0:01 Good afternoon, and welcome to the OROSUR MINING Post AGM Investor Q and A. Throughout this recorded meeting, investors will be in listen only mode. Questions are encouraged and they can be submitted at any time using the Q and A tab situated on the right hand corner of your screen. Simply type in your questions and press send. Before we begin, I would like to submit the following poll. And I would now like to hand you over to Chairman, Louis Castro. Good afternoon to you, sir. Thanks very much. Good afternoon, everybody, and thanks for attending this call. I'm Louis Castro, exec chairman of the company, and, here to my
0:33 left is Brad George, who is the CEO. A pleasure to be, here with you again, this year. We've just had the AGM. The resolutions were passed, and, you know, we're now getting looking forward to getting getting back into the business of of running this company. Let me say a few words. Brad will be making a presentation a bit later on, and then we'll have the questions and answer sessions that we we normally have. But if you just bear with me for a few minutes, I'll just make a short intro. I I believe we're in for probably the best four years this company has ever had in the next four years. In Colombia, we're sitting on about 500 square kilometers in one of the most prospective gold belts in the world. And we have, I think, the right team to explore and develop that area.
1:21 That team has found four prospects so far on just one of four licenses that we have on the ground. So we have another three licenses to go and spend some time on and explore, and we're gonna begin on that second license in the first quarter next year. So there's plenty of plenty of opportunity out there, and we do have the right team. There will be ups and downs. Inevitably, that's the way mining is. There will be delays. There will be challenges, undoubtedly, on permitting, dealing with the global communities, environmental, but that's what we do day in, day out. We're handling that quite correctly right now. There will be difficult ground that we go and drill. There will be very stretched miners because the drillers are actually coming under great demand in Colombia right now. It seems to be the destination of choice for quite a few of the majors.
2:11 So there is pressure on getting some good drillers. No question. However, I think we need to stop looking so much at just just just the day to day. We can look after that, but we also need to look at it little bit little bit further down the road and at the horizon.
2:24 So as long as we have the resources and the funds, we do have the team to ensure that we get success along the way. We've got very supportive brokers in London and in Canada. As you all know, we've now just raised some 16,000,000 Canadian together with some 6,000,000 we had in the bank gives us plenty of firepower for the next twelve twelve to fifteen months. Our most advanced project in in Colombia is Pepas. You're all very well aware of that, and that's gonna go into permitting just this coming month. After that, we got Aptar, which is halfway down the license, and we're gonna be resource drilling that this year. But probably the most exciting bit is our cluster of porphyries down to the south of the license. So there's plenty there in that area, the clusters of I'll let Brad talk to to more detail on that.
3:12 But for now, the Colombian government has just been elected just in August last year. They're already talking about what they can do to help the mining industry, and they are starting to deliver. It will take a bit of time to bring those changes through. But we're in the right asset at the right time with the right group of people, and that's just in Colombia. We've also got another asset showing great prospect in Argentina, which is also being seen as quite desirable with some of the majors. We got in there five years ago when when no one wanted to be there. We're there now. We'll talk a bit more about that. But, really, the focus is on Colombia. And I will hand over to Brad now to tell you mostly about that, just a little bit on Argentina. Anyway, Anyway, I'll come back to you for the questions and answers a bit later. So listen for the moment. Thanks for your support. Thanks, Louis. So Louis and I are in Toronto, so I guess that's good afternoon to those in The UK.
4:03 The presentation today will be a little bit different. I'm assuming most of the the viewers are existing shareholders, so you know the history. So we'll focus mostly on on on going forward rather than than looking backwards.
4:18 The the share price graph, is not as we would wish. I'm not here to give excuses. You you all have a view on that. Our focus instead is is really, you know, how do we turn this around and and where where do we move forward? I guess my sense is that that much of the, setting aside macro issues is been our inability or unreadiness yet to provide some surety on the steps moving forward, particularly for PePa. So I think that's about to change, and hopefully, some... We'll answer some questions today on that regard. The key point for us remains, however, is that very, very strong cash balance. 16,000,000 US, more or less, puts us in a very, very strong position at a time when the junior markets or the capital raising window, but junior markets are essentially closed. We're we're in a very firm position.
5:08 You know the story, two major projects, Colombia and and El Pantano in Argentina. Today's talk will be predominantly Colombia with one slide the end for for El Pantano. The keys for us is that, you know, we're in... Well, for me as a geologist, very large pieces of land. That's always been key for me. You can't you can't explore on postage stamps, so very large pieces of land in two of the major gold belts in South America. And key again for us. We own them both a 100%. Both were subject to JVs. Both we've now cleared off, and we own them both a 100%, which which again is key for me. It gives you optionality. As a company, again, ownership a 100%, which is key. We're quite well spread across the spectrum of development from one project going into feasibility through to drilling to resource, through to exploration, through to to grassroots. So we're we're quite well spaced.
6:01 One high grade resource, and to me, that's key for us. You know, I'm not focused on ounces. I'm focused on the the nature of the ounces. I'd rather have fewer high grade than more lower grade. Makes a massive difference in terms of the economics, the capital cost, the operating cost, and most importantly, the ability to raise money to build a mine. Grade grade is king. It's always been been the case. So as a company, we we have continued with the strategy of running two parallel streams, one project moving into feasibility and production in the future and exploration. So, you know, we can run both. We have the capacity to run both. I think that to us makes sense and that we can cater to a wider spectrum of investors, you know, someone production, someone exploration.
6:48 We, you know, we're trying to do all things to all people. The key, as Louis mentioned, for us at at... In Columbia, you know, while we like Pepas and that's going to be moved into the into the the permitting phase, the potential to the south at the El Cedro, Yrumo Porphyry cluster, and I'll talk about later on, is is extraordinary. We've only just begun. We've we've drilled one hole. That hole was very, good. On a project of this size, it's it's a very good place to start, and the upside is is enormous. And we have three rigs still running active in Colombia, and I'll talk about those in in a little more detail. So where we are? So Louis and I were in in Medellin last week for the Colombian Gold Conference, and that was an immensely bullish conference.
