Critical Metals PLCLSE: CRTM

Critical Metals: Block Modelling Confirms Mineralisation at Molulu

· Issued by Critical Metals PLC via RNS

Summary by 6ix AI

Critical Metals plc, a mining company, said on November 5, 2026 that it has completed exploration target 3D block modelling (a three-dimensional computer model of where minerals may lie in an area being explored) and says it confirmed copper oxide mineralisation at its Molulu Copper/Cobalt Project in the Democratic Republic of Congo.

Key details

  • The model is based on available drilling data, soil sampling and trench data, along with the current quality assurance and quality control program. The company says it will inform the next phase of exploration, and that the results help to plan the next phase of drilling.
  • Critical Metals is working with a potential offtake partner (a possible buyer of the output) to test a total of about 300 kilograms of ore from existing stockpiles.
  • The tests will check how much acid-soluble copper can be recovered from samples in three total copper grade ranges: 1%-1.5%, 1.5%-2% and more than 2%.
  • Planned next steps include interpreting the modelling results, preparing an extraction schedule for the exploration target, an independent third-party review, identifying further priority targets, follow-up drilling and updating the block model.

What’s still pending

  • Talks with the potential offtake partner are at an initial stage, and the bulk sample test results are still pending.
  • The independent third-party review and follow-up drilling are planned but not yet done.

6ix AI wrote this summary from the release below and checked it against the release.

Critical Metals PLC
05 November 2026


REGULATORY NEWS ANNOUNCEMENT

Critical Metals plc | LSE: CRTM | Main Market | LEI: 213800MU3B7CS88PY290

Exploration Target 3D Block Modelling Results Confirm Mineralisation at Molulu Copper Project Potential Offtake Partner to Assess Copper Oxide Bulk Sample

LONDON, 5 November 2026 – Critical Metals plc (LSE: CRTM), a mining company established to acquire mining opportunities in the critical and strategic metals sector, is pleased to announce the completion of 3D block modelling and confirmation of copper oxide mineralisation at the Molulu Copper/Cobalt Project (“Molulu”) in the Democratic Republic of Congo. The modelling represents a further step in advancing the Company’s understanding of the project and will inform the next phase of exploration.

Furthermore, the Company announces that it is collaborating with a potential offtake partner to test a total of Circa. 300 kilograms (kg) of ore from existing stockpiles and evaluate sample recovery within the following Total Copper (TCu) ranges: 1%-1.5%, 1.5%-2%, and >2%.

The efficient solubility and recovery of copper oxides in acidic environments are essential for sustainable mining operations. Our ongoing research and optimisation of leaching and extraction techniques aim to improve recovery rates while optimising production, minimising environmental impact, and responding to market demands, making this a key focus within the mining and metallurgy sectors.

HIGHLIGHTS

— Exploration Target 3D Block modelling completed based on available drilling data, soil sampling & trench data along with current quality assurance and quality control (QA/QC) program

— Results from 3D Block Modelling increase understanding of the mineralised areas and help to plan the next phase of drilling

— Initial discussions with a new potential offtake partner

— Testing 300 kg of bulk sample to determine potential recovery grades of acid-soluble copper.

NEXT STEPS

  • Interpret the modelling results to increase understanding of geometry, distribution and continuity of mineralisation
  • Prepare an extraction schedule for the exploration target
  • Independent third-party review
  • Identify further Priority targets
  • Undertake follow-up drilling to understand the mineralisation extension
  • Update block modelling

MANAGEMENT COMMENT

Danilo Lange, Chief Executive Officer of Critical Metals, said:

“The completion of Exploration Target 3D Block Modelling represents an important step in increasing our understanding of the mineralisation across the project, which is essential in determining and guiding our next phase of exploration.

Alongside the work on the ground, we were delighted to start initial conversations with a potential offtake partner, with material being tested to assess its copper recovery potential. This could provide an opportunity to release value from material already on site, while we continue to advance our understanding and potential of the wider project.”

**ENDS**

For further information on the Company, please visit www.criticalmetals.co.uk or contact:

Critical Metals plc

Danilo Lange, CEO

critical@stbridespartners.co.uk

St Brides Partners Ltd

Financial PR

Ana Ribeiro/Charlotte Page

critical@stbridespartners.co.uk

Notes to Editors

Critical Metals plc is a mining company focused on acquiring and developing brownfield opportunities in the critical and strategic metals sector. The Company operates the Molulu copper/cobalt project, an ex-producing mine located in the Katanga Copperbelt, Democratic Republic of Congo. It holds a 70% interest in the Molulu Project, with DRC-based partners holding the remaining 30%.

The Company is majority owned by NIU Invest SE, a Europe and US-based investment company headed by Austrian investor Cevdet Caner, which holds a 52.07% stake in Critical Metals. NIU is focused on becoming a fully integrated mining investor and operator with assets across North America, Latin America, Africa, and Europe.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.

END

Critical Metals PLC on 6ix

Story so far

Earlier from Critical Metals

All Critical Metals news releases