1. Home
  2. News
  3. Aya Gold & Silver Inc.
  4. Aya Gold & Silver Reports High-Grade Exploration Drill Results Near Pit Depth at Zgounder
Aya Gold & Silver Inc. news

Investor announcements, newest first.

Close
Company news
Aya Gold & Silver Inc.
Jun 2, 2026 at 11:00 AM UTC
Original
ELI5

Aya Gold & Silver Reports High-Grade Exploration Drill Results Near Pit Depth at Zgounder

MONTREAL, June 02, 2026 (GLOBE NEWSWIRE) -- Aya Gold & Silver Inc. (TSX: AYA; NASDAQ: AYA) (“Aya” or the “Corporation”) is pleased to announce high-grade silver drill results from its at-depth drill exploration program at the Zgounder Silver Mine (“Zgounder”) in the Kingdom of Morocco.

Highlights (all intersections are in core lengths)

  • Intersections in the Open-Pit Area:

    • Hole ZG-RC-26-946 intercepted 1,867 grams per tonne (“g/t”) silver (“Ag”) over 6.0 metres (“m”), including 5,100 g/t Ag over 2.0m

    • Hole ZG-RC-26-942 intercepted 739 g/t Ag over 10.0m, including 1,674 g/t Ag over 4.0m

    • Hole ZG-RC-26-799 intercepted 1,160 g/t Ag over 6.0m, including 1,778 g/t Ag over 3.0m

    • Hole ZG-RC-26-943 intercepted 886 g/t Ag over 5.0m

  • Intersections Near the Western Fault contact:

    • Hole YAK-26-502 intercepted 795 g/t Ag over 4.8m

    • Hole T28-26-1152 intercepted 445 g/t Ag over 7.2m

  • Intersections in the Central Area:

    • Hole DZG-SF-26-740 intercepted 1,330 g/t Ag over 4.6m, including 3,680 g/t Ag over 1.2m

    • Hole DZG-SF-26-741 intercepted 1,087 g/t Ag over 5.5m, including 3,347 g/t Ag over 1.5m

    • Hole T28-26-1248 intercepted 2,176 g/t Ag over 8.4m, including 4,298 g/t Ag over 3.6m

    • Hole T28-26-1177 intercepted 1,464 g/t Ag over 4.8m, including 5,480 g/t Ag over 1.2m

  • 9,250m or 30.8% of the 2026 exploration program has been drilled year to date.

"Today’s high-grade results continue to confirm the strong continuity of silver mineralization both around the open pit and within the central zone,” said Benoit La Salle, President & CEO. “Importantly, new intersections near the Western Fault continue to support the significant exploration potential to the west, where development of the exploration drift at the 1825-metre level is advancing ahead of planned drilling west of the fault in the second half of the year. In parallel, drilling along the granite contact continues to demonstrate encouraging high-grade continuity at depth."

This release contains results from 116 holes, which include 5 surface diamond drill holes (“DDH”), 28 underground DDH, 23 reverse circulation drill hole (“RC”), 33 T28 and 27 YAK holes (T28 and YAK: percussion drilling using an air-compressed hammer). For a full summary of today’s results, refer to Appendix 1.

Table 1 – Best Intercepts at Zgounder (core lengths)

Hole ID

From

To

Ag

Length*

Ag x width

 

 

 

(g/t)

(m)

 