7:35 It was interesting this year. It was slightly more technical than it was in the past. So it was good for us, and then we got to see some technical presentations about Guaya Balas, Quebradona that we'd never seen before. So geologically, we learned a lot, and that was very interesting. So the Mid Calico Belt is the gold belt of Colombia, just West Of Midi... West West Of Midi Inn. These projects are enormous, and we've only just begun. So, obviously, to the north,, they updated their numbers. I think they were looking at eleven eleven point five million ounces is about seven and a half grams, and that's that's extremely juicy. Quebradona, AngloGold, they've... They gave a very good talk where they're modifying their mining plan. They've gone from a massive low grade porphyry, and they're now looking to develop a smaller higher grade core. I say smaller, it's 100,000,000 tonnes at 1.4, so, you know, it's all relative, but they're moving back to a much more attractive, socially acceptable high grade core.
8:32 Mamato Arris, again, huge. They... I think they're going to be in production there in December, this this next month. So that's a massive development down there. And Guaya Wallace Collective Mining, they announced their their maiden resource a few months ago, five and a half million ounces. They will double that quite easily, and they plan to be in production in about 200... Two thousand and thirty, thirty one, they said. So again, we're in the major development corridor of Columbia, and we're in a very good position. Again, just the background slide, we own the project a 100%. Those of you who've been around for a while would be aware that it was subject to a JV with Agnico in Newmont from 2018, and we finally got rid of them, to be polite, at the end 02/24, and we we got the project back, and we began to drill, and and, obviously, Pepas was a result of that. So being back in control is... Was always key for us, and we've...
9:26 I think we've had we've had a pretty good run our achievements to... From from that point have been have been quite extraordinary. And we're now coming into a time with this change in government, which, you know, is is is really a one eighty degree turn from going from being somewhat antagonistic toward toward mining to now being very, very mining friendly. So the the activity levels in Colombia are ramping up extremely fast, which as Louis said, is good, but it creates challenges with some suppliers, drilling drilling being one. But But these are good problems to have. So Pepas, again, an old slide. We moved this to resource. It was announced in February February this year. Small, but the key issue is us is small, but it's very, very high grade. And this is just...
10:13 I still try to think back in my mind of ever having seen anything like this. Yes. It's small, but to get to get, you know, five grams in your hand at service is is extraordinary. The width of this is not a narrow vein. It's a big thick wedge of tuff. It's the perfect shape for an open pit and top of a hill, power line nearby, and we're two kilometers from the main highway. So it's just... It's what it is and where it is makes it quite extraordinary and lends itself to, as we talk about the next few slides, nearer term production. And then around it, we're finding more. So Pepas West, we're looking at, yeah, we think is transported material between running between one and three grams, and we're finding more to the north of lower grade. So PEPAS sits within a lower grade halo and that material to the West. So we're we're reasonably comfortable that, you know, while we're looking at a ten year production level, PEPAS we'll add more years with surrounding material. But...
11:13 So it's a very it's a very nice place to start. Permitting. So we, yeah, we talk about permitting, I guess the question, what what does that mean? We're not we're not filling out a form and sending it off. It's actually a complicated process with multiple silos of activity with multiple agencies. It's it's not a simple process. As Louis pointed out, we had a government change at the beginning of the year of August. They took they took power. We got a new president. That then becomes the new new head of the MINR ministry, the new head of the ministry, the new head of the A and M. That that all feeds down to to new leadership. Now we've... Every day now we're seeing some news flow from Colombia with some new decree indicating a very enthusiastic change to being pro mining. That's positive. The complication being that translating a positive sentiment into actual legislation takes time. You can't just turn on a dime. Changing regulations, changing rules, changing legislation is a slow process.
12:15 So for us, that's a challenge, an opportunity. Opportunity, and it's a very, very good move. But our issue is, do we wait for those changes, or do we move now on the basis of the rules as they stand, but giving ourselves the ability to modify and and and and change as we go along, which is what we're doing. So we're submitting things now, but in a way that we can we can modify as and when rules changes. So essentially, we have three components to the... To what we call the permitting process. So one is the PTO, and we've talked about that. That's a Colombian standard technical document that outlines the general scope of what we propose, you know, what we're gonna do, where things will be, how big the hole will be, how many ounces, footprint size impact. So that's the PTO.
13:03 Our PTO is a bit different in that we we are basing this PTO upon an older preexisting environmental permit that stems back from an old gypsum mine, which sits above Aptar. You can only have one one PTO per license. And for us, curiously, all of our prospects, Pepas, Aptar, El Cedro, are all on the one license. So we modify modify an existing document from the old gypsum mine. That's now done. We've been fine tuning a few things, a few a few wording issues. The deadline for submission, that is December 7. That will be submitted in advance of that. So we're submitting that now in in a matter of days. That, in effect, triggers the process, but we can go back and modify that. The bigger issues that then follow are the environmental and the social side. So the environmental permit is a much bigger document that's now beginning, and the social side is a a more of a nuanced combination of of documentation plans and just, you know, social acceptance, just being part of the community. And that's been ongoing now for quite some time.
14:07 So putting it into silos. So the PTO said, which will be submitted in a matter of days. That triggers all of these processes. You could argue, I guess, it's kind of a hybrid between a PEA and a PFS. It sort of sits between the two. It gives us a sense of of what we're gonna do and how we're gonna work it, and we can use those things to then feed into later studies. But the point being, it can be modified down the track. So that sort of sets the scene, but it can change. The bigger beast is EIA, environmental impact assessment. This is the document that goes to a separate ministry, the Ministry of Environment, and under that, the ANLAA, which is a national agency. Although we're a smaller firm, we would probably come under the the local antiochemia level, which is called antiochemia. It's it's a local agency, but the the same rules.
14:55 This is a much bigger study. So it's, you know, trees, it's water, it's it's it's a whole range of things. The rules as they currently stand require two seasons, wet and a dry season of monitoring, so baselines. Luckily, Colombia is just wet or dry, so that's a six month process of baseline starting. That's commencing very, very soon. And then the plan would be all going well. We submit that EIA middle of next year. So that's that's the process now beginning. That's actually very fast. Surprisingly, you know, coming from Australia, you would normally have to do two years of baseline studies. So, you know, Columbia in that sense is is is, you know, does offers offer offer us the chance to to move things forward at a faster pace. The AI doesn't have the ability to be modified to the same level as the PTO. So if we wanna expand or change things significantly, we add incremental AIs to to that process.
15:49 So as things currently stand, the the impact assessment begins pretty much in the next week or so, and that will run through the wet and dry season with with a view to submitting in the middle of the middle of next year. And the social side, as I said, is is a slightly more complicated mix of of us being on the ground, and and we've been running the project now for some years. So we've had ongoing social programs just to generate that level understanding of who we are and what we plan. You know, working with schools and groups and the mayor and and and various various stakeholders. So we have a very high level of acceptance in the community. So that's been positive, but a long time a long time coming. That then also translates into more formalized now social impact studies, you know, impact on, you know, noise, dust, vehicle movements, forests, a whole variety of things.
