valid and may, in fact, be slightly conservative, hence giving more confidence in the original drill hole results used in the August 2006 mineral resource estimate. Increases in the grade estimates of the West Reef are mostly attributable to the better orientation of the grade interpolation search ellipse as defined by the improved geostatistical modeling. This change in the direction of the ellipse has meant the higher grade drill hole intercepts have been used for grade estimation along the defined northerly plunging high grade pay shoot.

Several additional drill holes were also used for the West Reef Mineral Resource update and significant results from these holes are tabulated below. These holes drilled from the 24 Level targeted the down plunge extension of the West Reef shoot and have confirmed the zone still plunges north and is open at depth below the 24 Level.

     Significant drill Intersections West Reef - 24 Level update

Hole ID North East  Elev  Azm  Dip  From  To (m) Interval approx Grade
                                      (m)           (m)    True   g/t
                                                           Width   Au
                                                            (m)
----------------------------------------------------------------------
UC24-
 274S10 8306 11964  4165  270  -26  326.0 329.0      3.0    1.9   5.0
UC24-
 274S10 8306 11964  4165  270  -26  321.0 323.2      2.2    1.4   7.0
----------------------------------------------------------------------
UC24-
 274S12 8306 11964  4168  286   30  140.6 141.2      0.6    0.6  74.2
----------------------------------------------------------------------
UC24-
 274S13 8306 11963  4165  276   -1  177.7 178.4      0.7    0.6   7.1
----------------------------------------------------------------------
UC24-
 274S14 8306 11964  4165  252  -15  253.8 255.1      1.3    0.9   4.4
----------------------------------------------------------------------
UC24-
 274S15 8305 11964  4167  243   24  162.0 163.5      1.5    1.3   4.5
----------------------------------------------------------------------
UC24-
 274S16 8306 11963  4165  279  -33  368.0 372.0      4.0    2.1   8.4
----------------------------------------------------------------------
UC24-
 274S17 8306 11963  4165  251  -32  353.0 356.0      3.0    1.4   4.2
----------------------------------------------------------------------
UC24-
 274S18 8306 11963  4165  313   -6  258.7 260.9      2.3    1.5   3.8
----------------------------------------------------------------------
UC24-
 274S19 8306 11963  4165  242    8  180.0 181.9      1.9    1.5  19.4
----------------------------------------------------------------------
UC24-
 274S20 8306 11963  4165  272  -19  224.4 226.7      2.3    1.6  12.6
----------------------------------------------------------------------
UC24-
 274S21 8306 11963  4165  271    6  156.0 157.2      1.2    1.1  39.9
----------------------------------------------------------------------
UC24-
 274S23 8306 11963  4165  295    4  178.1 178.7      0.6    0.5  25.8
----------------------------------------------------------------------
UC24-
 274S24 8306 11963  4165  295   18  154.4 157.0      2.6    2.5   8.7
----------------------------------------------------------------------
UC24-
 274S25 8306 11989  4165  258   32  143.0 143.8      0.8    0.8  16.7
----------------------------------------------------------------------
UC24-
 284S2  8069 11989  4166  276   -6  226.0 227.0      1.0    0.9  18.6
----------------------------------------------------------------------
UC24-
 284S3  8069 11989  4166  262  -12   72.0  73.0      1.0    0.8  43.6
----------------------------------------------------------------------
UC24-
 284S4  8069 11989  4166  287   20  177.7 180.6      2.9    2.9  12.5
----------------------------------------------------------------------
UC24-
 284S5  8069 11989  4166  298    6  206.0 207.5      1.5    1.3   9.9
----------------------------------------------------------------------
UC24-
 284S6  8069 11989  4166  269    4  197.6 198.5      0.9    0.8  18.6
----------------------------------------------------------------------

PRESTEA MAIN REEF DRILLING

In 2006, we commenced a drilling program to test the extensions of the main reef, below the lowest workings in the Prestea Underground. This drilling was done from a drill station on the 30 Level (approximately 1,150 meters depth). In total, nine holes were completed and all holes intersected quartz reefs but we are yet to determine which of the several structures intersected represents the Main Reef. Drill intersections range from 2.5 g/t to 20.8 g/t gold and are summarized in the table below.

For now we have discontinued drilling in this area as a result of the shortage of power in Ghana and the need to refurbish the steel work in the Central shaft, which we use to access the Prestea Underground. This steelwork is old and without refurbishment represents a potential safety risk to our employees. Drilling at the 30 Level will recommence once this safety work is completed and the power sector in Ghana returns to normal.

