Azad Engineering (NSE:AZAD) Q2 2027 earnings call, held 2026-11-07. Watch the replay and read the transcript on 6ix.

Sat, November 7, 2026 at 3:38 AMendedReplay
Azad Engineering (NSE:AZAD) Q2 2027 Earnings Call
Company
Azad Engineering Limited (NSE:AZAD)
Period
Q2 2027 earnings call
Date
Sat, Nov 7, 2026, 3:38 AM ET
Replay
Watch the replay on this page · 1 h 1 min

On 6ix: 6ix.com/event/azad-engineering-limited-azad-q2-2027-earnings-call

Replay

Transcript

Automated transcript · Written by software from the replay's audio. It can mishear names and figures; the replay is the record.

0:00 Ladies and gentlemen, good day, and welcome to the Azad Engineering Limited q two FY twenty seven earnings conference call. Before we begin, a brief disclaimer. This conference call may contain forward looking statements about the company, which are based on beliefs, opinions, and expectations of the company as on date of this call. These statements are not guarantee of future performance and involve risks and uncertainties that are difficult to predict.

0:28 As a reminder, all participants' line will be in listen only mode, and there will be an opportunity for you to ask questions after the presentation concludes. Please note that this conference is being recorded. I now hand the conference over to mister Rakesh Chopdar, chairman and chief executive officer from Azad Engineering. Thank you, and over to you, sir. Thank you, team SGA. Good afternoon, everyone, and a very warm welcome to Azad Engineering's earning conference call for the second quarter and first half of fiscal year twenty twenty seven.

1:17 On behalf of the Board and the entire team, Azad, my warm wishes to you and your family for Diwali and the festive season. Joining me today are Mr. Vishnuwarpani, our Full Time Director Mr. Ronak Jaju, our CFO and our Investor Relationship Advisors from Strategic Growth Advisors. Our standalone and consolidated results along with our latest investor presentation have been uploaded to the stock exchanges and our website. In August, I began by saying that we are living through a synchronized high growth cycle across energy and oil and gas, aerospace and defense. And that these are structural multi ticket shifts, not short term spikes.

2:09 Three months on every single retract has strengthened. In our segment, engine makers continues to raise output and precision rotating parts remain one of the tightest links in the supply chains. In defense, India's push for self reliance in engines is moving from intent to programs and our capability in complete different assemblies is opening long cycle domestic and international opportunities. So the backdrop I described in August is intact and stronger. For Azad, the question is not demand, it's how quickly we convert capacity into revenue.

2:56 And that is a key message for this quarter. The foundation is now complete. H1 FY twenty twenty seven was another period of steady progress for Azad. Our capital deployment plans have stayed on schedule. In September, we inaugurated two new dedicated lean manufacturing facilities for GE Van Nuva. All six customer dedicated facilities are now commissioned. 44,800 square meters for four global OEMs, namely Mitsubishi Heavy Industries, GE VanOver, Siemens Energy and Baker Hughes. We are also in discussions with our aerospace customers about following a similar model as we have done for our energy customers.

3:46 In August, I told you that 80% of our foundational initiatives have stabilized. Today, I can tell you that the full foundation needed to convert capacity into revenue is in place.

4:03 Talking on the capital deployed, our treasury funds have now gone into CapEx and the infrastructure and plants that we have commissioned. Teams in place, we have hired the skilled manpower needed to the run installed capacity, which we have installed recently. Production readiness, we have built up enough raw material, tooling and consumables to keep every facility production ready. Customer qualifications, we are running multiple delta qualifications at our new facilities with various customers at the same time. This setup phase is mandatory in our business.

4:51 With it complete, our capacity is now ready to deliver the throughput. On the Q2 and H1 FY twenty twenty seven financial snapshot, our operation performance remains in line with our guidance. In Q2 FY twenty twenty seven, we delivered our highest ever quarterly revenue of crores, which is up by 31.6% year on year and about 10% over the first quarter. EBITDA grew faster by 37.1, which is to INR70.4 crores and EBITDA margin expanded to 37.5% from 36% a year ago. Profit tax was INR30.8 crores, a margin of 16.4%.

5:42 For the first half, revenue grew 29.3% to INR358 crores, Ahead of our 25% guidance, EBITDA grew 34.7% to INR134.5 crores at a 37.5% margin and profit tax grew 6.6% to INR67.2 crores. On a consolidated basis, H1 revenue was INR363.5 crores, EBITDA stood at INR136.6 crores and a part of INR66.1 crores. Growth was balanced across segments. Energy, Oil and Gas grew 28.5% to INR290 crores or 81% of revenue. Aerospace and Defense grew 28.3% to INR60.4 crores, a 17% of revenue.

6:33 Domestic revenues grew more than 2.5 times to INR43 crores and is now 12% of our business, up from 6% helped by our organization work with BHU. Let me speak mainly about the profit after tax, because I know it matters to you all. This quarter's fact reflects the expected lag between investment and revenue. Treasury income fell from INR12.7 crores to INR4.7 crores as our IPO and QIP funds went into the plants. Depreciation doubled to INR21.8 crores as the new facilities were capitalized.

