1. Home
  2. News
  3. Aya Gold & Silver Inc.
  4. Aya Gold & Silver Reports High-Grade Silver Exploration Results Near Pit and at Depth at Zgounder
Aya Gold & Silver Inc. news

Investor announcements, newest first.

Close
Company news
Aya Gold & Silver Inc.
Sep 16, 2026 at 11:00 AM UTC
Original
ELI5

Aya Gold & Silver Reports High-Grade Silver Exploration Results Near Pit and at Depth at Zgounder

MONTREAL, Sept. 16, 2026 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) ("Aya" or the "Company") is pleased to announce high-grade silver drill results from its at-depth drill exploration program at the Zgounder Silver Mine ("Zgounder") in the Kingdom of Morocco.

Highlights (all intersections are in core lengths)

  • Intersections in the Open-Pit Area:

    • Hole ZG-RC-24-155 intercepted 783 grams per tonne ("g/t") silver ("Ag") over 13.0 metres ("m")

    • Hole ZG-RC-24-354 intercepted 501 g/t Ag over 11.0m, including 4,000 g/t over 1.0m

    • Hole ZG-SF-25-702 intercepted 1,553 g/t Ag over 1.4m

  • Intersections in the Central Area:

    • Hole DZG-SF-26-945 intercepted 3,501 g/t Ag over 3.5m, including 7,717 g/t Ag over 1.5m

    • Hole T28-26-1334 intercepted 4,770 g/t Ag over 2.4m

    • Hole T28-26-1333 intercepted 1,362 g/t Ag over 8.4m, including 2,873 g/t Ag over 3.6m

    • Hole T28-26-1404 intercepted 762 g/t Ag over 12.0m

  • 16,217m or 54.1% of the 2026 exploration program has been drilled year to date.

"Today's high-grade results, highlighted by DZG-SF-26-945, continue to reinforce the strength and continuity of silver mineralization both around the open pit and across the central zone," said Benoit La Salle, President & CEO. "At the same time, development of the exploration drift at the 1,825-metre level is progressing well, setting the stage for drilling west of the fault to begin in Q4 and providing an important new opportunity to expand the mineralized footprint."

This release contains results from 97 holes, which include one surface diamond drill holes ("DDH"), 31 underground DDH, seven reverse circulation drill hole ("RC"), 45 T28 and 13 YAK holes (T28 and YAK: percussion drilling using an air-compressed hammer). For a full summary of today's results, refer to Appendix 1 and 2.

Table 1 – Best Intercepts at Zgounder (core lengths)

Hole ID

From

To

Ag

Length*

Ag x width

(g/t)

(m)

Underground DDH

DZG-SF-25-702

58.3

59.7

1,553

1.4

2,174

DZG-SF-25-789

18.5

21.0

760

2.5

1,901

DZG-SF-26-885

124.0

125.0

1,503

1.0

1,503

DZG-SF-26-898

109.5

111.0

1,208

1.5

1,812

DZG-SF-26-943

34.5

36.0

874

1.5

1,311

DZG-SF-26-945

16.0

19.5

3,501

3.5

12,254

Including

16.5

18.0

7,717

1.5

11,575

Surface RC

ZG-RC-24-155

0.0

13.0

783

13.0

10,180

ZG-RC-24-354

2.0

13.0

501

11.0

5,512

Including

6.0

7.0

4,000

1.0

4,000

Underground T28

T28-26-1325

0.0

9.6

302

9.6

2,903

T28-26-1333

9.6

18.0

1,362

8.4

11,437

Including

9.6

13.2

2,873

3.6

10,344

T28-26-1334

24.0

26.4

4,770

2.4

11,448

T28-26-1335

13.2

15.6

1,603

2.4

3,846

T28-26-1358

16.8

24.0

450

7.2

3,242

T28-26-1401

7.2

15.6

258

8.4

2,164

T28-26-1404

7.2

19.2

762

12.0

9,149

T28-26-1420

3.6

26.4

297

22.8

6,775

Including

3.6

14.4

382

10.8

4,128

T28-26-1441

18.0

25.2

403

7.2

2,898

Including

21.6

25.2

695

3.6

2,501

T28-26-1443

14.4

25.2

468

10.8

5,050

Including

14.4

16.8

1,168

2.4

2,802

T28-26-1447

7.2

18.0

232

10.8

2,506

T28-26-1448

19.2

24.0

450

4.8

2,158

Underground YAK

YAK-26-554

12.0

15.6

1,670

3.6

6,012

YAK-26-571

9.6

13.2

606

3.6

2,182

YAK-26-575

33.6

36.0

1,715

2.4

4,116

Figure 1: Location of Drill Results at Zgounder

Quality Assurance

For core drilling, all individual samples represent approximately one meter in length of core, which is halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for Mining and Environment ("Afrilab") in Marrakech, Morocco or to ALS Laboratory at the Zgounder Mine site. All samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by atomic absorption spectroscopy ("AAS"). Samples grading above 200 g/t Ag are reanalyzed by fire assay.