Surface DDH

ZG-25-175

127.5

129

2,081

1.5

3,122

Underground DDH

DZG-SF-26-740

22.4

27

1,330

4.6

6,118

Including

24.8

26

3,680

1.2

4,416

DZG-SF-26-741

22.5

28

1,087

5.5

5,976

Including

25.5

27

3,347

1.5

5,020

DZG-SF-26-830

14.8

19

879

4.2

3,692

DZG-SF-26-877

33.7

38.5

505

4.8

2,422

DZG-SF-26-877

44.9

51

646

6.1

3,941

Surface RC

ZG-RC-26-799

6

12

1,160

6

6,962

Including

8

11

1,778

3

5,335

ZG-RC-26-942

129

139

739

10

7,388

Including

133

137

1,674

4

6,697

ZG-RC-26-942

148

150

1,409

2

2,818

ZG-RC-26-943

118

123

886

5

4,429

ZG-RC-26-946

96

102

1,867

6

11,200

Including

96

98

5,100

2

10,200

ZG-RC-26-955

94

103

288

9

2,593

ZG-RC-26-959

51

59

337

8

2,696

Underground T28

T28-26-1152

0

7.2

445

7.2

3,206

T28-26-1177

20.4

25.2

1,464

4.8

7,025

Including

21.6

22.8

5,480

1.2

6,576

T28-26-1181

14.4

20.4

500

6

2,998

Including

14.4

15.6

2,030

1.2

2,436

T28-26-1248

8.4

16.8

2,176

8.4

18,276

Including

8.4

12

4,298

3.6

15,474

T28-26-1249

16.8

26.4

542

9.6

5,201

T28-26-1250

0

4.8

519

4.8

2,491

Underground YAK

YAK-26-447

3.6

8.4

1,741

4.8

8,358

Including

3.6

6

3,365

2.4

8,076

YAK-26-454

40.8

45.6

835

4.8

4,006

YAK-26-463

0

4.8

939

4.8

4,508

YAK-26-502

4.8

9.6

795

4.8

3,815


True width remains undetermined; all values are uncut.

Location of Drill Results at Zgounder


Figure 1: Location of Drill Results at Zgounder

Technical Information

For core drilling, all individual samples represent approximately one meter in length of core, which is halved. Half of the core is kept on site for reference, and its counterpart is sent for preparation and assaying to African Laboratory for Mining and Environment (“Afrilab”) in Marrakech, Morocco or to ALS Laboratory at the Zgounder Mine site. All samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by atomic absorption spectroscopy (“AAS”). Samples grading above 200 g/t Ag are reanalyzed by fire assay.

For definition drilling using RC, all individual samples represent 1.0m in length and for T28 drilling equipment, all individual samples represent 1.2m in length. Samples are assayed at either the ALS Mine laboratory or at Afrilab. All samples are analyzed for silver, copper, iron, lead, and zinc using Aqua regia and finished by AAS. Samples grading above 200 g/t Ag are reanalyzed by fire assay. Rigorous quality controls (QaQc) are applied at both locations.

Qualified Person

The scientific and technical information contained in this press release have been reviewed by David Lalonde, B. Sc, P. Geo, Vice-President, Exploration, Qualified Person, for accuracy and compliance with National Instrument 43-101.

About Aya Gold & Silver Inc.

Aya Gold & Silver is a Canadian precious metals mining company anchored in Morocco and active across the full mining value chain. The Corporation has established an exploration track record through a systematic, technology-led, data-driven approach and is focused on expanding its resource base and land package along the Anti-Atlas fault — one of Africa’s most geologically rich, underexplored and mining-friendly regions.

Aya operates Zgounder, a rare, silver-only mine, producing silver doré from its new processing facility. Aya’s growth pipeline includes the Boumadine polymetallic project, where feasibility study work is underway. The project hosts a sizable mineralized footprint, and potential for further discovery.

Led by a proven team of mining professionals, Aya is guided by a vision of responsible mining and is committed to delivering sustainable value for shareholders, employees and host communities.

For additional information, please visit Aya’s website at www.ayagoldsilver.com.

Or contact

Benoit La Salle, FCPA, MBA

 

Alex Ball

President & CEO

 

VP, Corporate Development & IR

[email protected]

 

[email protected]

 

Forward-Looking Statements

This press This press release contains “forward-looking statements” or “forward looking information” within the meaning of applicable securities laws and other statements that are not historical facts. Forward-looking statements are included to provide information about management’s current expectations, estimates and projections regarding Aya’s future growth and business prospects (including the timing and development of deposits and the success of exploration activities) and other opportunities as of the date of this press release.

All statements, other than statements of historical fact included in this press release, regarding the Corporation’s strategy, future operations, technical assessments, prospects, plans and objectives of management are forward-looking statements that involve risks and uncertainties. Wherever possible, words such as “continue”, “confirm”, “potential”, and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might”, “will”, or are “likely” to be taken, occur or be achieved, have been used to identify such forward-looking information. Forward-looking statements in this press release include, but are not limited to, statements with respect to: the Corporation's mining assets development and expansion potential and objectives.

