Commencement of Phase Two Metallurgical Testwork at Rogozna
Filed with ASX · · 23 pages · English
Summary by 6ix AI
Strickland Metals Ltd has announced the commencement of Phase Two metallurgical testwork at the Rogozna Gold and Base Metals Project in Serbia, focusing on bulk samples from the Shanac Deposit to enhance previous positive processing results. The testwork aims to optimize metal recoveries and confirm the proposed processing flowsheet, building on a successful program conducted in the past that achieved high recoveries for gold and copper. Additionally, drilling continues at Rogozna, with assays expected from multiple holes, including initial results from the Kotlovi Prospect, which has shown promising high-grade intercepts.
Written by 6ix AI from the company’s filing. How 6ix writes summaries
In the deck
Story so far
Earlier from Strickland Metals
- Outstanding Thick 43.4m @ 4.6g/t AuEq Intercept at Medenovac
- Further High Grade Results Confirm Potential of Horsewell GC
- Exciting New Growth Targets Emerging at the Rogozna Project
- STK Hits 545.7m @ 1.1g/t AuEq as Rogozna Continues to Grow
- Growth Drilling Commences at High Priority Gradina Prospect
Later from Strickland Metals
- Strickland Makes Major New Gold Discovery at Rogozna
- 40.9m @ 4.0g/t Au extends high-grade gold zone at Shanac
- 25.5m @ 5.2g/t Au Extends Gradina Closer to Surface
- Shanac Deposit Continues to Expand with Impressive Intercept
- High-Grade Gold Intercepts Further Expand Gradina System
Follow Strickland Metals into a list and get an email when it puts out news.
Follow Strickland Metals