For definition drilling using RC, all individual samples represent 1.0m in length and for T28 drilling equipment, all individual samples represent 1.2m in length. Samples are assayed at either the ALS Mine laboratory or at Afrilab. All samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading above 200 g/t Ag are reanalyzed by fire assay. Rigorous quality controls (QaQc) are applied at both locations.

Qualified Person

The scientific and technical information contained in this press release has been reviewed, verified and approved by David Lalonde, B. Sc, P. Geo, Executive Vice-President, Exploration, Qualified Person, for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full mining value chain. The Company has established an exploration track record through a systematic, technology-led, data-driven approach and is focused on expanding its resource base and land package along the Anti-Atlas fault — one of Africa's most geologically rich, underexplored and mining-friendly regions.

Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility. Aya's growth pipeline includes the Boumadine polymetallic project, where feasibility study work is underway, and which hosts a sizable mineralized footprint, and potential for further discovery.

Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is committed to delivering sustainable value for shareholders, employees and host communities.

For additional information, please visit Aya's website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

Alex Ball

President & CEO

Executive Vice-President, Capital Markets

[email protected]

[email protected]

Forward-Looking Statement

This press release contains "forward-looking statements" or "forward-looking information" within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide information about management's current expectations, estimates and projections regarding Aya's future growth and business prospects (including the timing and development of deposits and the success of exploration activities) and other opportunities as of the date of this press release.

All statements, other than statements of historical fact included in this press release, regarding the Company's strategy, future operations, technical assessments, prospects, plans and objectives of management are forward-looking statements that involve risks and uncertainties. Wherever possible, words such as "aim", "anticipate", "assume", "believe", "estimate", "expect", "goal", "guidance", "intend", "objective", "plan", "potential", "strategy", "target", and similar expressions or statements that certain actions, events or results "may", "could", "would", "might", "will", or are "likely" to be taken, occur or be achieved, have been used to identify such forward-looking information. Forward-looking statements in this press release include, but are not limited to, statements with respect to: the 2026 exploration program; the timing and commencement of drilling west of the fault at Zgounder; and the potential expansion of the mineralized footprint at Zgounder.

Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Company to be materially different from future results, performance or achievements expressed or implied by such information or statements. There can be no assurance that such information or statements will prove to be accurate. Key assumptions upon which the Company's forward-looking information is based include without limitation, assumptions regarding development and exploration activities; the Company's ability to execute its business plans and objectives; the ability to commence and successfully execute planned drilling and exploration activities; the accuracy of the Company's geological interpretations and the continuity of mineralization in areas targeted for exploration; the continued validity and good standing of the mining titles necessary to conduct the planned exploration activities; the timely receipt of necessary approvals or permits; the ability to obtain timely financing on reasonable terms when required; future social, economic and political conditions remaining consistent with those currently prevailing; the availability of qualified contractors, consultants, suppliers, equipment, materials and labour on commercially reasonable terms; and the cooperation of government authorities, municipalities and other stakeholders.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Forward-looking statements are also subject to risks and uncertainties facing the Company's business, any of which could have a material adverse effect on the Company's business, financial condition, results of operations and growth prospects. Some of the risks the Company faces and the uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements include, among others: Aya's ability to execute on its plans relating to the Zgounder Project, including the timing thereof; delays in the development of the exploration drift or in accessing areas targeted for drilling; delays in the commencement or completion of planned drilling and exploration activities; the risk that exploration results may not be indicative of future results; risks and hazards associated with the business of mineral exploration, development and mining, including environmental hazards, potential unintended releases of contaminants, industrial accidents, unusual or unexpected geological or structural formations, pressures, cave-ins, and flooding; risks related to Aya's operations in Morocco; the speculative nature of mineral exploration and development; inadequate or unreliable infrastructure (such as roads, bridges, power sources and water supplies); fluctuations in forward markets for silver and other commodities (such as natural gas, fuel, oil and electricity); availability of gas, fuel and oil; restrictions on mining in the jurisdictions in which Aya operates; changes in laws and regulations governing our operations, exploration, and development activities, including international laws and legal norms; the potential impact of future pandemics or epidemics on the Company's operations, and assumptions related thereto; Aya's ability to attract and retain qualified employees and contractors; Aya's ability to obtain and renew necessary permits and licences; Aya's ability to obtain and maintain insurance; occupational health and safety risks; adverse publicity risks; third-party risks; disruptions to Aya's business operations; Aya's reliance on technology and information systems; unforeseen expenses; public health crises; climate change; weather disruptions; general economic conditions; force majeure; the inherent risks involved in exploration and development of mineral properties; and other risks described in the Company's documents filed with Canadian and U.S. securities regulatory authorities.