Forward-looking information is based upon certain assumptions and other important factors that, if untrue, could cause the actual results, performance or achievements of the Corporation to be materially different from future results, performance or achievements expressed or implied by such information or statements. There can be no assurance that such information or statements will prove to be accurate. Key assumptions upon which the Corporation’s forward-looking information is based include without limitation, assumptions regarding development and exploration activities; the timing, extent, duration and economic viability of such operations, including any mineral resources or reserves identified thereby; the accuracy and reliability of estimates, projections, forecasts, studies and assessments; the timing for completion of the updated Boumadine PEA and feasibility study; the Corporation’s ability to meet or achieve estimates, projections and forecasts; the availability and cost of inputs; the price and market for outputs; foreign exchange rates; taxation levels; the timely receipt of necessary approvals or permits; the ability to meet current and future obligations; the ability to obtain timely financing on reasonable terms when required; the current and future social, economic and political conditions; and other assumptions and factors generally associated with the mining industry.

Readers are cautioned that the foregoing list is not exhaustive of all factors and assumptions which may have been used. Forward-looking statements are also subject to risks and uncertainties facing the Corporation’s business, any of which could have a material adverse effect on the Corporation’s business, financial condition, results of operations and growth prospects. Some of the risks the Corporation faces and the uncertainties that could cause actual results to differ materially from those expressed in the forward-looking statements include, among others: Aya’s ability to execute plans relating to its Zgounder Project and Boumadine Project, including the timing thereof; risks and hazards associated with the business of mineral exploration, development, and mining, including environmental hazards, potential unintended releases of contaminants, industrial accidents, unusual or unexpected geological or structural formations, pressures, cave-ins, and flooding; risks related to Aya’s operations in Morocco; the speculative nature of mineral exploration and development; diminishing quantities or grades of mineral reserves as properties are mined; the inability to determine, with certainty, the production of metals and cost estimates, or the prices to be received before mineral reserves or mineral resources are actually mined; inadequate or unreliable infrastructure (such as roads, bridges, power sources and water supplies); fluctuations in forward markets for silver and other commodities (such as natural gas, fuel, oil and electricity); availability of gas, fuel, and oil; restrictions on mining in the jurisdictions in which Aya operates; change of laws and regulations governing our operation, exploration, and development activities, including international laws and legal norms, such as those relating to Indigenous peoples and human rights; the Corporation’s ability to mitigate the risks pertaining to fund repatriation; expectations with respect to any future pandemics on our operations, and assumptions related thereto; Aya’s ability to attract and retain qualified employees and contractors; Aya’s ability to obtain and renew necessary permits and licenses; inherent risks associated with tailings facilities and heap leach operations, including failure or leakages; Aya’s growth strategy; Aya’s ability to obtain and maintain insurance; occupational health and safety risks; adverse publicity risks; third party risks; disruptions to Aya’s business operations; Aya’s reliance on technology and information systems; litigation risks; interest and exchange rates risks; tax risks; unforeseen expenses; public health crises; climate change; weather disruptions; general economic conditions; commodity prices and exchange rate risks; gold and silver demand; volatility of share price; public company obligations; competition risk; policies and legislation; force majeure; climate risks; the effectiveness of our internal control over financial reporting; risks related to competition in the mining industry; changes in technology; asset impairment (or reversal) potential, being consistent with the Corporation’s current expectations; the inherent risks involved in exploration and development of mineral properties; and other risks described in the Corporation’s documents filed with Canadian and U.S. securities regulatory authorities.

In addition, readers are directed to carefully review the detailed risk discussion in the Corporation’s Annual Information Form and Management’s Discussion & Analysis for the year ended December 31, 2025, filed on SEDAR+ and on EDGAR, which discussions are incorporated by reference in this press release, for a fuller understanding of the risks and uncertainties that affect the Corporation’s business and operations.