Significant Drill Intersections Main Reef Drilling - 30 Level Prestea
                              Underground

 Hole ID  North East Elev  Azm  Dip From  To (m) Interval approx Grade
                                      (m)           (m)    True   g/t
                                                           Width   Au
                                                            (m)
----------------------------------------------------------------------
UC30-
 270S101  8421 11819 3890  110  -25  76.0  79.0      3.0    2.9   5.4
UC30-
 270S101  8421 11819 3890  110  -25  89.0  91.0      2.0    1.9   3.6
----------------------------------------------------------------------
UC30-
 270S102  8421 11819 3890  112  -54  87.3  96.8      9.5    7.6   7.5
----------------------------------------------------------------------
UC30-
 270S103  8421 11819 3890   65  -40  70.0  72.9      2.8    2.5  18.7
UC30-
 270S103  8421 11819 3890   65  -40  90.0  92.5      2.5    2.1   7.5
UC30-
 270S103  8421 11819 3890   66  -39 106.0 109.0      3.0    2.6   3.1
----------------------------------------------------------------------
UC30-
 270S104  8421 11819 3890   55  -62 114.0 118.0      4.0    2.6   5.2
UC30-
 270S104  8421 11819 3890   55  -62 122.4 125.0      2.6    1.7   4.9
----------------------------------------------------------------------
UC30-
 270S105  8421 11819 3890   41  -12 112.0 115.0      3.0    1.9   2.5
UC30-
 270S105  8421 11819 3890   42  -10 141.0 144.0      3.0    1.9   7.9
UC30-
 270S105  8421 11819 3890   42  -10 153.0 155.0      2.0    1.3   7.0
----------------------------------------------------------------------
UC30-
 270S106a 8421 11819 3890   30  -34 116.9 121.0      4.1    2.2   4.9
----------------------------------------------------------------------
UC30-
 270S107  8421 11819 3890  146  -29 108.0 110.0      2.0    1.4   4.1
----------------------------------------------------------------------
UC30-
 270S108  8421 11819 3890   87  -25  75.0  79.0      4.0    4.0   8.4
UC30-
 270S108  8421 11819 3890   87  -25  93.0  96.0      3.0    3.0  20.8
----------------------------------------------------------------------
UC30-
 270S109  8421 11819 3890   88  -45  85.0  90.0      5.0    4.5   7.5
UC30-
 270S109  8421 11819 3890   88  -45 110.0 112.0      2.0    1.8   4.1
UC30-
 270S109  8421 11819 3890   90  -42 136.0 138.0      2.0    1.8   5.8
----------------------------------------------------------------------

PLANT-NORTH MAIN REEF FOOTWALL ZONE

In addition to the underground drilling programs, we have been testing a near surface decline accessible target below the Plant-North open pit. Previous drilling below the pit had identified an apparently unexploited quartz vein in the footwall of the mined-out Main Reef zone. We initiated drill testing of this "Footwall" vein late in 2006 and are continuing to test this zone further. Ten holes have been completed with results tabulated below. The footwall quartz vein has been intersected in all holes thus far. We are still determining the degree of historical mining on this target but it appears that much of the reef remains in place with the historical mining concentrated on the Main Reef structure. Upon completion of this drilling program the Mineral Resource estimate for this target will be updated and we will commence a feasibility study on the exploitation of this resource via a decline from the existing Plant-North Pit.

  Plant North Main Reef Footwall Underground Target Drilling results

 Hole ID  North  East Elev Azm  Dip  From  To (m) Intervalapprox Grade
                                       (m)           (m)   True   g/t
                                                           Width   Au
                                                            (m)
----------------------------------------------------------------------
PNUGDD035 10700 12401 5043  91  -40  248.3 250.8      2.5   2.5  30.4
----------------------------------------------------------------------
PNUGDD036 10725 12433 5042  92  -44  211.0 214.0      3.0   3.0   4.3
----------------------------------------------------------------------
PNUGDD037 10725 12434 5042  94  -60  240.9 242.2      1.4   1.2   8.7
----------------------------------------------------------------------
PNUGDD038 10750 12411 5041  94  -56  257.0 260.0      3.0   2.8   3.6
----------------------------------------------------------------------
PNUGDD034 10774 12439 5042  94  -53  215.1 217.3      2.2   2.1  12.4
----------------------------------------------------------------------
PNUGDD033 10775 12440 5042  94  -45  208.2 210.2      2.0   2.0  14.1
----------------------------------------------------------------------
PNUGDD039 10800 12433 5042 104  -65  250.0 252.6      2.6   2.3  36.4
----------------------------------------------------------------------
PNUGDD040 10825 12461 5041 102  -48  193.6 195.5      1.9   1.9  24.6
----------------------------------------------------------------------
PNUGDD041 10825 12460 5041  98  -60  213.1 217.0      3.9   3.5   9.9
----------------------------------------------------------------------
PNUGDD042 10850 12464 5040 101  -43  194.3 195.6      1.3   1.3  61.8
----------------------------------------------------------------------

PRESTEA UNDERGROUND BACKGROUND

Prestea Underground has produced approximately nine million ounces of gold during the last 120 years, the second highest production of any mine in Ghana. Records from a portion of this history indicate that production between 1912 and 1991 totaled 19.6 million tonnes and yielded seven million ounces. This indicates an average fully recovered grade of 11.2 g/t, after both mining and metallurgical losses. Historical production from the Main Reef encompassed 7,000 meters in strike length and 1,400 meters down dip.

