Calvalley Petroleum IncTSX: CVI.A

Calvalley Petroleum Announces another Successful Appraisal Well at Hiswah-7

· Issued by Calvalley Petroleum Inc via CNW
CALGARY, Nov. 18 /CNW Telbec/ - Calvalley Petroleum Inc. (TSX: CVI.A) -
Calvalley Petroleum Inc., Operator of Block 9 in the Republic of Yemen is
pleased to announce the completion of the Hiswah-7 horizontal development
well.
Hiswah-7 was drilled horizontally into the oil-bearing Saar-Naifa
formation and is the fifth successful horizontal well drilled into the Hiswah
oil field. The well is located approximately 250 metres west of the Hiswah-6
horizontal well which tested at rates of up to 3,700 bbls per day. The well
was drilled parallel to Hiswah-6 in order to intersect the same prolific zone
discovered at Hiswah-6. Hiswah-7 was successfully drilled to 1,900 metres with
the last 615.5 metres in the pay zone. With a horizontal section of 576 metres
it is the longest horizontal well drilled by Calvalley in Yemen and as a
result, is important from a technical standpoint, particularly in light of the
fact that the well was completed in only 17 days. Hiswah-7 intersected the top
of the Saar-Naifa reservoir higher than prognosis at a depth of 1,106 metres.
The well penetrated oil-saturated, porous, high-energy carbonate grainstones
over most of its length and based on log data the company is optimistic that
Hiswah-7 will be another excellent producer.
Hiswah-7, together with the other four Hiswah horizontal wells, will be
produced after production facilities are in place. Within the next few days,
the drilling rig will move to another Hiswah location to begin the next
horizontal development well.

THE TORONTO STOCK EXCHANGE HAS NOT REVIEWED AND DOES NOT ACCEPT
RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

This press release may contain forward-looking statements, including
expectations of future production, cash flow and earnings. These statements
are based on current expectations that involve a number of risks and
uncertainties, which could cause actual results to differ materially from
those anticipated or implied in the forward-looking statements. These risks
include but are not limited to: the risks associated with the oil and gas
industry (e.g. operational risks in development, exploration and production;
delays or changes in plans with respect to exploration or development projects
or capital expenditures; the uncertainties of reserve estimates; the
uncertainty of estimates and projections related to production, costs and
expenses, and health, safety and environmental risks), commodity price, price
and exchange rates fluctuations and uncertainties resulting from potential
delays or changes in plans with respect to exploration or development projects
or capital expenditures. Additional information on these and other factors
that could affect Calvalley's operations or financial results are included in
Calvalley's reports on file with Canadian securities regulatory authorities.
%SEDAR: 00001745E

Calvalley Petroleum Inc on 6ix

Earlier from Calvalley Petroleum

Later from Calvalley Petroleum

All Calvalley Petroleum news releases