Although the Corporation believes its expectations are based upon reasonable assumptions and has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. As such, these risks are not exhaustive; however, they should be considered carefully. If any of these risks or uncertainties materialize, actual results may vary materially from those anticipated in the forward-looking statements found herein. Due to the risks, uncertainties, and assumptions inherent in forward-looking statements, readers should not place undue reliance on forward-looking statements.

Forward-looking statements contained herein are presented for the purpose of assisting investors in understanding the Corporation’s business plans, financial performance and condition and may not be appropriate for other purposes.

The forward-looking statements contained herein are made only as of the date hereof. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except to the extent required by applicable law. The Corporation qualifies all of its forward-looking statements by these cautionary statements.

Appendix 1 - Mineral Intercepts from Drilling at Zgounder (core lengths)

Hole ID

From

To

Ag

Length*

Ag x width

 

 

 

(g/t)

(m)

 

Surface DDH

ZG-25-175

127.5

129.0

2,081

1.5

3,122

ZG-26-194

18.1

20.9

268

2.8

750

ZG-26-196

161.0

162.5

108

1.5

162

ZG-26-198

241.0

243.0

116

2.0

231

ZG-GT-21-04

57.5

62.0

111

4.5

501

ZG-GT-21-04

246.0

247.5

277

1.5

416

Underground DDH

ZG-SF-25-307

346.5

347.5

76

1.0

76

ZG-SF-25-307

350.5

357.0

141

6.5

918

ZG-SF-25-346

202.5

204.0

80

1.5

120

ZG-SF-25-346

207.0

208.5

1,304

1.5

1,956

ZG-SF-25-346

322.7

324.2

183

1.5

274

ZG-SF-26-352

97.0

98.0

162

1.0

162

ZG-SF-26-352

149.0

151.0

113

2.0

225

ZG-SF-26-355

143.5

145.0

98

1.5

147

DZG-SF-26-740

22.4

27.0

1,330

4.6

6,118

Including

24.8

26.0

3,680

1.2

4,416

DZG-SF-26-741

22.5

28.0

1,087

5.5

5,976

Including

25.5

27.0

3,347

1.5

5,020

DZG-SF-26-741

87.0

87.9

124

0.9

112

DZG-SF-26-830

14.8

19.0

879

4.2

3,692

DZG-SF-26-853

31.0

31.5

88

0.5

44

DZG-SF-26-855

1.5

2.5

176

1.0

176

DZG-SF-26-857

40.0

41.0

124

1.0

124

DZG-SF-26-857

49.0

50.0

108

1.0

108

DZG-SF-26-861

97.5

99.0

116

1.5

174

DZG-SF-26-862

73.6

75.1

204

1.5

306

DZG-SF-26-862A

126.0

127.0

152

1.0

152

DZG-SF-26-864

9.0

12.0

657

3.0

1,972

DZG-SF-26-864

16.5

18.0

148

1.5

222

DZG-SF-26-865

15.3

18.0

838

2.7

2,263

DZG-SF-26-865

31.0

32.5

360

1.5

540

DZG-SF-26-866

36.5

37.5

96

1.0

96

DZG-SF-26-866

47.8

48.8

176

1.0

176

DZG-SF-26-867

58.5

59.5

2,286

1.0

2,286

DZG-SF-26-868

39.7

41.4

842

1.7

1,431

DZG-SF-26-868

52.0

53.5

80

1.5

120

DZG-SF-26-868

57.7

59.2

681

1.5

1,022

DZG-SF-26-869

9.0

9.5

168

0.5

84

DZG-SF-26-874

66.0

