Further Positive Drill Results from Barlee Gold Project
Filed with ASX · · 18 pages · English
Arrow Minerals Limited (formerly Segue Resources Limited) (Arrow or the Company) is pleased to provide results from the drilling programme completed in late 2017 at the T6, T2 and T1 prospects at its 100% owned Barlee Gold Project, 100km west of Menzies in Western Australia (Figure 1). A maiden drill programme was completed at the T6 prospect, including 29 aircore holes (1,401m) and six reverse ci
Story so far
Earlier from Arrow Minerals
- Exploration Update - Plumridge Nickel Project
- Greenfields Gold Discovery at Barlee Gold Project
- Drilling Completed at Barlee Gold Project
- Gold Nuggets Discovered at Pilbara Gold Project (updated)
- Gold Nuggets Discovered at Pilbara Gold Project
Later from Arrow Minerals
- JV & Investment by IGO and Placement Raises $5.2M
- Major Drill Programme to Commence at Barlee Gold
- Strickland Gold & Malinda Lithium Projects Update
- Pilbara Gold Joint Venture with TSXV-Listed Pacton Gold
- $2.4M Received from IGO and Tranche 2 Equity Raising
Follow Arrow Minerals into a list and get an email when it puts out news.
Follow Arrow Minerals