7:22 Finance cost rose to INR12.2 crores on the working capital loans that support our growth. And we have hired ahead, so employees cost are INR50.3 crores against INR32.5 crores a year ago. All of these costs we carried before the revenue from the new capacity flows through fully. That phase is now largely behind us.

7:52 Orders and milestones. DHL approved as a long term source with a two years rate contract worth about INR52.6 crores for their gas turbine efforts. This depends our domestic energy business. Baker Hughes, our supply agreement with Mopinoni has extended up to 2030. Oil and gas, the ramp up of our dedicated oil and gas facility tied to the customers' delivery plans adds a further growth lever from Q4 FY twenty twenty seven. Defense, after delivering India's first indigenous expendable turbojet engine to GTRE, We are now positioned for end to end manufacture assembly integration of complete engine assemblies of the demands.

8:43 The testings are ongoing.

8:48 Customer recognition this year, Vega News presented us its growth collaboration award and Jeeva Noah for its delivery partnership award. Closing outlook. As we have said on earlier calls, throughput from the new capacity begins in Q3 FY twenty twenty seven. We expect revenue to ramp up Q4 FY twenty twenty seven onwards and all the plants will be fully ramped up by Q2 FY twenty twenty eight. Our current installed capacity positions us to reach an annual revenue run rate of over INR 1,300 crores by the end of FY twenty twenty eight, more than double of our FY twenty twenty six revenue. With the cost base largely in place, rising revenue should translate directly into better profitability.

9:37 And Azad, we have never changed a regular scale at the expense of our margins. Every facility we have built is anchored to customers' commitment and long term contract. We do not engage in speculative expansion. We are at inflection point and we reiterate our long term annual growth guidance of over 25% plus. I want to thank our customers, our partners and team Azad for their relentless execution and our shareholders for their continued confidence in our journey. I now hand over to our CFO, Mr. AZAD. Thank you.

10:23 Thank you, Chairman, sir, and good afternoon to everyone. I will now take you through a review of our financial performance, capital structure and operating efficiency for the second quarter and the half year ended 09/30/2026. As the Chairman has summarized, this quarter completed our set of stage. Our front end investment in capacity, people and production readiness is now in place and the numbers show our operating performance tracking our guidance even while we carry the cost of debt investment. Unless I mention otherwise, the figures are standalone and corrosive. Let me take you through the financial highlights and the top line growth first.

11:13 For the first half year, revenue grew at 29.3% to 3 and 58.3 crores, ahead of our guidance of over 25%. Our stand alone revenue from operations reached INR 187.8 crores in quarter two FY twenty twenty seven, our highest ever quarterly revenue. This is a growth of 31.6% year on year basis over INR142.7 crore in quarter two FY twenty twenty six. On a sequential basis, revenue grew 10.1% over the 170.5 crore reported in quarter one FY twenty twenty seven. Our focus as a company remain on exports.

11:58 Export contributed 88% of revenue this quarter, and we expect them to remain above 85% of our sales as we serve the world leading OEMs in energy, oil and gas and aerospace segment. Energy and Oil and Gas grew at 30.02% year on year basis to INR 152 crore and Aerospace and Defense grew at 31.6% to INR 31.7 crore. Both the segment had witnessed the growth over and above our guidance of 25% given to the market consistently over the last few quarters. Let me now take you through the gross margin to EBITDA, how operating leverage is playing a role in our business.

12:44 Let me explain our margin the way we track internally, starting from the gross margin. Our gross margin before depreciation, which is a revenue less material and all direct costs was 84.9 crores in quarter two or 45.2% of revenue. That is an extension of 150 basis points over the 43.7% of quarter two FY twenty twenty six and up from 45% in quarter one. This came from operating leverage, local sourcing, backward integration into special process to name the few of the initiatives which we have taken in the past.

13:31 We achieved it while absorbing the running cost of new facility, which are not yet billing at a full rate and the plant are at different stage of ramp up. Our indirect cost, the corporate and administrative overheads were around approximately INR 14.4 crore or 7.7% of revenue. The same share as a year ago, even though the business is a third larger. As a result, our reported EBITDA grew 37.1% year on year basis to INR 70.4 crore and 9.9% over quarter one. The EBITDA margins was 37.5%, an extension of 150 basis points, as I explained earlier, over 36% of quarter two FY 'twenty six, in line with the 37.6% in quarter one.

14:26 That is the operating leverage at work, and we are confident of meeting our long term margin guidance in the coming quarter or so. For the first half, gross margin before depreciation was 45.1%, and net 44.1% in H1 FY twenty twenty six, and indirect costs fell to 7.6% of revenue from 8.1%. EBITDA grew at 34.7% to 134.5 crore, a margin of INR 37.5 crores, unleashed at 36 crores in the same period year before. Let me now take you through the bridge from EBITDA to PAT and try to explain the PAT margins. To evaluate our core performance activity, it is important to look at the item below EBITDA.

15:20 Other income was INR 4.7 crores, only INR 12.7 crores in quarter two FY twenty twenty six and INR 4 crores in quarter one. As I mentioned in last call, treasury income is moderating as we deploy our cash reserves into factory infrastructures and machines. Interest on fixed deposit was INR 1.7 crore, only INR 6.8 crore and the foreign exchange gain was INR 2.4 crore, only INR 5.4 crore, which is a macro and not in control of the business. Depreciation was INR 21.8 crore, only INR 10.9 crore a year ago and INR 17.9 crore in quarter one as we capitalized INR $2.51 crore of new assets during the H1.