16:40 The joy for us, of course, with Pear Pass is that no one lives there. It's empty country. There's a couple of cows, so we're not having a major impact upon any community or village or town or things, but you're still required to do the work. And the other issue being we do need to understand and get access to the various various parcels of land, either where the mine is, around where the mine is, and then areas through which trucks might move to get to the highway. And that's going to be a combination of negotiating rights of access or through what call them in Colombia, or in fact, even buying the land. And we're actually in the process now, have been for a while, and actually purchasing land. So that's an ongoing process. We are becoming farmers, I guess, in a sense. So we will have a combination of direct ownership of land and service rights and and rights of waste. So that's an ongoing process. So...
17:30 And the key, I guess, for us, I said, and and this this was this was given back to us at the conference last week. It was made very clear by the various government departments or the companies that while there is a a macro sense of being very mining friendly, there was also an understanding that things had to be socially acceptable. And so most of the companies now are understanding that they don't have a god given right to do what they want. They must put forward a mining plan, which is perhaps smaller in scope, but less environmental, less social impact, and that seems to the movement. We are lucky. Pepas is, by definition, very low impact. Yes. No one lives here. Very small scale, very high grade, very fast to develop. So it is it is, by definition, already in the right space, but we need to obviously still work to the processes. So that social side begins... Has had been going now for twelve months on a more general sense, but the formal part is actually starting probably tomorrow. So as I said, these these things run. The PTO submitted.
18:29 The EIA comes in middle of next next next year, and the social side is is probably a similar time. So this for us is very positive in terms of moving forward. We we control what we can control. What we can't control, of course, is what happens then, and the government's ability to deal with these things is obviously somewhat subject to their expanding their own their own site capacity. You know, again, one of the challenges of it becoming a very busy country is suddenly there's a much higher workload upon the various government departments. They recognize that. They're ramping up, so they are recognizing that they need to be more responsive. Again, that's a very positive response. We then move into a more formal study on the site. Now whether we call this the PEA or PFS, we can have the debate.
19:20 The issue with the PGL, I said, is is the Colombian document, and it's not a public document. We can't disclose the major details. We can't disclose the costs that are in there. We need to go to a more formal forty one zero one compliant document. That will commence, I would hope, in December or probably January using a different group. So that will be based upon the the IDs in the PTO, but running along two parallel streams. Stream a being... Well, both are based upon the base case of of 500 tons per day. The question then being, what do we do with that material? Do we either, a, produce a fairly consistent product and sell to a to a nearby mill toll treating, or do we build our own plant on-site? We'll we'll we'll examine, yeah, we'll examine both in detail.
20:06 The point being, that gives us more detailed information financially. The the the... This study would be based on the PTO, but more detail and more granular, more specific about what we build machinery, where it comes from, sizes, scales, locations, a far more detailed financial technical document. That one assists us in our planning and also is a much more detailed package that allows us to then examine funding option, which is important for this going forward. And, of course, allows us to then talk to the market and say, right. This is the plan, and these are the numbers because it will be for the for the one on one compliant. That I expect to to commence probably in January. The feedback is at the moment that's between three and four months work. So we look at having that that that PA PFS done in the second quarter of next year.
20:57 So that's PEPAS. And, obviously, as those things progress along the timelines we put in, we'll update, you know, when we formally submit things, and and, hopefully, we'll have more news flow coming, but that's the current guidelines. And then exploration is the second the second tier of what we're doing. Large parcel land, Pepas is is on the far flung northern corners. It's a small part of what we think is a much, much bigger system. It all sits, you know, with... They're getting arm waving in macro. This is all sits within the one major structural corridor. This this is... We're looking at look at Miocene. So Miocene is quite young, about 8,000,000 years old. So Miocene reactivation of older structures from the Cretaceous, say, 80,000,000 years old, that most of these big porphyries have come in at that... About that time, the Miocene.
21:47 So the key for us is that
21:49 porphyries will exploit zones of weakness, and those zones of weakness are created as a result of that myosin reactivation. So to the north, in the middle of the area, we have the the large Virgin Sita intrusive, which is Cretaceous, older rocks that would used to be called Lassa Sita. That that older massive block of intrusions acts as a as a very solid block. So when we see these later reactivations, they are forced to deform around that block, and that creates what we call dilation zone. It opens up space into which these later porphyries then intrude and exploit those zones of weakness. So these precious shadows, north and south of of of that intrusion, are the key corridors where we're seeing these things come up. So we're focusing on El Seville. You remember on the South, On the North of Antusion, we should see the same thing, but we haven't been there yet. So we'll be looking at programs here in the next the next next couple of months. So Pepas is on the same the same North South corridor, and Abta, El Yruma, El Cedro sit within what the guys try to call a bit of a golden triangle, but the name's been used before. So in this major dilation zone to the south of that big intrusion, it's opened up space for multiple porphyry intrusions.
23:04 So we're seeing what we think could be a potentially substantial camp scale set of intrusions, and we've only just begun. Aptar being the smallest of those, El Cedro is certainly something that, you know, we are very excited about, but having drilled one hole, you know, we've just scratched the surface.
23:24 So going back up to Pepas. So as things currently stand, Pepas is defined. We've been drilling to the north of Pepas, we're finding, as I said, more low grade material, some interesting things that require follow-up. We were always very keen to go to the south, Pepe South. We're gonna change that name. It'll it'll be it'll be named Lemon Area, which is which is basically lemon tree because there's some lemon trees to the west of it. It sits within this North South corridor. Again, we're seeing this sinisterial reactivation. Now just to give you a agility lesson, sinisterial means left, and dextral means right. So imagine you're standing looking at the fault, a sliding fault. If the rocks on the other side of the fault go left, then that's sinister. If they go right, that's dextral. So when I say sinister, I'm meaning the, you know, the
24:11 fault has moved to the left. And what this what this does is that when you've gone from Dexter to Synastal, it pops open these little secondary structures that run from southeast to northwest into which these porphyries then then flow. So this is a smaller system to the south, but it's seen obviously a little porphyry that's created PEPAS, and we've been mapping mapping and sampling to the South, and we found rocks and structures that look to us very similar to PEPAS. Yeah. No assays yet, but it looks the same structure, the same system, the same kind of classification, so very exciting. We will be moving the rig down here. Well, the rig actually is there now. So we've talked about drilling. Drilling has been challenging for a number of reasons. I'll talk to in more detail.
