Geikie uranium project expansion
Filed with ASX · · 4 pages · English
Summary by 6ix AI
Basin Energy Limited has announced an expansion of the Geikie Uranium Project by adding two new claims through staking, increasing the project area significantly. The new claims are adjacent to the current exploration drilling program and are expected to enhance the existing drilling targets. Drilling is currently underway at Geikie, with plans for an initial drilling program covering a substantial distance. Geotech has been contracted to expand the electromagnetic data coverage to include the new claim area, which will aid in exploration efforts.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Earlier from Basin Energy
- Mobilises for Maiden Drilling at Geikie Uranium Project
- Basin prepares for maiden drill program at Geikie
- Airborne Electromagnetic Survey Completed At Geikie
- Geophysical targets identified at Geikie
- Airborne EM Survey Commences At Geikie
Later from Basin Energy
- Elevated radioactivity and hydrothermal alteration at Geikie
- Airborne gravity survey commences at Geikie project
- Basin reaches 60% ownership milestone in Geikie Project
- Unconformity Uranium Targets Identified At North Millennium
- Intersects Uranium Mineralisation up to 0.27% at Geikie
Follow Basin Energy into a list and get an email when it puts out news.
Follow Basin Energy