16:06 Quarter three and quarter four will carry a full quarter of two gs one over facility inaugurated in September, so depreciation step up once more before it is stabilized. Finance costs were INR 12.2 crore only INR 6.4 crore a year ago and INR 10.1 crore in quarter one, reflecting the term loan for our CapEx and the working capital loan that support our growth. EBITDA cover finance cost to the 5.8x, which is a very healthy metric from the risk perspective. Together, these three items move our PBT margin from 32.8% to 21.9%, 6.4 percentage points from the other income, four percentage from depreciation and 2% from finance costs.

16:56 None of its operational and the cost structures are now leased for our growth as Chairman has told that by FY twenty twenty eight, we will be at INR 1,300 crores. And I am quite confident that we will reach to the same margins or same cost structure percentage as it was there in FY 2024. Together, these three item move or PBT yes, sorry, net profit metrics. Profit before tax was INR 41.1 crore, tax was INR 10.3 crore and effective rate of 25%. The half year date was INR 17.2 crores because Q1 included deferred tax credit of INR 4.3 crore as a onetime adjustment from moving from old region to the new region.

17:46 Our normal rate is about 25% standalone profit after tax was INR 30.8 crore, a bad margin of 16.4 For the first half, profit grew at 6.6% to INR 67.2 crore, a margin of 18.7%. Our consolidated performance on consolidated basis, revenue from operations grew at 31.1% year on year basis to INR 190 crores. Consolidated EBITDA was 72.3 crores, a margin of 37.9% and consolidated debt of INR 30.9 crore. For half year, our consolidated revenue was INR 363.5 crore, EBITDA of 136.6 crore at 37.6% and debt of INR 66.1 crore.

18:44 Let me take you through the capital structures of the company. Our net worth is 10 lakh INR 1,619.6 crore. Bank borrowing at the end of September was INR 536.4 crore, INR 340.6 crore of term loan and INR 195.8 crore of working capital facility. With cash and bank deposit of INR 112.6 crore, net debt stood at INR 423.8 crore, that is 0.26x of equity and 1.6x of annualized EBITDA, which is a quite healthy metrics to track from the debt restructuring. Of the INR 700 crores raised through the QIC, 21.8 crore has been used and the remaining INR 78.2 crore is held in fixed deposit for balance of our CapEx.

19:34 In first half, we spent INR 139.3 crore on CapEx, funded by INR 80.8 crore of QIP money and INR 28.6 crore of term loan and internal funds. AZAD's assets, including capital working profits, now stand at INR $11.69 crore. The Chairman spoke about an annual revenue run rate of INR 1,300 crore by end of FY twenty twenty eight on this asset base. Let me now take you through the working capital and the cash flow. Inventory rose by INR 98 crores in half year to INR $4.25 crores. INR 72 crore of that increase is work in progress on the new line, including part in data qualification or ramp up stage that we can invoice only after customer approval.

20:26 This is a production readiness that Chairman described, and 72% of aggeable inventory is less than six months old. Trade receivables rose by INR 92 crores to INR $40.02 crores, in line with higher revenue. 69% of regular receivables are not yet due and

20:48 those more than a year old are only INR 7 crore. Operating profit before working capital change grew at 29% to INR 130.6 Working capital absorbed INR 157.5 crores, almost the same as INR 153 crores of last year's first half on a business of 29% larger.

21:13 After tax, operating cash flow was negative at INR 45.8 crore, a clear improvement of negative INR 76.5 crore in H1 FY twenty twenty six. As throughput converting to revenue from quarter four, the inventory turn into receivable and then into the cash. And that said, we are expecting our working capital cycle to be stabilized. Important update for you that we started our conversation with few of our OEMs to give advance initial view so that it will help us to stabilize our working capital requirement. And we are fortunate that one of the OEM has agreed to give 50% advance on this view, and we are expecting USD 4,500,000 from that particular update.

21:59 And now based on this template, we are trying to talk with all other OEMs and try to see what we can do on this particular front.

22:08 To summarize, revenue grew ahead of guidance led by export gross margin expand while overhead held steady, which lifted EBITDA margin by 150 basis points. The cost below EBITDA reflect the investment age and they are now largely in our base.

22:27 Our balance sheet remains conservative from quarter four from Q4, rising revenue on base should flow through to profit and cash. I now hand over the call to Mr. Vishnu Malpani, our Full Time Director, to take us through the operating metrics from here. Thank you, and wish you a very healthy Diwali.

22:50 Thank you, Ronak, and good afternoon, everyone. The Chairman has spoken about the macro tailwinds and the foundation that we have completed, and our CFO has taken you through the numbers. Let me give you an operational and strategic view where our build out stands, how the capacity is turning into revenue and cash, and where Azad goes next.