24:57 Pepas was easy to drill because there was a road right past it so we could drive the rig in. Pepas South is not that easy. It required a helicopter access, required a different kind of rig that we had at Pepas North. Thus, the decision to move the rig from Aptar to Pepas because the Aptar rig was heliportable. So it was just shifting shifting rigs around, have the right rig in the right location. So the rig from Aptar ceased there a couple of weeks ago. It was choppered into Pepas South, I think, on Friday. They'll be stuffing about for a couple of days, and we hope to be drilling there probably beginning of this week or middle of this week once the pad's all set up. So we begin drilling at at Pepas South, the Lemon area pretty much immediately. There's still there's still one rig north of Pepas. That will finish that hole probably in a week's time. That rig will then demobilize. We have we have, again, rationale for having the right rigs in the right places and also the right drilling contractor.
25:52 So that rig at Pepas South begins in a matter of days. Aptar, we all know historically it's now seen over 40,000 meters of drilling geologically of a similar kind of style to Pepas, albeit deeper. Some tremendous high grade numbers. We've drilled five holes there the last month to try to address some of the geological questions of what controls these high grades. We've now got some better ideas, and that's now formally moving into or back to formally move into the resource drill out phase. Now the challenge there, again, is the right drill rig in the right the right location. So we felt that the drill rig that was here
26:28 probably wasn't wasn't well designed for this job. We're drilling through a few major faults. The trouble with these little these little helicopter rigs is that they they don't quite have the same level of power. They're good enough, but they they... They're a bit a bit under underpowered for these. And being being a bit more complicated, having different components, they are... Oh, yes. We are finding perhaps slightly more, not so fragile, but more things to go wrong. So this rig's gone to Pepe South. We are now planning to bring in a different rig here, a bigger rig, a track mounted rig, a more powerful rig that can do this drill program a little bit faster and a little bit more reliably. So we have a bit of a drill plan developed. This is this is implicit long section of the the Aptar deposit, you know, very high grade in this sort trend, and we've planned initial program of about 6,000 meters over twenty twenty one holes that will commence hopefully in January. This needs, among other things, need to put to put some tracks in along the top of that ridge, which gives us two platforms, and get this different rig in, which we hope can can punch these meters slightly more quickly than the current rig can. So, again, it's just a question of of making sure we can do this program as efficiently as we can. And the the key for us is that, you know, when you're looking at drilling costs in Colombia now of of plus $350 an ounce per meter, it's getting expensive. And therefore, you wanna make sure you're getting maximum bug fee... Bang for your drilling bucks. So we wanna be very efficient in in putting holes in such a
27:58 way to minimize the meters and maximize the ounces. So it's it's not just bashing holes down to making sure the holes are in the right place. This will hopefully commence drill rig availability depending in January. So moving us to Alcedro, this is what we like geologically in terms of its potential for scale. Now as you would all be aware, we announced a partial assay from SED 1, the first hole here just before Beaver Creek. That was 61 meters of point nine seven grams gold from surface, which was... Well, I don't want to go into the pillars, but it looks quite quite exceptional, and then pushed on down to 270 meters at about point six five. Now what we found subsequent to that, we had an on-site session two weeks ago with all our geologists, and we've reformed some different ideas of what's going on there and then couple that with some of the talks we saw in in Medellin last week.
28:53 We think now that that hole is moving away from the porphyry and becoming less interesting. So the top half, it looks really great, but we're seeing as we move away, reduction in alteration, reduction in veining, and we've taken a view that that hole is becoming less interesting. So that hole was terminated a couple of days ago at about 400 meters. It was originally planned to be 500 meters. We pulled a 100 meters short. So that, among other things, saves us about $35,000, but that was taken on basis of we felt we were drilling away from the zone and therefore having crossed the faults and crossed structures, less attractive, so that's been terminated. So the rig has been swung around, and we've now begun to drill a second of those holes from the same pad, although we modified the direction. Zed one was drilled directly due south, north to south. Zed two is drilling from southeast to northwest back in toward the porphyry system.
29:43 That commenced drilling on Saturday. I think they're currently about 30 meters. So... And what we're seeing is at the bottom there, just some, you know, some very, very nice... Again, what we saw in the surface of said one. Lovely porphyry material, lovely alteration, stock work vading. That's that's looking to be a very interesting hole for us, and I said that that's now drilling quite well, that that hole will progress. Again, we have the target depth of 500 meters, but but, you know, we have... We reserve the right to modify short or long depending on how those results go. So this is our second rig now drilling well. We've had issues in the past, but hopefully those are resolved. As part of that recognition that we need perhaps to change our drilling, we are, as we speak, swapping contracts with a different field contractor with a view to some bigger bigger rigs. As I said, the the smaller rigs said one pad did require chopper access, so that was... Had to be what it was,
30:37 But we now see the limitations there on its depth penetration and its, yeah, its complexity. So we've now identified a a bigger rig, a more powerful rig, a different contractor, and we're swapping contracts now. And we hope that that's... That rig will be on-site in a week, ten days time. Hopefully, less than that will be in in... On top of the hill, smack in the middle of El Cedro, drilling into the the the top of that system. And, again, from what we've seen at the talks last week in terms of how these systems develop, we think that's... That has the potential to be a very interesting hole. There were some old artisanal tunnels there now long since abandoned where we were seeing one, two, three, five grams in... Extracted from those from those vein system in those tunnels. So looks very interesting. They said bigger rig, more powerful rig, shouldn't have the same issues with fault structures and and and difficult ground and can go deeper.
31:29 And that hopefully will be commencing in, as I said, will be ten days time, subject to the to the final final contract negotiations. So I guess it brings us to the timeline. I mean, we've done these in the past, and we don't always meet them. We try to, but I guess the caveat being that exploration is not an exact science. You know, we have our... We have a view on how things should work. We give them our best endeavors, but, you know, things change for better or for worse. So so giving rough timelines. I said two commenced commenced two days ago. Drilling well, albeit early days. The Limoneira drilling, the rig is now on-site, and that should be drilling in a couple of days time when the pad's completed. Social programs, we saw an email today. They'd be in today. So that that... They're they're underway, or they begin formally today based upon the last twelve months of of already background work.