67.0

200

1.0

200

DZG-SF-26-875

73.5

75.0

200

1.5

300

DZG-SF-26-876

27.0

28.5

196

1.5

294

DZG-SF-26-877

33.7

38.5

505

4.8

2,422

Including

33.7

34.7

2,136

1.0

2,136

DZG-SF-26-877

44.9

51.0

646

6.1

3,941

Including

44.9

45.9

2,196

1.0

2,196

DZG-SF-26-880

51.8

53.0

504

1.2

605

DZG-SF-26-881

44.0

45.0

148

1.0

148

DZG-SF-26-896

90.3

90.8

170

0.5

85

DZG-SF-26-896

106.5

109.5

163

3.0

489

DZG-SF-26-905

57.0

59.5

618

2.5

1,544

DZG-SF-26-915

61.0

64.0

281

3.0

842

Surface RC

ZG-RC-26-780

37.0

38.0

137

1.0

137

ZG-RC-26-799

6.0

12.0

1,160

6.0

6,962

Including

8.0

11.0

1,778

3.0

5,335

ZG-RC-26-868

18.0

19.0

98

1.0

98

ZG-RC-26-868

22.0

27.0

131

5.0

656

ZG-RC-26-868

36.0

37.0

193

1.0

193

ZG-RC-26-868

52.0

53.0

102

1.0

102

ZG-RC-26-904

22.0

24.0

167

2.0

334

ZG-RC-26-904

33.0

34.0

131

1.0

131

ZG-RC-26-904

42.0

43.0

77

1.0

77

ZG-RC-26-904

75.0

76.0

152

1.0

152

ZG-RC-26-904

87.0

88.0

93

1.0

93

ZG-RC-26-906

13.0

14.0

86

1.0

86

ZG-RC-26-906

26.0

27.0

82

1.0

82

ZG-RC-26-922

17.0

18.0

255

1.0

255

ZG-RC-26-925

16.0

18.0

142

2.0

283

ZG-RC-26-934A

73.0

74.0

79

1.0

79

ZG-RC-26-939

101.0

102.0

194

1.0

194

ZG-RC-26-940

123.0

129.0

139

6.0

833

ZG-RC-26-941

130.0

132.0

224

2.0

447

ZG-RC-26-942

129.0

139.0

739

10.0

7,388

Including

133.0

137.0

1,674

4.0

6,697

ZG-RC-26-942

148.0

150.0

1,409

2.0

2,818

ZG-RC-26-943

118.0

123.0

886

5.0

4,429

ZG-RC-26-943

133.0

134.0

1,100

1.0

1,100

ZG-RC-26-944

62.0

63.0

82

1.0

82

ZG-RC-26-944

121.0

122.0

806

1.0

806

ZG-RC-26-944

126.0

128.0

148

2.0

295

ZG-RC-26-945

87.0

90.0

243

3.0

729

ZG-RC-26-946

96.0

102.0

1,867

6.0

11,200

Including

96.0

98.0

5,100

2.0

10,200

ZG-RC-26-946

111.0

120.0

256

9.0

2,306

ZG-RC-26-955

94.0

103.0

288

9.0

2,593

ZG-RC-26-958

70.0

71.0

290

1.0

290

ZG-RC-26-959

39.0

40.0

84

1.0

84

ZG-RC-26-959

51.0

59.0

337

8.0

2,696

Including

51.0

52.0

1,685

1.0

1,685

ZG-RC-26-960

48.0

49.0

85

1.0

85

ZG-RC-26-960

50.0

51.0

1,170

1.0

1,170

ZG-RC-26-962

74.0

75.0

296

1.0

296

ZG-RC-26-964

70.0

72.0

231

2.0

462

ZG-RC-26-964

80.0

81.0

91

1.0

91

ZG-RC-CD-26-010

2.0

3.0

84

1.0

84

Underground T28

T28-26-1147

18.0

19.2

76

1.2

91

T28-26-1149

3.6

4.8

80

1.2

96

T28-26-1149

10.8

13.2

130

2.4

312

T28-26-1150

3.6

7.2

116

3.6

418

T28-26-1151

0.0

6.0

229

6.0

1,373

T28-26-1151

8.4

9.6

108

1.2

130

T28-26-1151

14.4

22.8

249

8.4

2,093

T28-26-1151

25.2

26.4

128

1.2

154

T28-26-1152

0.0

7.2

445

7.2

3,206

T28-26-1152

12.0

13.2

264

1.2

317

T28-26-1152

16.8

20.4

129

3.6

466

T28-26-1159

3.6

8.4

239

4.8

1,147

T28-26-1163

0.0

2.4

382

2.4