23:13 The ramp up that we started at the time of IPO is now at its final stage with two additional G101 gas facilities that we inaugurated in September, six customer dedicated facilities in Tuncay, Golarama now commissioned, 44,800 square meters in total for Mitsubishi Heavy Industries, GE101, Siemens Energy and Baker Hughes. GE101 now has three dedicated facilities with us. The capital has been deployed, the teams are hired and trained, and the lines are production ready. Each facility follows the same model. A customer

23:46 submits to the volume. We build to their specification and build capacity ahead of the schedule. We qualify the line to their standard. And it is important to understand that no capacity that is either deployed or commissioned is built speculatively. We build it on the basis of the guidance that we received from the customers in the form of contracts. Let me explain why revenue follows the commissioning

24:13 by a few quarters. When a part that is already qualified moves to a newer facility or a newer machine, the customer requires us to do a delta qualification. This qualification process is shorter than qualifying a newer part. A new part can take anywhere up to thirty to forty eight months, But our Delta qualification is still not as lengthy, but is a rigorous process. It goes through inspection process validation, customers own audit, and we are running several of these Delta qualifications at the same time across all our customer lines. The throughput for the business begins improving in H2 FY 'twenty seven. Revenue starts ramping up from Q4 as parts that we are qualifying, clear customer acceptance, and we expect all plants to be fully ramped up in the H1 of FY twenty twenty eight.

25:02 Each facility that we are building dedicatedly for our clients is in line with the customer's delivery plans. Once a global OEM has qualified a dedicated facility into its primary supply chain, moving that business carries away high switching cost, and this is what gives us a multiyear visibility with all of our customers across each of our segments. I know that working capital has been on our... On your minds. And so let me tell you that what is already in motion. Mister Chubdar and mister Jarju also covered briefly how the attempts that we've done and the results and the outcome of some of them. Let me take you through the three aspects from a macro perspective. Inventory is moving through the pipeline.

25:47 It is worth noting that the raw material that we've built earlier in the quarters has moved up into work in progress on the new alliance. As the ramp up continues to progress, this work in progress converts into finished products and then receivables and then into cash. So that is point number one. The second one, which Mr. Raju briefly touched upon, our attempts to reach out to our customer has now given a positive result.

26:11 One of our OEMs have agreed to give us a 50% advance against purchase orders, and we expect to receive close to about $4,500,000 under this arrangement. This reflects the strength of our customer relationships and directly funds our ramp up. Dollars 4,500,000 on a customer account is a good start for our business and is in line with the commitment that we had given to all our shareholders that we will bring working capital in check through various things. The third point that we're now doing is the bill discounting line, which are in reserve. So far as a business, we have not used bill discounting aggressively because we have surplus treasury funds. And drawing on those lines would have added finance cost further. We now have these lines in place with ICICI Bank and DB World, which can be used from Q4 FY twenty twenty seven onwards.

27:02 This will reduce our debtor days directly with a modest addition to our finance cost, which the business can take.

27:10 Our business model remains export led with more than 85% of our revenue coming out of exports. For the first half, energy and oil and gas grew significantly to twenty eight point five percent and 2 and 90.5 crores. This was supported by a strong global demand for power generation and our dedicated facilities moving through qualification. Our dedicated oil and gas facility for Bakersfield, which also added a growth lever from will also add a growth lever from Q4 FY twenty twenty seven. Our agreement with Bakersfield's company has been extended to 2030. Aerospace and defense grew at 28.3% and delivered INR 60.4 crores. This vertical now contributes to about 16.8% of our revenue.

27:55 In India, we also received a long term source contract with DHL for gas turbine blades under a two year rate contract, which was close to about INR52.68 crores, a strong start for indigenization in the power sector in the country. With the IPO build out now complete, it is now time to move to the next stage of growth for Azad. Azad has already started working on the programs that will drive our growth beyond FY 'thirteen. To name a few, we started working on hot section parts, nozzle main segments for Mitsubishi Heavy Industries under our eight year single contract. This is the next step in our complexity and our value change that we're moving up for Azad. Aeroengine airfoils with Rolls Royce and Pratt and Whitney and Safran, extending our airfoil expertise of power turbines and aircraft engines, we are now going to be starting to delivering this from the next fiscal onwards.

28:51 The developments that we did on aero engines for GTRE building on a delivery for India's first indigenous expendable turbojet engine with end to end manufacturing assembly and integration complete, Azad has demonstrated that we have the capability to manufacture engines in India and to help India's India's objective on indigenizing most of our different systems. The capability that we built for aero engines and for GTRE around aero engines is also being discussed in advanced discussion with other OEMs who want to use Azad for the capability building in this front. Along these programs, we will keep getting wallet share with our existing customers on a proven capabilities to serve newer global OEMs, look at selective acquisitions for large competence, full stack production and co locate with key OEMs.

29:43 The first stage of Azad's growth as a listed company, the build out that we started is now in its final stage. Our capacity is now ready in the next six quarters and about to convert this revenue into cash. We've already built... We've already begun building the growth engines for the decade and beyond. With that, we are happy to take your questions. Thank you very much, and happy Diwali to everyone. Thank you very much. We will now begin with the question and answer session. If you wish to ask a question, you may press star and one on your touch tone telephone. If you wish to remove yourself from the question queue, you may press star and 2. Participants are requested to use answers while asking a question. Ladies and gentlemen, we will wait for a moment while the questions may sound.