In addition, readers are directed to carefully review the detailed risk discussion in the Company's Annual Information Form and Management's Discussion & Analysis for the year ended December 31, 2025, filed on SEDAR+ and on EDGAR, which discussions are incorporated by reference in this press release, for a fuller understanding of the risks and uncertainties that affect the Company's business and operations.

Although the Company believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. As such, these risks are not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks, uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue reliance on forward-looking statements.

Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding the Company's business plans, financial performance and condition and may not be appropriate for other purposes.

The forward-looking statements contained herein are made only as of the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law. The Company qualifies all of its forward-looking statements by these cautionary statements.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

Hole ID

From

To

Ag

Length*

Ag x width

(g/t)

(m)

Surface DDH

ZG-26-211

537.0

538.0

645

1.0

645

Underground DDH

ZG-26-211

537.0

538.0

645

1.0

645

ZG-SF-26-361

135.0

136.0

358

1.0

358

ZG-SF-26-361

155.0

157.0

147

2.0

294

ZG-SF-26-361

170.0

174.0

268

4.0

1,071

ZG-SF-TS-26-008A

31.0

31.5

220

0.5

110

ZG-SF-TS-26-008A

50.5

52.0

172

1.5

258

DZG-SF-25-702

58.3

59.7

1,553

1.4

2,174

DZG-SF-25-708

46.9

48.0

356

1.1

392

DZG-SF-25-727

0.0

1.7

108

1.7

183

DZG-SF-25-771

30.5

32.0

240

1.5

360

DZG-SF-25-773

26.0

27.5

388

1.5

582

DZG-SF-25-789

2.5

3.5

561

1.0

561

DZG-SF-25-789

18.5

21.0

760

2.5

1,901

DZG-SF-26-829

6.5

8.0

136

1.5

204

DZG-SF-26-871

72.0

73.5

288

1.5

432

DZG-SF-26-879

56.0

57.0

104

1.0

104

DZG-SF-26-884

81.0

82.1

212

1.1

233

DZG-SF-26-885

124.0

125.0

1,503

1.0

1,503

DZG-SF-26-886

45.5

46.0

364

0.5

182

DZG-SF-26-891

42.0

43.5

83

1.5

125

DZG-SF-26-895

56.5

57.5

206

1.0

206

DZG-SF-26-898

109.5

111.0

1,208

1.5

1,812

DZG-SF-26-899

31.0

32.0

384

1.0

384

DZG-SF-26-900

30.5

31.5

1,147

1.0

1,147

DZG-SF-26-904

30.0

33.0

111

3.0

333

DZG-SF-26-910

33.0

34.5

121

1.5

182

DZG-SF-26-912

95.0

96.5

291

1.5

436

DZG-SF-26-916

116.0

119.5

252

3.5

881

DZG-SF-26-916

138.0

139.0

79

1.0

79

DZG-SF-26-922

32.0

33.0

77

1.0

77

DZG-SF-26-922

37.0

42.0

229

5.0

1,144

DZG-SF-26-928

3.8

5.3

212

1.5

318

DZG-SF-26-933

75.0

76.0

759

1.0

759

DZG-SF-26-933

91.0

92.0

651

1.0

651

DZG-SF-26-943

1.0

1.8

93

0.8

74

DZG-SF-26-943

4.5

6.0

107

1.5

161

DZG-SF-26-943

7.5

9.0

106

1.5

159

DZG-SF-26-943

29.5

30.0

94

0.5

47

DZG-SF-26-943

34.5

36.0

874

1.5

1,311

DZG-SF-26-944

12.5

13.5

82

1.0

82

DZG-SF-26-944

42.3

43.5

141

1.2

169

DZG-SF-26-945

10.1

11.5

506

1.4

708

DZG-SF-26-945

16.0

19.5

3,501

3.5

12,254

Including

16.5

18.0

7,717

1.5

11,575

DZG-SF-26-945

21.0

22.5

101

1.5

152

DZG-SF-26-946

4.5

6.0

89

1.5

134

DZG-SF-26-946

81.5

83.0

290

1.5

435

DZG-SJ-CD-26-028

49.0

50.0

99

1.0

99

DZG-SJ-CD-26-028

51.0

52.0

123

1.0

123

Surface RC

ZG-RC-24-155

0.0

13.0

783

13.0

10,180

ZG-RC-24-250

72.0

73.0

680

1.0

680

ZG-RC-24-354

2.0

13.0

501

11.0

5,512

Including

6.0

7.0

4,000

1.0

4,000

ZG-RC-24-421

0.0

3.0

143

3.0

428

ZG-RC-25-412

50.0

51.0

824

1.0

824

ZG-RC-26-1046

17.0

19.0