Previous underground operations ceased in early 2002, following an extended period of low gold prices. In March 2002, we entered into a joint-venture agreement with the former owner to explore and evaluate the remaining potential of the underground operations. Subsequently we acquired the previous owner's interest. Our 90% owned subsidiary has a 90% interest in the Prestea Underground, giving Golden Star an 81% beneficial interest.

Standards of Disclosure:

This news release has been prepared in accordance with Canada's National Instrument 43-101, Standards of Disclosure for Mineral Projects. Drilling, sampling and laboratory quality assurance and control have been overseen and reviewed by Mr. S. Mitchel Wasel, our Exploration Manager, West Africa. Mr. Wasel is a qualified geologist with 18 years of experience in gold and base metal exploration and is a Member of the Australasian Institute of Mining and Metallurgy.

The Mineral Resources were estimated using a cut-off grade of 3.4 grams of gold per tonne which we believe reflects the economic cut off at which we can mine this material using underground methods based on a $560 per ounce gold price.

Mineral Resources are shown on a 100% basis. Golden Star's share of the Mineral Resources is subject to the Government of Ghana's 19% minority interest in the Prestea Underground where Golden Star currently has an 81% beneficial interest.

The results quoted herein are based on the analysis of saw-split NQ diamond half core which has been sampled over nominal 1 meter intervals (adjusted where necessary for mineralized structures). Sample preparation and analyses have been carried out at Transworld Tarkwa Laboratories using standard 50 gram lead-collection fire assays with a lower detection limit of 0.01 grams per tonne. One thousand gram charge Screen Fire Assay techniques has been implemented as a check for the original 50 gram fire assay analysis on the West Reef Samples and all the Main Reef Footwall analysis has utilized this analytical method. All analytical work is subject to a systematic and rigorous Quality Assurance-Quality Control (QA-QC). At least 5% of samples are certified standards and the accuracy of the analysis is confirmed to be acceptable from comparison of the recommended and actual 'standards' results. In-situ bulk densities were determined on drill core using the weight in water/weight in air method. The remaining half core is stored on site for future inspection and detailed logging, to provide valuable information on mineralogy, structure, alteration patterns and the controls on gold mineralization.

COMPANY PROFILE

Golden Star holds a 90% equity interest in the Bogoso/Prestea and Wassa open-pit gold mines in Ghana. In addition, the Company has an 81% interest in the currently inactive Prestea Underground mine in Ghana as well as gold exploration interests elsewhere in Ghana, in other parts of West Africa and in the Guiana Shield of South America.

Note regarding Canada's National Instrument 43-101: The stated Minerals Resources have been prepared in accordance with NI 43-101, Standards of Disclosure for Mineral Projects, and are equivalent to Mineralized Material as defined by the United States Securities and Exchange Commission. The qualified person responsible for the preparation of the statement of Mineral Resources is S. Mitchel Wasel, Golden Star's Exploration Manager for Ghana.

Cautionary Note to US Investors concerning estimates of Inferred Mineral Resources: US investors are advised that while the term "inferred mineral resources" is recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize it. "Inferred mineral resources" have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules estimates of inferred mineral resources could not form the basis of feasibility or other economic studies. US investors are cautioned not to assume that part or all of the inferred mineral resource exists, or is economically or legally mineable.

Statements Regarding Forward-Looking Information: Some statements contained in this news release are forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Investors are cautioned that forward-looking statements are inherently uncertain and involve risks and uncertainties that could cause actual results to differ materially. Such statements include comments regarding anticipated increases in production and planned exploration activities. Factors that could cause actual results to differ materially include timing of and unexpected events during exploration, construction and start-up; variations in ore grade; variations in relative amounts of refractory, non-refractory and transition ores; delay or failure to receive board or government approvals; timing and availability of external financing on acceptable terms; technical or permitting issues, and fluctuations in gold price and costs. There can be no assurance that future developments affecting the Company will be those anticipated by management. Please refer to the discussion of these and other factors in our Form 10-K for 2005. The Form 10-K for 2006 is expected to be filed later in March.