917

T28-26-1164

12.0

13.2

211

1.2

253

T28-26-1165

7.2

8.4

83

1.2

100

T28-26-1168

1.2

2.4

187

1.2

224

T28-26-1169

1.2

2.4

80

1.2

96

T28-26-1169

3.6

7.2

105

3.6

379

T28-26-1177

20.4

25.2

1,464

4.8

7,025

Including

21.6

22.8

5,480

1.2

6,576

T28-26-1181

14.4

20.4

500

6.0

2,998

Including

14.4

15.6

2,030

1.2

2,436

T28-26-1181

25.2

26.4

80

1.2

96

T28-26-1184

8.4

10.8

447

2.4

1,072

T28-26-1186

7.2

8.4

155

1.2

186

T28-26-1197

9.6

12.0

87

2.4

208

T28-26-1199

18.0

21.6

629

3.6

2,266

T28-26-1200

6.0

10.8

409

4.8

1,964

T28-26-1202

24.0

25.2

163

1.2

196

T28-26-1220

19.2

20.4

132

1.2

158

T28-26-1226

10.8

12.0

77

1.2

92

T28-26-1227

19.2

26.4

153

7.2

1,104

T28-26-1229

21.6

22.8

187

1.2

224

T28-26-1230

4.8

6.0

415

1.2

498

T28-26-1230

25.2

26.4

78

1.2

94

T28-26-1236

6.0

9.6

95

3.6

343

T28-26-1243

0.0

4.8

375

4.8

1,798

T28-26-1246

0.0

4.8

227

4.8

1,090

T28-26-1248

8.4

16.8

2,176

8.4

18,276

Including

8.4

12.0

4,298

3.6

15,474

T28-26-1249

16.8

26.4

542

9.6

5,201

T28-26-1250

0.0

4.8

519

4.8

2,491

T28-26-1250

14.4

26.4

176

12.0

2,117

T28-26-1268

0.0

6.0

96

6.0

577

T28-26-1271

3.6

4.8

140

1.2

168

T28-26-1303

24.0

26.4

153

2.4

366

Underground YAK

YAK-26-439

12.0

13.2

84

1.2

101

YAK-26-441

10.8

12.0

960

1.2

1,152

YAK-26-445

33.6

34.8

152

1.2

182

YAK-26-446

9.6

10.8

344

1.2

413

YAK-26-447

3.6

8.4

1,741

4.8

8,358

Including

3.6

6.0

3,365

2.4

8,076

YAK-26-448

4.8

8.4

612

3.6

2,203

YAK-26-448

13.2

14.4

252

1.2

302

YAK-26-451

44.4

45.6

110

1.2

132

YAK-26-452

28.8

30.0

81

1.2

97

YAK-26-453

24.0

25.2

127

1.2

152

YAK-26-454

24.0

26.4

236

2.4

566

YAK-26-454

40.8

45.6

835

4.8

4,006

YAK-26-457

7.2

8.4

239

1.2

287

YAK-26-460

40.8

42.0

255

1.2

306

YAK-26-461

21.6

22.8

240

1.2

288

YAK-26-462

0.0

2.4

125

2.4

299

YAK-26-462

18.0

19.2

108

1.2

130

YAK-26-463

0.0

4.8

939

4.8

4,508

YAK-26-463

12.0

16.8

349

4.8

1,675

Including

12.0

13.2

1,050

1.2

1,260

YAK-26-469

37.2

39.6

272

2.4

652

YAK-26-470

26.4

27.6

118

1.2

142

YAK-26-472

16.8

19.2

111

2.4

265

YAK-26-472

46.8

50.4

590

3.6

2,124

YAK-26-474

9.6

12.0

124

2.4

298

YAK-26-475

1.2

3.6

345

2.4

827

YAK-26-475

34.8

36.0

159

1.2

191

YAK-26-475

48.0

50.4

154

2.4

370

YAK-26-477

45.6

50.4

370

4.8

1,777

YAK-26-478

14.4

18.0

586

3.6

2,110

YAK-26-479

6.0

7.2

142

1.2

170

YAK-26-479

19.2

20.4

77

1.2

92

YAK-26-485

40.8

43.2

213

2.4

510

YAK-26-488

4.8

7.2

192

2.4

461

YAK-26-500

3.6

6.0

144

2.4

346

YAK-26-500

9.6

10.8

334

1.2

401

YAK-26-502

4.8

9.6

795

4.8

3,815


* True widths are undetermined; all values are uncut.