102

2.0

203

ZG-RC-26-1054

24.0

25.0

150

1.0

150

Underground T28

T28-26-1310

14.4

16.8

682

2.4

1,636

T28-26-1311

7.2

9.6

100

2.4

239

T28-26-1312

21.6

24.0

97

2.4

233

T28-26-1324

0.0

3.6

174

3.6

628

T28-26-1325

0.0

9.6

302

9.6

2,903

T28-26-1332

10.8

13.2

537

2.4

1,289

T28-26-1332

16.8

18.0

116

1.2

139

T28-26-1333

9.6

18.0

1,362

8.4

11,437

Including

9.6

13.2

2,873

3.6

10,344

T28-26-1334

9.6

16.8

260

7.2

1,872

T28-26-1334

24.0

26.4

4,770

2.4

11,448

T28-26-1335

13.2

15.6

1,603

2.4

3,846

T28-26-1357

18.0

19.2

77

1.2

92

T28-26-1358

16.8

24.0

450

7.2

3,242

T28-26-1361

21.6

24.0

151

2.4

362

T28-26-1382

0.0

1.2

151

1.2

181

T28-26-1389

9.6

13.2

88

3.6

318

T28-26-1392

0.0

4.8

267

4.8

1,282

T28-26-1401

7.2

15.6

258

8.4

2,164

Including

7.2

10.8

483

3.6

1,739

T28-26-1402

2.4

4.8

111

2.4

265

T28-26-1403

7.2

10.8

109

3.6

391

T28-26-1404

7.2

19.2

762

12.0

9,149

T28-26-1405

19.2

21.6

87

2.4

208

T28-26-1406

10.8

13.2

193

2.4

462

T28-26-1407

9.6

12.0

193

2.4

463

T28-26-1410

4.8

6.0

80

1.2

96

T28-26-1411

7.2

9.6

252

2.4

605

T28-26-1411

10.8

12.0

90

1.2

108

T28-26-1412

3.6

9.6

168

6.0

1,008

T28-26-1413

9.6

10.8

85

1.2

102

T28-26-1414

0.0

4.8

295

4.8

1,414

T28-26-1415

0.0

3.6

133

3.6

479

T28-26-1415

9.6

10.8

116

1.2

139

T28-26-1415

14.4

16.8

314

2.4

754

T28-26-1418

18.0

19.2

155

1.2

186

T28-26-1419

4.8

6.0

77

1.2

92

T28-26-1419

8.4

9.6

117

1.2

140

T28-26-1419

13.2

14.4

132

1.2

158

T28-26-1419

15.6

20.4

159

4.8

763

T28-26-1419

25.2

26.4

216

1.2

259

T28-26-1420

3.6

26.4

297

22.8

6,775

Including

3.6

14.4

382

10.8

4,128

T28-26-1422

10.8

12.0

95

1.2

114

T28-26-1425

19.2

21.6

114

2.4

272

T28-26-1441

18.0

25.2

403

7.2

2,898

Including

21.6

25.2

695

3.6

2,501

T28-26-1442

0.0

1.2

553

1.2

664

T28-26-1442

21.6

24.0

163

2.4

390

T28-26-1443

7.2

8.4

80

1.2

96

T28-26-1443

10.8

12.0

89

1.2

107

T28-26-1443

14.4

25.2

468

10.8

5,050

Including

14.4

16.8

1,168

2.4

2,802

T28-26-1444

13.2

15.6

90

2.4

216

T28-26-1444

19.2

22.8

271

3.6

974

T28-26-1447

7.2

18.0

232

10.8

2,506

Including

14.4

18.0

444

3.6

1,598

T28-26-1448

16.8

18.0

108

1.2

130

T28-26-1448

19.2

24.0

450

4.8

2,158

T28-26-1449

19.2

20.4

87

1.2

104

T28-26-1450

7.2

8.4

79

1.2

95

T28-26-1450

16.8

19.2

134

2.4

322

T28-26-1451

19.2

20.4

195

1.2

234

T28-26-1463

9.6

15.6

130

6.0

780

T28-26-1464

9.6

14.4

154

4.8

738

T28-26-1466

13.2

15.6

283

2.4

679

Underground YAK

YAK-26-503

4.8

6.0

599

1.2

719

YAK-26-515

8.4

10.8

82

2.4

196

YAK-26-515

13.2

14.4

166

1.2

199

YAK-26-520

4.8

6.0

240

1.2

288

YAK-26-553

3.6

4.8

101

1.2

121

YAK-26-553

8.4

9.6

126

1.2

151

YAK-26-553

10.8

12.0

191

1.2

229

YAK-26-553

43.2

44.4

83

1.2

100

YAK-26-554

12.0

15.6

1,670

3.6

6,012

YAK-26-561

46.8

48.0

77

1.2

92

YAK-26-562

0.0

1.2

86

1.2

103

YAK-26-563

1.2

2.4

266

1.2

319

YAK-26-568

48.0

49.2

113

1.2

136

YAK-26-571

9.6

13.2

606

3.6

2,182

YAK-26-572

6.0

10.8

152

4.8

728

YAK-26-572

44.4

45.6

92

1.2

110

YAK-26-575

33.6

36.0

1,715

2.4

4,116

YAK-26-581

28.8

32.4

318

3.6

1,144

True widths are undetermined; all values are uncut.

Appendix 2 – Drill Hole Coordinates of Zgounder Drill Hole with Significant Results

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length (m)

