ASX ANNOUNCEMENT AMENDED ANNOUNCEMENT - BONDOUKOU RC DRILLING MOVES TO TWO-SHIFT OPERATIONS AS FIRST SAMPLES ARE DISPATCHED Dalaroo Metals Limited (ASX: DAL) (“Dalaroo” or “the Company”) refers to its announcement released to the ASX on 22 September 2026 titled “Drilling Progresses at...
Drilling Progresses at Bondoukou Gold Ridge Project Amended
Filed with ASX · · 17 pages · English
Summary by 6ix AI
Dalaroo Metals Ltd. has issued an amended announcement regarding its drilling operations at the Bondoukou Gold Ridge Project, indicating a shift to two-shift operations as the first samples are dispatched for analysis. The first batch of samples has been sent to the laboratory, with results expected in the near future.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
Release
Story so far
Earlier from Dalaroo Metals
- Drilling progresses at Bondoukou Gold Ridge Project
- Greenland Mapping Defines Structural Controls on REE
- Watheroo IP Survey Further Defines Cu-Ni-PGE Drill Targets
- Maiden Drilling commences at Bondoukou Gold Ridge Project
- Africa Down Under Presentation September 2026
Later from Dalaroo Metals
- Results of Meeting
- Annual Report to shareholders
- Corporate Governance Statement and Appendix 4G
- Trading Halt
- MAIDEN DRILLING STRIKES 18m @ 7.31g/t HIGH-GRADE GOLD
Follow Dalaroo Metals into a list and get an email when it puts out news.
Follow Dalaroo Metals