CZR set for key Reserve update
Filed with ASX · · 15 pages · English
The updated Reserve estimate will help underpin the Definitive Feasibility Study (DFS), which will examine the potential to increase the project’s forecast production rate to 3Mtpa compared with the 2Mtpa modelled in the Pre-feasibility Study (PFS) (see ASX release dated December 10, 2021). The infill drilling has reduced the drill spacing to approximately 50m x 50m, which will increase the availa
Earlier from CZR Resources
- CZR appoints Managing Director
- Robe Mesa Drilling Starts
- CZR Resources appoints two experienced resources executives as Directors
- CZR Board Changes
- Quarterly Appendix 5B Cash Flow Report
Later from CZR Resources
- Assay Results Confirm Growth Potential for Robe Mesa
- Robe Mesa Final Assay Results
- Response to ASX Price and Volume Query
- Proposed Issue of Incentive Securities to Non Exec Directors
- Significant Growth in Robe Mesa JORC Resource
Follow CZR Resources into a list and get an email when it puts out news.
Follow CZR Resources