Surface DDH

ZG-26-211

620442

3403648

2076

0

-75

564

Underground DDH

ZG-SF-26-361

620832

3403979

1969

180

-86

216

ZG-SF-TS-26-008A

620529

3403908

1919

170

-63

74

DZG-SF-25-702

621211

3404043

2073

65

16

80

DZG-SF-25-708

621212

3404040

2072

98

-14

65

DZG-SF-25-727

620983

3404059

1969

5

36

65

DZG-SF-25-771

620554

3404007

1909

72

-30

100

DZG-SF-25-773

620554

3404007

1909

72

0

90

DZG-SF-25-789

620549

3404009

1908

338

-30

80

DZG-SF-26-829

621127

3404082

2020

27

22

60

DZG-SF-26-871

620700

3403985

1885

56

-6

150

DZG-SF-26-879

620918

3404096

1997

267

3

60

DZG-SF-26-884

620793

3404090

1937

268

0

135

DZG-SF-26-885

620793

3404088

1937

259

0

132

DZG-SF-26-886

620918

3404098

1996

289

-11

60

DZG-SF-26-891

620429

3404008

1945

323

2

150

DZG-SF-26-895

620437

3404006

1945

80

4

60

DZG-SF-26-898

620767

3404056

1912

83

0

150

DZG-SF-26-899

620766

3404057

1912

72

-10

150

DZG-SF-26-900

620766

3404057

1912

72

0

134

DZG-SF-26-904

620761

3404058

1912

330

0

150

DZG-SF-26-910

620759

3404054

1912

278

-10

150

DZG-SF-26-912

620801

3404090

1937

60

0

150

DZG-SF-26-916

620793

3404087

1937

259

-10

150

DZG-SF-26-922

620801

3404089

1937

97

-10

150

DZG-SF-26-928

621087

3404093

1973

109

-21

75

DZG-SF-26-933

621080

3404095

1973

298

-1

95

DZG-SF-26-943

621055

3404053

1941

330

0

150

DZG-SF-26-944

621054

3404052

1941

315

0

150

DZG-SF-26-945

621052

3404051

1941

299

0

150

DZG-SF-26-946

621080

3404095

1974

299

14

95

DZG-SJ-CD-26-028

621286

3404887

2205

135

-60

59

Surface RC

ZG-RC-24-155

621245

3404121

2234

180

-72

124

ZG-RC-24-250

621158

3404095

2222

180

-70

74

ZG-RC-24-354

621033

3404068

2228

180

-70

80

ZG-RC-24-421

621033

3404093

2223

135

-70

50

ZG-RC-25-412

621052

3404094

2222

135

-70

55

ZG-RC-26-1046

621206

3404141

2201

135

-71

60

ZG-RC-26-1054

621187

3404125

2201

135

-70

50

Underground T28

T28-26-1310

621054

3404106

2027

82

10

26

T28-26-1311

621054

3404106

2027

82

25

26

T28-26-1312

621057

3404101

2027

99

13

26

T28-26-1324

620602

3403990

1909

183

12

26

T28-26-1325

620602

3403990

1909

179

21

25

T28-26-1332

620633

3403997

1909

68

9

23

T28-26-1333

620633

3403997

1910

68

21

22

T28-26-1334

620622

3404019

1910

120

8

26

T28-26-1335

620622

3404019

1910