32:20 We submit the the the PTO to the department probably in a week's time. Certainly, it's well in advance of that deadline, so that that begins. The second rig at El Cedros mobilizing in a matter of days. Now let's let's let's say next week and then a few days getting PANS ready. So so that's... That should be starting. The EIA commences in December. Again, that's mostly just background work measuring measuring sample trees, forestry, water usage, so it's just scientific baseline study work, but that commences. The PFS, external PFS with forty one zero one will commence, to be fair, probably in January. By the time I get back to to Perth, we decide on the contractor. There'll be some adjustments to scope and various things, and I would suggest probably in January, that that will move forward.
33:09 MRE for Aptar drilling, that will commence given the availability of rigs. As as we mentioned, drilling in Colombia is getting a bit tight, and that's that's a good thing. You know, I think there are 17 rigs running at Cape Verdona. The Aras Mine has got half a dozen. There's up north as every rig is basically fully occupied or at least the drill crews. It's probably people is more of a challenge than than equipment. You know, being a driller is a bit of a black art, and given the last few years of quiet time in Colombia, a lot drills left to get to find work. Getting them back is taking time. So we are seeing more drillers coming. We're seeing expansion capacity. So it... There is recognition that it's now a very busy country. So they are coming in, but it just takes a bit of time. So we have an expectation we can get that second rig into into Aptar in January.
34:01 El Dirumo part of that, so El Cedro system. We think it's extraordinary. We're mapping and sampling. We are raising the potential to have a fourth rig there. So beginning work at Aptar gives us our third rig. The fourth rig at El Duroimmo, we want to. Again, it's a question of availability. So, you know, we are looking for different drillers. We're knocking on doors, but, you know, we are somewhat subject to availability. So we have three. This could be the fourth, the Watten Sea.
34:28 As I mentioned, North of the Virgin Cedar intrusion, we should, in a macro sense, see the same kinds of pressure shadows we're seeing in the South Of El Cedro. We've never been there. So those licenses up there were only granted at the beginning of... For the end of last year, beginning of this year. We do have some obligations on the license condition to go there, so we'll have field programs there in a... Probably by the end of the year just mapping or sampling for the first time. We are... Historically, we've seen some very high grade geocopy up there, so we're very keen to get up there and and look at that in more detail. But that's but that's for the future. Land land access slash acquisition is an ongoing issue. We've already acquired a few parcels of land. We have more in negotiation, and we're also negotiating rights of ways. So in the next couple of months, that'll that'll be a piece by piece process of just having all the little... The the parts of the puzzle put together to wrap up the the Pepas development.
35:23 And then the PFS, all going well, would take three to four months, will be completed in in April, May next year, and and the rest the rest goes from there. So it's it's certainly accelerating now in terms of drilling and accelerating as we move forward in the permitting process. So it's it's quite quite good timing. Then moving just the last slide to El Pantano. This is a project we picked up five years ago when Columbia was being run by our partner, Nico of Newmont. Early stage, it was... When we when we got there, I mean, untouched, never been walked on. Massive system in a major gold producing district with massive 10, 20,000,000 ounce mines. Lovely geology, geochemistry, massive epithermal system,
36:07 all the right rocks, never been touched, and and a really good joint venture. So we drilled our first program there beginning of this year, showed all the right geology, shows that there's a massive system, shows that we're probably above the system, which I guess is the key point. These things are quite vertically donated. So we've seen all the fluid flows, the structures, all the plumbing, but we think we're probably a bit too high yet. We need to go deeper. But the key the key for us is that that last... Well, that first really program ended the JV. We now own the project. So to a degree, this can now... So it's not turned off, but turned down for a while. We have no time pressures. The holding costs here are quite low, much lower than Columbia. So this is a good project. But at the moment, we're we're having some discussions about what the next phase is. We'll do more geochemistry. We made it to game, but right now, Columbia is the main game. But it's a very good opportunity for us to have in in in a in a bullish gold market.
36:58 And the key for us, as we said, we have two projects. We own them both 100%, and they're both big pieces of land in major gold belts. And that was always strategically key for us. Particularly in Colombia now, you know, we we sat in in the meetings last week, every company... Big company wants to come to Colombia, but they can't. There's no... You can't just come in and walk up and pick up ground. Everything's held all under various government embargoes, so there's no there's no really walk up starts unless they talk to us, and we're not interested. So we're in a good position. Yeah. As we said, I think the next few years are going to be quite exciting. So we we go from here. Thank you. Thanks, Brad. Excellent. Okay. Well, look, we'll move on to the questions and answer session now.
37:46 We devised and Brad wrote that presentation, really trying to respond to a number of the quote. We had some 30 odd questions, which is quite a few. And I think a lot of these will be dealt with... Will have been dealt with in the presentation, but I'll I'll go down a few, and we'll see if there's something else we can say. That's a question relating to the ability to... Well, to be able to hire people to deliver what we wanna deliver. How do we find how do we find that game? We do recognize that there will come a time when we need a dedicated... What we call it, an engineering capacity. I mean, I'm a gelders. Louis is a... Whatever the hell Louis is. You know, all of our team at the moment are geared toward the functions we're involved in, which is exploration and permitting and social side. There will come a time, and we recognize this, where we are going to need a dedicated engineering kind of person.
38:37 We are looking for opportunities, but it isn't today. We don't need that person right now. Right now, everything done with PEPAS is being done by consultants. The environmental guys are doing their work. Does our work. The PTO has been done, and the PFS are done by, again, external consultants. So, yes, there is going to be the need to increase our our HR capacity. We recognize that gap, but the timing is probably going to be later next year. So... But we are looking for key people that don't come cheap. So we are quite conscious of not not loading up our overhead base, but certainly, yeah, we do recognize that needs to it needs to change. The next one question relates to more detail on Pep Bus. Well, I think we've gone some detail on that. In that slide, they talked about the PTO, the EIA, and the social activity, and we've put a timeline to those activities in in the presentation.
39:30 The next question relates to the importance of getting Baybus to production. I think we all we all recognize the importance of that clearly because any cash flow coming from there will be fed back into the into into the drilling that we're planning to do. However, clearly, there will be a time between us putting in the environmental impact assessment and the government responding. It's very difficult to estimate how long that would take. You know, if you look at competitors and what people are saying, which is collective mining, I'm talking about 2030, 2031 to get into production. That's quite long. That's sort of three to four years out. More commonly, two years is the sort of time that people are looking at. So it's it's difficult for us to, you know, put a pin in the in the timetable and say, yes. That's definitely gonna be it. But we have a rough working idea of where we're going, and the important thing for us is to focus on getting this environmental impact test done in the next six months, as we're saying.