Appendix 2 – Drillhole Coordinates of Zgounder Drill Hole with Significant Results

Hole ID

Easting

Northing

Elevation

Azimuth

Dip

Length (m)

Surface DDH

ZG-25-175

621236

3404275

2206

135

-55

171

ZG-26-194

621629

3405038

2219

135

-55

166

ZG-26-196

621229

3404365

2206

135

-58

195

ZG-26-198

621115

3404310

2214

135

-58

264

ZG-GT-21-04

620568

3403936

2133

336

-77

475

Underground DDH

ZG-SF-25-307

620407

3403905

1945

180

-86

380

ZG-SF-25-346

620308

3403895

1947

0

-83

450

ZG-SF-26-352

620308

3403897

1948

0

-10

300

ZG-SF-26-355

620306

3403897

1947

346

-53

324

DZG-SF-26-740

621088

3404026

1972

70

-11

92

DZG-SF-26-741

621087

3404026

1972

70

5

110

DZG-SF-26-830

621129

3404072

2018

80

-21

60

DZG-SF-26-853

620982

3404087

1995

3

2

60

DZG-SF-26-855

620980

3404087

1994

342

2

60

DZG-SF-26-857

620978

3404086

1994

321

0

60

DZG-SF-26-861

620700

3403985

1886

54

4

150

DZG-SF-26-862

620700

3403983

1886

64

1

84

DZG-SF-26-862A

620700

3403982

1886

65

2

150

DZG-SF-26-864

620981

3404084

1966

360

13

60

DZG-SF-26-865

620980

3404084

1966

343

0

60

DZG-SF-26-866

620980

3404084

1966

345

10

60

DZG-SF-26-867

620978

3404083

1966

328

-1

60

DZG-SF-26-868

620979

3404083

1966

327

9

60

DZG-SF-26-869

620979

3404081

1966

309

1

60

DZG-SF-26-874

620693

3403986

1886

305

-6

150

DZG-SF-26-875

620692

3403983

1885

289

-7

150

DZG-SF-26-876

620983

3404084

1994

77

-1

60

DZG-SF-26-877

620920

3404099

1997

312

1

60

DZG-SF-26-880

620919

3404095

1997

251

0

60

DZG-SF-26-881

620801

3404089

1937

97

0

150

DZG-SF-26-896

620699

3403987

1886

34

-5

179

DZG-SF-26-905

620760

3404058

1912

312

0

150

DZG-SF-26-915

620793

3404088

1937

262

-20

150

Surface RC

ZG-RC-26-780

621201

3404177

2202

135

-70

60

ZG-RC-26-799

621171

3404134

2201

135

-70

60

ZG-RC-26-868

621349

3404270

2207

135

-70

109

ZG-RC-26-904

621287

3404236

2206

135

-50

110

ZG-RC-26-906

621240

3404177

2206

135

-50

63

ZG-RC-26-922

621243

3404369

2207

135

-70

80

ZG-RC-26-925

621264

3404383

2207

135

-70

80

ZG-RC-26-934A

621231

3404204

2206

135

-70

136

ZG-RC-26-939

621257

3404213

2207

135

-70

150

ZG-RC-26-940

621248

3404222

2206

135

-70

131

ZG-RC-26-941

621239

3404230

2206

135

-70

150

ZG-RC-26-942

621265

3404222

2206

135

-70

150

ZG-RC-26-943

621257

3404229

2206

135

-67

150

ZG-RC-26-944

621248

3404238

2206

135

-70

135

ZG-RC-26-945

621273

3404231

2206

135

-69

150

ZG-RC-26-946

621264

3404239

2206

135

-70

120

ZG-RC-26-955

621283

3404274

2206

135

-68

120

ZG-RC-26-958

621292

3404283

2206

135

-65

75

ZG-RC-26-959

621319

3404273

2206

135

-65

60

ZG-RC-26-960

621309

3404283

2206

135

-66

105

ZG-RC-26-962

621327

3404283

2206

135

-70

105

ZG-RC-26-964

621310

3404300

2206

135

-67

115

ZG-RC-CD-26-010

621448