120

20

26

T28-26-1357

620636

3404087

2000

360

14

26

T28-26-1358

620632

3404087

2001

348

19

26

T28-26-1361

620651

3404077

1998

219

5

26

T28-26-1382

620768

3404040

2023

358

15

25

T28-26-1389

620602

3404045

1910

136

9

19

T28-26-1392

620597

3404046

1910

338

9

12

T28-26-1401

620896

3404033

2002

67

5

26

T28-26-1402

620896

3404033

2002

85

20

26

T28-26-1403

620896

3404035

2002

58

5

26

T28-26-1404

620896

3404035

2002

58

20

24

T28-26-1405

620895

3404038

2002

46

5

26

T28-26-1406

620894

3404038

2002

40

20

25

T28-26-1407

620893

3404040

2002

30

5

19

T28-26-1410

620890

3404040

2003

358

20

12

T28-26-1411

620888

3404040

2003

325

5

26

T28-26-1412

620888

3404040

2003

323

20

26

T28-26-1413

620887

3404039

2002

308

5

13

T28-26-1414

620887

3404039

2003

311

20

26

T28-26-1415

620886

3404038

2002

319

5

17

T28-26-1418

620884

3404036

2003

271

20

26

T28-26-1419

620888

3404033

2002

255

5

26

T28-26-1420

620888

3404034

2002

256

20

26

T28-26-1422

620890

3404032

2002

230

20

19

T28-26-1425

620670

3404005

1910

66

5

25

T28-26-1441

620965

3404113

1995

271

5

25

T28-26-1442

620965

3404113

1995

271

13

24

T28-26-1443

620964

3404119

1995

273

6

25

T28-26-1444

620964

3404119

1995

268

11

25

T28-26-1447

620973

3404117

1995

94

10

26

T28-26-1448

620966

3404130

1995

92

7

24

T28-26-1449

620973

3404111

1995

92

16

26

T28-26-1450

620973

3404117

1995

91

17

22

T28-26-1451

620966

3404130

1995

90

21

26

T28-26-1463

620492

3404058

1909

253

10

22

T28-26-1464

620490

3404048

1911

255

5

23

T28-26-1466

620519

3404045

1910

122

20

26

Underground YAK

YAK-26-503

620401

3404064

1956

268

11

50

YAK-26-515

620424

3404105

1955

108

28

31

YAK-26-520

620384

3404089

1954

278

10

50

YAK-26-553

620888

3404131

2023

290

5

49

YAK-26-554

620891

3404136

2023

302

5

50

YAK-26-561

620903

3404135

2023

103

5

50

YAK-26-562

620897

3404130

2023

110

5

50

YAK-26-563

620897

3404130

2023

110

22

50

YAK-26-568

620900

3404140

2023

5

15

50

YAK-26-571

620891

3404136

2023

302

15

50

YAK-26-572

620888

3404131

2023

290

15

49

YAK-26-575

621081

3404068

2028

121

6

36

YAK-26-581

621081

3404075

2028

72

19

32

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/fe3e0d90-df72-40f8-b1a1-22762834fbf0