30:33 The first question is from the line of Amit Dix from Goldman Sachs. Please proceed with your question. Yeah. Hi. Congratulations for the great performance and for a good set of numbers. I have a couple of questions. The first one is essentially on the building blocks that are ready now. We have now six facilities in the new facility. So I just wanted to understand the next phase of development more. I mean, how are these contracts, particularly in aerospace going to move from development to production stage? And I wanted to understand that part, the kind of revenue growth that will accelerate from here? That is the first question, sir. Okay. Thanks for the question.

31:22 Last quarter also I had a similar question and we were telling that we are setting up things. We are the buildings were almost done. The machines were ongoing last quarter. And this is the main thing which we were trying to give a message. But now as mentioned, we are ready with that. The buildings are ready. The CapEx is deployed. Major of the machines are inside. The foundation is completed. The spindles are now running and we are seeing the throughput which we plan. Of course, we we saw some two, three weeks delay and that's that's I think quite normal to see in this large scale. But beyond that, today we can say that that we have done that

32:11 piece of what which is going to really see the revenues coming up and it has started already, right? Now we talk about the growth factors or we talk about it is visible, I think I've been very consistent in giving a guidance that what was the status of the factory. Now the machines are up and running, and this is now we see from Q3 onwards, we also have started seeing the throughput. So that's the situation right now, Mr. Amit. And if you talk about capacity wise, we you can see an ARR, the capacity which is now installed, we should see an ARR from FY twenty eight of roughly more than around INR 1,300 crores or so. So that's the capacity right now.

33:09 Mister?. Sandy are going to do bill discounting. I just wanted to understand that when we may see the peak cash burn now considering that the fixed cost is all there, it is now going to be amortized. The fixed cost base is not there. Maybe, you know, working capital will also kind of plateau from here. So just wanted to understand the the cash when will we see cash flow become more and when the free cash flow generation by the company? I believe we can see that, as I mentioned, now we are in Q3, right? So the Q3 as the throughput is now started coming out. It's not that it's going to come, it started.

34:00 And the supplies will start from the end of the Q3 and Q4. As we mentioned, we started to build discounting. We started taking things. So I think by Q3 and Q4 sorry, Q4

34:17 Q4 and is where we can see the cash throwing out of the company now. That is a period we see that coming in. And consistently, if you talk, Q1 of next year would be perfectly thing, but we can see something in Q4 as well, the cash coming out of the company.

34:33 Wonderful, sir. That's all from my side. Thank you. The next question is from the line of Gaurav Naguri from AZAD Capital Private Limited. Please proceed with your question. Thanks. Thanks for the opportunity. Sir, I want some more color on this capacity that now that you are fully commissioned with six lines. So correct me if I'm wrong, if I'm right, that the existing capacity, excluding Tunik, Boraram has a potential of about INR 500 crore odd and this new facility would have a potential of about another INR 1,200 crore, INR 1,300 crore odd revenue, which means in totality of the total CapEx or all the capacities put together, you have a potential of INR 1,800 crore, of that you are saying that you would reach INR 1,300 crores by next year itself. Is that understanding correct?

35:30 Yes. So you see the ARR, what we start seeing is INR 1,300 plus. Okay. And how we move ahead, it definitely will cross more than that, right? And we've been always conservative in giving any kind of guidance. We are very, very conservative in giving the guidance. So this is the bare minimum we have said, this will cross. Definitely, it will grow to the levels, but I don't think maybe next quarter I can update you exactly what would be the range, but what capacity we see now and what throughput we are seeing now has gone beyond 1,300 plus.

36:07 Understood. Understood. And second question is for the discussions that you're having with the GE nuclear with your aerospace clients. So given that is now fully leased out with these six clients, what about the additional contracts that you win? Would you have to buy a separate line or where those capacities would come in? No. We have left one or two you know, buildings, which is still in. We... Because as, you know, I mentioned in my call, as we are dedicating facilities for for the energy oil and gas, now aerospace also has come forward. So few of the customers, I can't name them now. And we are going in the similar model of dedicating a facility there and they want to book us for next whatever years they want to book and that's ongoing right now. So very soon we'll inform you on that and that capacity is also well taken care.

37:02 Understood. Understood. And as Vishnu mentioned that you would be start delivering the aero engine aerofoils from next year. So have you received the qualifications or you're expecting to that that to come? That's exactly mentioned. We'll give you very good news very soon. Right? So after rigorous qualification, which we completed... Almost completed. You know? 2024 is when we start. And finally, we could we could... We are in the last leg of things, and very soon you will have an information that we have delivered our first

37:34 qualification batch. And that's the start. Once that qualification batch is done, and this is how we how we really will show that, yes, the parts are now in production. Understood. And just last question... It's a very good progress. Very, very good progress and things went flawless in the qualification period. Understood. But I'm assuming that, let's say, to get the qualification, you have to incur a new CapEx for the commercial line that probably you would Sorry, plan it's already done. The CapEx is done. The production we have production ready now. All right. Okay. Got it. Got it. And just last bookkeeping questions for from Ronak. Just one on when you said that you already had a discussion with clients for the advances, Did the discussion also about, let's say, the margins because I'm assuming that clients would not be paying you the same margins and yet giving you the advances also?