40:26 The PTO is there already. The PTO gives us flexibility to go from toll treatment to perhaps producing our own dore, as Brad has already covered off. And and we're... Yeah. We'll we'll be able to do that with the teams with the teams that we've got. Next question. Define plan and timetable for delivery of Pepas. I think we already covered that. There's a question on how easy to get long lead items ahead of resolution of environmental and permitting permitting matters. We... Yeah. As I I as I made the point, there is a a major shift in the government attitude toward mining, both from the mining ministry and from the environmental ministry. But turning the Titanic takes time, and we have to be very careful that we don't front run policy changes. You know, we're seeing certainly very positive communication with the government, but they said they'd have to translate into actual regulations, that's that's not as easy as it sounds. So our decision certainly is to go now, but with the flexibility to to make changes to those plans should we see, you know, things progress as we hope they will.
41:38 All we can do is what we can control. So we're submitting documentation as per the regulations. We're doing studies as per the regulations. The responsiveness is obviously we can't control that. And certainly, the feedback from the government is they're trying... They recognize shortcomings in their capacity. They've certainly made some changes in allowing certain things to run-in parallel. In the past, sync was sequential. Now I said, no. No. You can do things parallel, which is encouraging. We'll submit, and we'll see. But we we are very confident that that the attitude there and the preparedness to move things forward is certainly existing. It's a question of their capacity, but that's being addressed. So, yeah, we... I can give timelines on what we can do. I can't give timelines on what the government response is. So... But certainly the feedback is positive. Yeah. We'll see. And if I could just add something to that, we do have a Pepas potential mine in an area which is, as Brad has already said, actually. There aren't any villages there. You know, very very little activity going on top of a hill.
42:41 Yeah. It's it's it's as easy as it can get, really. But, nevertheless, you know, governments take their time in getting back to us. And I've already spoken roughly what we may end up on on on timing. Again, difficult to be too precise on that.
42:53 There's a question on the type of production coming from. Well, we've spoken on that. Again, we've talked about toll treating and and the alternative, which is to put our own plant together. They're not necessarily mutually exclusive. One could start toll treating, build up some cash flow from that, and then go ahead and, you know, get the plant built and and and do that. We will see what the best approach is gonna be once we once we progress with these things. One of the one of the other benefits of PEPAS is that metallurgically, it's pretty simple.
43:28 We've done the metallurgical testing. It's not amenable to flotation other than at at the bottom because it's... Because that surface It's oxidized. Sulfur's gone. Therefore, the top half is is not amenable to flotation, and the gold is quite fine grained and therefore not that amenable to gravity processing. It's just amenable to off the shelf bog standard cyanide leaching. So very simple. Nothing smelly in there. Nothing deleterious. It's just a very simple, very amenable to off the shelf processing. So we have carried out some some very back of the bag packet examination during this year on what a plant would look like. And, again, because it's so simple, it's off the shelf material. We get a we get a couple of ball mills, tank here, a tank there. We can we can cobble together a plant on-site quite easily, quite cheaply, quite quickly with off the shelf material.
44:22 We've examined... We put out a few feelers about lead times on various things. Nothing at this stage tends to be very, very, very serious. Again, because we're looking at small. If you're looking at massive things that have to be fabricated from scratch, that's a different beast. Because we're looking at small modular opportunities, most of those things are available with quite short lead times. The challenge for building a plant on-site is not the plant, it's the tailings dam. And that's that's that's the one that that environmentally we need to be careful of.
44:55 Again, we own the land, so we we can put it somewhere that we own. That's fine. It's just a question of finding a location that's environmentally benign, acceptable, and that's what we're looking at now. We are examining topography and where one would go, and that potentially could form the basis of a modification going forward. But as things stand right now, the PTO is based upon the notion of toll treating. So we produce on-site. We mine. We blend the ore with some of the surrounding lower grade material. We have a two stage crushing system to get down to one one to three mil, and we produce a fairly reliable four to five gram material at 500 tons per day, and that gets to the bottom of hill. And we're having a few discussions with some existing operations nearby.
45:44 You know, once once you tell them what you've got and that you can provide this reliable day in, day out for ten years at high grade, that becomes very attractive, particularly from underground mines who who are always running running fast to stand still. The idea that every day, you know, the the PEPAS trucks can arrive is is quite attractive. So those conversations have begun, and that will form part of the the whole process, but we're also in parallel looking for where we might build a tiling stent, which is which is a major addition to to to the going itself alone, you know, that will come in time. So that's the beauty of bed bus. It really does have the resilience and, you know, can be toll treated. But we'll be looking at both those options, and there'll be more detail on that because inevitably, there'll be more questions on this.
46:30 More detail on that and specifically the economics, broad economics, if you like, and scoping economics in the PEA stroke PFS, which we're gonna be producing probably through midway through next year. There'll be a lot more detail on that there. Okay. What have we got here? Again, we've already given quite a bit of detail on that. Okay.
46:57 Can you clarify financial plan if we're getting Bed Bus into production, and how are those funds gonna be raised? Well, things are gonna change between now and whenever we're gonna be needing monies to raise for Bed Bus. If it is toll treatment, the funds won't be that that significant. Obviously, the plant will will will involve more money. But, again, it's not... These are off the shelf...
47:18 It's a plant that that Brad's talking about. And how are we gonna do the funding? Well, we'll see. There are all sorts of options out there. We've spoken to the big companies like Glink or Trafigura. They're very keen to to help us, so that could be one way, free sort of free production loan there. We could do it straight for equity depending on where our share price is and and how the markets are, where the gold price is. Put some variables that will influence exactly how we how we do the funding, but we don't anticipate funding for something of the size of Pep Bus is is gonna be a problem. In fact, we think it's it's a positive. People are building these big... Want want high grade. They want low low CapEx, and we think that's what we have in PET bus. Something has changed. So I I didn't I didn't wanna go off on some some macro tangent. But, yeah, if if you follow the the gold mining market, there's some stats put out the other day by the World Gold Council.