3404929

2200

135

-55

89

Underground T28

T28-26-1147

620430

3404112

1999

52

12

25

T28-26-1149

620424

3404115

2001

41

11

22

T28-26-1150

620424

3404115

2001

41

28

19

T28-26-1151

620418

3404122

1999

47

0

26

T28-26-1152

620417

3404121

2000

53

5

20

T28-26-1159

620405

3404070

1999

276

13

26

T28-26-1163

620410

3404065

1999

246

12

25

T28-26-1164

620410

3404065

2000

256

25

26

T28-26-1165

620412

3404063

1999

241

11

26

T28-26-1168

620415

3404059

2000

236

29

26

T28-26-1169

620418

3404056

2000

213

12

23

T28-26-1177

620623

3403994

1909

66

11

25

T28-26-1181

620613

3404007

1909

32

17

26

T28-26-1184

620607

3404004

1910

347

24

20

T28-26-1186

620550

3404053

1936

65

12

26

T28-26-1197

620504

3404051

1936

231

7

20

T28-26-1199

621060

3404053

2027

61

13

26

T28-26-1200

621060

3404053

2027

60

26

26

T28-26-1202

621065

3404048

2027

107

9

26

T28-26-1220

620650

3404066

1942

56

27

26

T28-26-1226

620641

3404070

1941

342

22

26

T28-26-1227

620638

3404061

1940

326

11

26

T28-26-1229

620634

3404058

1940

310

12

26

T28-26-1230

620634

3404058

1941

309

22

26

T28-26-1236

621149

3404070

2019

90

10

26

T28-26-1243

621144

3404054

2020

190

9

26

T28-26-1246

620573

3403999

1911

338

4

18

T28-26-1248

620561

3404025

1909

132

14

26

T28-26-1249

620563

3404032

1909

116

10

26

T28-26-1250

620564

3404035

1909

58

7

26

T28-26-1268

620668

3404009

2023

290

8

13

T28-26-1271

620662

3403978

2023

310

8

6

T28-26-1303

621044

3404105

2027

296

25

26

Underground YAK

YAK-26-439

620698

3404077

2004

325

12

35

YAK-26-441

620701

3404092

2005

4

31

41

YAK-26-445

621042

3404096

2027

77

6

49

YAK-26-446

621042

3404096

2027

77

17

41

YAK-26-447

621041

3404099

2027

56

7

50

YAK-26-448

621041

3404099

2027

54

19

37

YAK-26-451

621037

3404103

2027

306

16

50

YAK-26-452

621037

3404103

2027

310

9

50

YAK-26-453

621037

3404099

2027

283

5

50

YAK-26-454

621037

3404099

2027

285

17

50

YAK-26-457

620772

3404048

1937

233

25

46

YAK-26-460

620759

3404049

1937

303

11

53

YAK-26-461

620784

3404053

1937

311

29

44

YAK-26-462

621067

3404112

2051

103

8

50

YAK-26-463

621067

3404112

2051

76

10

36

YAK-26-469

620983

3404083

1995

88

10

50

YAK-26-470

620983

3404083

1996

85

34

28

YAK-26-472

620982

3404085

1996

60

26

50

YAK-26-474

620982

3404086

1996

52

24

50

YAK-26-475

620982

3404087

1995

29

10

50

YAK-26-477

620978

3404085

1995

301

11

50

YAK-26-478

620978

3404085

1996

305

30

50

YAK-26-479

620978

3404083

1995

286

11

42

YAK-26-485

620885

3404069

1965

90

5

50

YAK-26-488

620885

3404072

1965

60

8

48

YAK-26-500

620401

3404065

1955

290

10

49

YAK-26-502

620401

3404064

1956

270

30

50


A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/8c415f0a-e011-4f25-86d9-2a7f864e2203