38:33 No, we have not given any material discount. It's hardly 1% or so. So that is not something we have given very large discount for this advantage. And this is in line with our discussion because we are incurring CapEx and also investing into the working capital all the time. So we requested customer that why don't you support us for the working capital at least so that it keep the ball moving from both the sides. Understood. And what has caused this sharp increase in the other operating income in first half? Other operating income decrease was That I mentioned because of the treasury because we have a treasury which was we raised in q I c, which was there in the No. It's other operating in this market that I'm talking about, not other income.

39:21 Other operating income? They not decline. I don't think, Bharat, which number you are talking about. Okay. I'll I'll take it I'll take it separately, Nawad. So thanks. Thanks. Thanks for the answers, and wishing the team happy. Thank you, Bharat. Thank you, Bharat. Thanks. Thank you. The next question is from the line of Prakash Singh from ICICI Securities. Please proceed with your question. Thank you for the opportunity. Good afternoon, everyone, and happy to one to have... As well. Sir, my first question that now that we have a revenue target set for FY twenty eight and probably the growth would come from the existing facility in FY '29. Beyond that, the growth factor basically, because we haven't had any new investment plans from you

40:12 beyond FY '29, because I believe that still the... We are very little on our wallet share of the customers and there's ample growth with the existing customers as well beyond '29. So could you just give us the road path beyond '29 if you have? Good question, Vikas. So as Gaurav asked the same question on the Rolls Royce, this is an example of what we are going to talk about. So Rolls Royce, invested 2024. You know, a large portion of CapEx has gone in that. And you know the qualification cycle, without that you can't go for production mode, correct?

40:51 So now there is certain two engine programs which are going on right now and we have finished almost finished the qualification line and the production starts of these two lines. So CapEx what we have done, what was visible to us. So the visibility, the customer what it does is, say, example, it has got 10 engine or 20 engine programs, but they will not open up everything. They'll say, okay, this is what we have. These two engines we are offering you and you finish this qualification. So basis two engine, is visible, we invested the CapEx. As we deliver, confidence is up, as the qualification is true, then they open up, right?

41:29 So we will know this, as I mentioned, Gaurav as well, that I will be able to give you more color maybe next quarter, same thing I'm informing you as well. But what happens is the next phase of CapEx is once we qualify this and once we go to the next phase, then they open up like the and then we will plan our CapEx for FY 2029 onwards. So that's what we are trying to figure out and we we... As we see the growth, definitely, we'll go for a QIP or, you know, maybe when it's required. We will go in that session. But today, as we speak, what we have invested, what we have done, that has now moved up to the next phase.

42:06 Noted, sir. And, sir, just regarding this new facility which you have commissioned, especially the recent two one, had the associated order was already received and it was a part of the 6,500 crore, or there is a chances that these facilities getting booked for next five years and the order book would increase from here in next few weeks or so? So these these

42:30 contracts and requirements are rolling. Okay? And we have we have really have the visibility. We already have the contracts. We already have the visibility. But how long what beyond it is going to go? And it is, you know, we cannot say something which is a bit forward looking. No. But we definitely have a visibility on that for sure. Yeah. No, sir. Sir, just one last question if I can fit. Sure. Any update on the engine site, basically?

42:58 I am also eagerly waiting for the testings that are ongoing right now. And, you know, they are quite restrictive in giving the information out. But we are just waiting for the the the testings are ongoing that I know. Alright. We are about to deliver the second engine as well. When this engine flies on the weapon, that's that's where they're really going to open up and we are 100% sure it's going to

43:25 it's going to be a big one for sure. Right? So we just wait. We we all have to have, especially me, you know, I'm super excited for the results of the engine coming out. So once it comes out, maybe the second engine, third engine, fourth engine, whichever whichever flies the weapon, that means we have we are very close to have going in the production mode, which is very... It's not far away. Have very limited information on this. Yeah. That's great to hear, sir. Thank you, and all the best. Thank you. Thank you so much.

43:59 Thank you. The next question is from the line of Suraj Malu from Catheraman Venture Capital. Please proceed with your question. Hello, sir. Thank you for this opportunity. Sir, can you help understand, like, what is the current order backlog and across segments and what was that in the previous quarter?

44:21 So thank you for your question. So our current order book is close to about 6,500 crores. And like mister mentioned, this is a rolling order book. So so across each of the segments, today, this is our book, and there are contracts that are under discussion.

44:42 So if you look at our projections for the next... Yeah. If if you look at our projections with the 25% growth over the next few years, you will be able to see that, you know, this order book over time will... One, it will keep getting consumed from, but it's a rolling order book. Right? These are not project based demands. These are annual demands that occur across these product lines. Plus, you will also see that new parts, you know, newer contracts are added to this over time. So this is how the order book will grow.

45:12 Right. I understand. So so as you mentioned rightly, right, so these are, like, rolling order books. So as and when six months are executed, you will get for another six months, right, because these are continuously manufactured. And as and when we add, like, in your components, like, let's say, hot section and all those. So, like, do we see a step up in this order backlog somewhere?

45:31 Do you see what? I'm sorry. A step up in this order backlog, like, when we have, like, new components with a large orders into No. I see. Thousand standard can become, like, seven, eight thousand. Yeah. So, of course, that will happen, but I would like to just make a slight correction to what you said. So this is not order backlog.