48:11 The the the median all in sustaining cost now for the industry is is touching $2,000 an ounce, which when I was a young boy, was unheard of. So partly, that's that's that's inflicted because a higher gold price mean you can feed through lower grade materials. But mostly it's just costs have gone up. You know, people feel... Everything's gone up. So that's that's to me is terrifying cost, but that's only half of the cost. The other the other cost is what we refer to as the the capital intensity, which is the the capital cost to build an ounce of productive capacity. And that's now, depending upon who you ask, is also about 2,000 ounce. So what that means is that building a gold mine now is just getting bloody difficult, very expensive, and very, very hard setting aside technical issues.
48:58 Getting the funding is probably now the biggest barrier that most companies face. And I made this comment on previous webinars and things that if you look through the market, probably less so in The UK, but probably more in Canada with the more often, there's no lack of projects that are one, 2,000,000 ounces, one or two crap look great on paper if they're in production now. But they've been there for years, and the question, well, who's gonna pay to build these damn things? If you're if you're a company sitting on a market cap of $50,000,000 and you've got a project that's gonna cost you $300,000,000 to build, there's a big funding issue. Most banks have now walked away from funding mining projects because all they're seeing is, you know, the the gold price is is variable, but costs are going up. And that... They're they're never gonna come down.
49:45 That's just the that's just the the law of inflation. And on paper then, and particularly when you add the fact that it will take years to build, everything is everything is seven. I think at the moment, we're looking at any any new substantial scale mine, be it toll or anything else, is now fifteen years from from discovery to production, and that's been generous. So it's just become a very, very unattractive space
50:07 for for those who would historically have funded mining projects. And that's triggered this recognition that either... You're either gonna be one or two things. You're either gonna be the the absolute monster no brainer tier one deposit, Guaya Barlas being an example, or your Pepas. Small, fast, nimble, high grade, very low cost, get into production, pays back in blink of an eye. So it's it's it's the problem middle children that are the issue, and we've been very fortunate with PEPAS that it is what it is and it is where it is. That, you know, that thickness, that grade, being at surface, being in the road just means that, you know, I can't give you some... The numbers of what it will cost. We have some numbers, but that's... We'll come out with PFS.
50:51 It's, you know, it's it's down the bottom of the of the cost curve, both capital and operating. So that's appealing to us, which means that when it comes time to fund, the options are going to be available because it is something that is just a much, much shorter time frame than is traditionally the case for the bigger operation. So we're quite... You know, we are quite comfortable, and certainly, there's there's been a few people who always said, look. Give us a call when you're ready. That doesn't mean anything, but it's it's very positive. Thanks, Brad. There's a question on budget's expected expenditure for the forthcoming program. We raised... Well, at the time that we did the Canadian 60,000,000 raise, we set out there what the... Where the money is gonna be spent. And most of those, Frank, is gonna go obviously into the ground and on direct expenditure in Colombia.
51:36 In there, we were planning for around 18,000 meters of drilling, and that'll be spread across these programs that that France have been through already. But the vast majority of it is obviously going into into Colombia and not much currently for Argentina. Yeah. A drill rig in a drill rig in Colombia where we are, each rig throws off about 6,000 meters a year. We wanna push a bit higher, but the bigger rigs can do more. They're just more powerful. And sadly, the cost of drilling has gone up. Although that's that's mostly a part of the the appreciation
52:10 of the Colombian peso. So we're looking at, you know, three... Probably about... It's a bit 2... Between $2,500,000 per year per rig. So 18,000 meters at, you know, that sort of $67,000,000 a year is what what it costs to feed to feed three rigs. Okay. I think that's it on my one. What should we go to see? We're just gonna have a look to see which calls have... Which questions have been coming in whilst we've been speaking. So... Oh, yeah. There are some questions about our major shareholders institutionally, and we we don't comment. I mean, any shareholder has a right to buy ourselves as they as they wish. So, you know, we we we do have some very reliable, very supportive shareholders, and we're quite we're quite grateful for that. And and in relation to that, I mean, one of the strengths of this share that we have is it's a very liquid very liquid share. Lots of trading every day, so that's a strength, but also sometimes it's a weakness because when people do have to sell, perhaps they sell this rather than Right. Something else. Right. Couple of technical questions.
53:10 The geological model for PEPAS is proving difficult. It is. The challenge of PEPAS and the opportunity is that it's been a... It's a small part of a bigger system that's been faulted up and moved to surface. Now the difficulty is it could have been moved a long way because we're in a... Know, we're in an active tectonic environment. It could have moved a kilometer. Now that's okay if you're able to identify in those faults some sense of movement, but we can't because those fault are just so cooked up. They're just pure clay. Any kind of kinematic indicators have been destroyed. So the challenge is, well, it could have come a long way up, down, sideways. Is that something you want to chase? And the answer is, well, yes, but we'd rather chase the shallow stuff first. So value for money, we're better off chasing repetitions of their best at surface rather than trying to find the deeper deeper source. So that will come. But at the moment, we think there's a a far better bang for buck for looking at the, you know, more of the same thing.
54:09 PEPAS is different. Oh, sorry. Cedro is different.
54:12 And the question... There's a few couple of questions there about about assays and various things. The thing with these porphyry systems, and we see this example at Mamato, we see it at Quebradona, we see it at at Guaraboas, they're not big. They might be only a couple of meters across on the site, but they go down to the bowels of the earth. I think collective mining is now drilling holes 1.5 kilometers. Now that's pretty brave of them, but the question for us is, well, that's encouraging and that these things have massive depth potential, but how do you get to the point where you're gonna have the the the balls to drill a hole that deep? The answer is you don't. You go down piece by piece. And the key, I think, and we've done this exercise, is to go back and look at the beginning of the Guayabalas program, and they began to drill in '21 just after IPO.
55:01 And they started like us at surface and
55:03 got a good hole, and they just slowly over time began to recognize, you know, what the controls were. It took them probably six or seven holes to get a bit of a sense of of of what was controlling stuff, and they just slowly went down incrementally over time. So they are where they are today, but it took them... It's taken them five years of really solid drilling, which is, you know, great for them a lot of money. And I think I think, again, I've done the numbers, and I think they've raised since IPO over 300,000,000 Canadian dollars. So we've got a bit of catching up to do. But... So what that means for El Cedro, each porphyry is a bit different. And I said it's it's it's not the porphyry itself, it's what the porphyry then creates. The porphyry exploits a zone of weakness, and that that zone is then exploited over and over again with reactivation, with faulting open spaces, more pulses, and then alteration of the surrounding rocks.
55:56 And what we've seen with the SED one SED one was intentionally designed not to test the porphyry, to test some of the flanking structures, and we were very encouraged to find what was under 61 meters at point nine seven from surface, which is a... You know, again, would you rather have mineralization at surface or a thousand meters down? That's a simple question to answer. So highly encouraging, but the hole began to drill away from the porphyry. We're seeing less alteration, less mineralization, less less structural complexity, so... Which is why it was stopped, and now we're drilling back toward the porphyry. The keys for us are going to be... And we look at these other projects, so what what controls these big chunks of high grade? Ultimately, it's, in most cases, it's deprecation.
56:42 Is it... These... This... Yeah. A breccia... Again, Gealdi, breccia is a texture, not a rock. So breccia means a rock with angular fragments within a a finer grain matrix that's been created by grinding up, blowing apart, you know, whatever. So it's a... It's... An event has happened, either structural opening or explosive intrusions that's created a breccia. Breccia has space into which then flows the fluids. So we're looking for brecciation or these opening up spaces within these porphyries. We saw that almost immediately with petrol set one. We were seeing breccia's, but we were marginal to the porphyry. Now we're doing back into it, and even the first hole... The hole we're doing now, we're seeing brecciation right at the beginning. So we, you know, we we think it's a a lovely system, but we've only really so far just scratched the the margin of the system.
57:34 And what we will find... Well, you know, I'm not gonna offer promises because it's... You know, we can't guarantee drilling, but it looks to be a nice complex system, multi phases of intrusion, multi phases of reactivation structurally. We're seeing gratiation, but we've drilled now down to a vertical depth of now about two millimeters. So we literally have to be on the stretch of surface. There was a question on Orga because we did mention that back in August. So Orga Pepas. So we've done some Orga drilling at Pepas West. That looks interesting. The the question being, I guess, this this also goes back to a different question is that we are quite comfortable now with what it is and roughly how big it is. We can't go to resource. Now that the reason we can't go to resource is that to do a new mineral sort estimate as by the Canadian stock exchange standards would then require us to write a whole new report. You know, the Canadians in infinite wisdom do it this way.
58:34 If I was in The UK or Australia just alone, you just do a new report on on the resource. But in Canada, that requires a full new forty one zero one report for the whole project. So you you suddenly get smacked with a bill of a $100,000 to update your resource. So that's just the realities of the situation here. So we we know what it is. We'll tuck it aside and leave it there and look for more of them. So it's it's just a question of the compliance the compliance cost of moving that to a resource is just, in my mind, just not worth the effort unless it was something, you know, really material different to the project. So equal is, but we're just constrained by the by the compliance. Mentioned socialization for PEPAS. So mentioned socialization for PEPAS, which we have to do for the environmental impact study. We're gonna be commencing that in in December.
59:26 The a and m public hearings at the end of August, how far were the concessions covered, and how do you feel? This is the new licenses. Yeah. So that that that... That's a different base. So the a and m public audiences are not part of our program. Those are programs when you're converting an application to a license. So that... That's a separate base where a few times a year, the a and m will come out to the region, and they will... There will be a range of applications with different companies that have been converted, and they present to the communities. That's been done. We had our conversion done in the last year, and that's an ongoing process. Socialization is more us and them. It's more direct. The aim is not involved. We run those programs. There are guidelines. There are things we need to cover, but it's more a question of us just presenting to the community, you know, what the issues are going to be so that they know what the impact's going to be. As I said, Pepas, no one lives here. People are near enough that they will need to deal with noise issues and and moving trucks, but we're not relocating anybody.
1:00:23 There's no issues of, you know, digging up farms or or moving agriculture. It's at as low impact as we could possibly get. So that's encouraging, but the process remains the process. But the... In relation to those public hearings you you mentioned in the questions, we did have those. We were successful. We have been granted these new licenses, so the applications were turned into licenses. Three more new ones, substantial ones, which are ones I mentioned in my chat just before this this session. And and indeed, we're gonna go into the first of those licenses that have just been converted in in quarter one, and Brent covered that off as a new area of where we think we may be yet another porphyry. So we will be looking at that that new license in in the beginning of next year.
1:01:09 So we got There's some questions about multi elements at El Cedro. Yes. We've... As as as probably as commonly known, we assay, you know, sort of multiphase approach. There are fire assay laboratories in MINING IN. There's two now. We've always used one. Fire assay can just do one element per assay, or they can be gold or they can do copper, but it's at about at about $10 a sample, can't go crazy. To do the multi element, say, the full 30 element sweep, you require a different process, ICPMS, which is not yet available in Colombia. So that one that goes to Peru or it goes to, in our case, to Canada. So we we do things at various stages. We get the assays, far assays back in in days, and that's good for us. And this this, again, harks back to the El situation that we can... Any any deep hole is that we're getting assays back as the hole progresses so we can make decisions to adjust to go further to to cut back.
1:02:04 The copper at El Cedro, anomalous, but not sufficiently anomalous to to warrant announcing. You know, it's a couple 100 PPM, which is interesting. Again, we feel that we're getting away from the from the from the from the porphyry. Those marginal vein systems, they are by definition going to be gold dominant. That's that's the gold will move further out. The copper we sense will be back closer into the to the core. So, again, the the reason for the for the second hole or the plan always was to to swing the rig around and build back to all the porphyry. We, you we do hope and expect that we'll see some more enhanced base metals in there. I think I'd say I think we're gonna be running out of time. We're up to the hour mark right now. Do we think the company undervalued? Well, there's a there's a there's a silly question. Yes. Down to the market. Down to the market.
1:02:50 We had this we had this debate yesterday that, you know, you strip out our cash, and we're valued at $50,000,000. You know, would someone tomorrow pay $50,000,000 for Pepas?
1:03:00 I think they'd bite your arm off in in the instant. So, you know, we are... You know, I'd like to think we we are basically bare bones. That's per pass undeveloped. So the rest is I think we'll call it a day there if you've got. That's Alright, everybody. Perfect. Thank you very much. Thanks for thanks for attending, everybody. Really appreciate it. And we will have more of these more regularly during the year because I think it's good to have this question and answer session.
1:03:25 Amazing. Thank you guys very much indeed for updating investors today. Could I please ask investors not to close this session as you now be automatically redirected to provide a feedback which will help the company better understand your views and expectations. On behalf of the management team, we would like to thank you for attending today's presentation, and good afternoon to you all.