45:52 This is this is a set of contracts that we're working on, So we should not look at it as an order backlog. This is based on the demand that the customer has given it to us over the next five to seven years, which is detailed by product and by customers. So we understand that. So we should not be looking at it as an order backlog. That's why if you look at our capacity build out, we're not building infinite capacity on day one. We are building capacity on the back of what we need to deliver to our customers based on the schedule. So this is not order backlog. Just wanted to bring that slide to one side. Thank you. Okay. Thank you. Thank you. Thank you. The next question is from the line of Alisha from Trust Mutual Fund. Please proceed with your question.

46:43 Hi, sir. Good afternoon, and thank you for the opportunity. Sir, ex of Rolls Royce, how many customers are we currently in Delta qualification with?

46:54 You talk about the air engines. We have apart from Rolls Royce followed by. So these are the two ongoing behind behind Rolls Royce. And on the oil and gas side or the energy side, we are we are done with all kinds of qualifications. Right? There's no Delta qualification pending there. Delta is going on. Major qualifications are almost done. Right?

47:23 Delta is ongoing right now. What is Delta? Example, I'll tell you. With the existing... We have a facility which we have qualified maybe, say, three years before or four years before. The moment you shift to a new facility, when you move the machines, the location, because in their system qualification says, what are the parts, what are the machines, what is the location of the facility. That is recorded. Once you change it, they have to update it. This is that there are this is not a full qualification. It is mandatory that they validate what the machine has moved properly. The processes are the same what we qualified here and the parts are coming out well. So the delta is... The per delta qualification is defined in that way. It's not a full qualification.

48:09 It's a it's a... It's as good as a revalidation.

48:14 That I understand. We're just trying to understand how many of our customers are are we still in that phase with, hence the question, but I get what you're saying. Yeah. The next question was that you... As now we're moving... We're finalizing these data qualifications and, you know, you've given us the AIR roadmap of 1,300 crores plus. What will the contribution be from the aero side, or will it still be oil and gas energy heavy?

48:42 It it will be mix. It will be mix. And we see this, as I mentioned, once the Gold Coast qualification is done and the revenue will just add up, we don't have any revenue with the Gold Coast. We have revenue, but it's not for the production revenue. That's going to start. Then followed by product, followed by Safran. So this is something that it will keep on growing. But for your information by FY thirty, thirty one, energy and oil and gas will be almost to a range

49:12 where the energy will come down to say 55%, 60% and the rest the growth will be I'm sorry, I mean not come down. The energy contribution will be 5560% and that will be taken by the A and D.

49:26 Understood. But some of this revenue will start seeing flow through from FY '28? Yes. Yes. Yes. And just to add to what Mr. Chubbhar is saying, see, our plan for the next five years, so... Is based on... So so there is a revenue visibility that we have on the parts that are qualified with our existing customers and are ramping up. So that will take care of the revenue projections that we have for the next five years. While at the same time, we are also adding capabilities and qualifying newer products, which will keep getting added which will keep getting added, like the roles with qualifications that we're doing, etcetera, and the other qualifications. Qualification is qualification is a continuous process in this industry.

50:11 Like, you would know that we are today catering to under 2% of the wallet share of our customers. So for us to be able to cater to a large market, we will have to continue the process of qualification. What changes in the business is that the quantum of qualification versus production will now largely shift. So if you were to look at energy business, say, let's say, seven, eight years ago, you will see that we were still doing a lot of qualifications. But today, you'll see that it is largely production and a little bit of qualifications going on. Aerospace five years ago would have seen a lot of qualifications. But last year, we delivered INR100 crores. So this is the process that continues. Yes. Over to Mr. Tukhat. So just explain I just explained to Gaurav I mean, his last key question, like what are the production cycles for the Rolls Royce. As we mentioned, we were given only two engines, but Rolls Royce has many engines, right?

51:00 And once these two engine look is the qualifications are done, these two engine comes in production and rest of the engines will go into qualification. So this will be a continuous process. Same thing with Pratt and Whitney, same thing with SAFTA. So that's why we say that massive growth, which we are going to see is this is how we have laid the foundation. It's now ready. And now we will definitely see the revenues coming from the qualifications part done and then qualifications also keep adding to it. So it's a continuous process is what I mean to say.

51:34 Understood. Understood. And just one last question on the energy and oil and gas side. We're not seeing any slowdown from our customers, right? Based on the visibility that they've shared, is that slowing down or is that getting slightly more delayed or pushed out? No. No. No. No. That... It it it will never happen for us for sure because Azad is is now... You know, when we started 2010, 2010, 2012, 2013, 2014, whatever years which we were doing qualifications and we were doing production. And the way the projections were shown to us, it was all it is all been intact. And as we said, wallet share per customer is less is a single digit right now. We have a long journey to go ahead to pick up the two digit number or whatever. We see a massive growth coming from the existing customer base without adding you talk about this AI stuff and all this coming up, which did affect us before and it doesn't affect now also. We have not come to that level. We are in our regular business mode where we are going with that inception where we started with single digit to reaching to two digit wallet share.

52:47 So we don't see anything affecting us or anywhere in kind of the growth factor what we have calculated for next five years. Understood. Great. All the best, sir, and thank you. Thanks a lot. Thank you. The next question is from the line of from Ambit Capital. Please proceed with your question. Yeah. Hello, sir. Thank you so much for giving some visibility beyond FY thirty as well. You know, I I wanted to ask you about how you see your factors of production in this regard. So a few quarters ago, you spoke about hiring, you know, seeking around 150,200 people per month. So as you ramp

53:35 up your sales to 2,003 thousand crores of revenue, how do you see, you know, labor being added to your roles? And do you look at more automation in that regard? And how do you see turnover change because of this? If you can provide some color on this. Yes. So this is a classic example. Thanks for the question. This is a classic life thing, which is going if you notice our manpower cost has gone high, right? Regarding this manpower is like we have installed the capacity, right? We the capital from treasury moved to the CapEx. CapEx is was in transit received at the factory installed. Now after having as we are in a very, very sophisticated business, right, and it's not some casual

54:27 manpower between we need highly skilled manpower. So the reason the spike of cost in the manpower is just because the capacity which is there is manpower is higher. And we are not seeing revenue today. As I mentioned, it just started, the spindles just started, but you don't get them ready made today. So we had a plan to go back a month or two before and we started hiring and we start preparing ourselves to have this manpower and now the revenue starts. And next quarter or following quarter of that, you will see manpower costs going down because the revenue will attribute to that. Similarly, this cycle, we would carry on of seeing in four to six quarters, you will see one quarter that manpower going high and then again coming down. So this will be a continuous process going ahead a way we have to plan in advance every aspect. Doesn't matter if we are at INR800 crores revenue or a INR3000 crores revenue.

55:23 Okay. So you're saying that labor will scale linearly with the sales growth, but it will be front loaded? Yes. So you will see next to next quarter, you will see a drastic downfall in the manpower costs because that cost we are attributing now, and that will compensate it with the revenue which is going to do as a throughput. Right. Now my question was whether once you reach a scale of INR 2,000 crores, 3,000 crores, if it's still tenable to like look for... Because at that time, maybe you'll be looking at thousand people in a month. So if that will still be tenable or you will look for more automation. Okay. So so... Yeah. Yeah. Okay. So now what

56:02 what we are doing is we are we are adopting lean manufacturing system. Right? We are definitely we have a target to depend more on automations and a bit of the ERP systems, the new tools we are using to attribute to see that the dependency on the manpower is going to the lower side. That's the target we're already working on. Okay. Great. Sir, my question is about the aftermarket. So as I understand, the OEMs make most of their profit on, you know, the MRO aftermarket and spares. So if you can provide some color on what is the replacement cycle for, you know, aerofoils and veins and whether today your parts reach the aftermarket either directly or indirectly?

56:54 I understand that Azad, the supplier may still have fixed pricing, whether it is new build or aftermarket will give visibility in terms of repeat revenue. So if you can provide some info on that. Sure. The OEM, when they place an order on us, they they are a part which we will not know whether these OEMs are buying these parts for the aftermarket sales or for the new build. So we will not know about it. We will not know whether this part is being utilized in aftermarket or it is utilized in the newbuilds and we will not know about that on the aftermarket vein. So but any idea on the replacement cycle, like if you provide that? Okay. Yes. So usually,

57:42 on a gas turbine between ten to twelve years, they have to be replaced. And in steam, in the thermal other areas, it it touches around sixteen to eighteen years. Okay. And is this similar across both hot and cold section? Like, if you are making hot section I'm talking only about the cold. I'm talking only about the cold. And and the hot section is just started. You know, we just started with Mitsubishi. That's a big story going to happen in the hot section, right? So we are still in the cold section, but hot section is a different

58:21 very different to cold section. That itself is something which we really like the volumes are super heavy and the cycles are differently looked after that. So the hot section parts, I really don't have a proper answer for you right now. But maybe as we progress with the with the current qualification, maybe in next few quarters, I can answer you on that. Okay. Great. Sir, lastly, after FY 30, as you ramp up on your six 100... 6,500 backlog or whatever is the run rate that you are seeing, do you expect to seek more land?

59:06 Because would... What what do you have including the land that you have, would that get exhausted? Like, how are you thinking to plan for land beyond FY thirty? See, I'll tell you, this growth, what we are seeing now, we could see this, we could project this way back in 2022, 'twenty three, right? 'twenty one, 'twenty two is where we saw what's coming out. So the Phase I of Tumtiv Balaram, which is now fully done, right? It is covered, not and similarly, we would also foresee that you will need more land beyond this. So the Mungum Bay is already for the Phase two. So that is also covered, very well covered.

59:52 So once we are done with this, definitely, we have a plan for that plan, and we are going to start up there. Okay. Great. Thank you, sir, for answering questions. I'll come back in the queue. Welcome. Thank you. Ladies and gentlemen, due to interest of time, that was the last question for today. I would now like to like to hand over the conference to management for their closing comments. Thank you so much for giving us an opportunity to run you through our company's operational and financial performance for the for the quarter and half year that ended FY 2027. We hope that everybody has sought answers and clarifications on how we would be building the organization over the next few quarters and the year.

1:00:45 We wish everyone a very happy Diwali and festive season. Thank you. Thank you. On behalf of Azad Engineering Limited, that concludes this conference. Thank you for joining us, and you may now disconnect your lines. Thank you.

Follow Azad Engineering Limited into a list and get an email when it puts out news.

Latest news releases

Companies on this call

Speakers

Rakesh Chopdar

chairman and chief executive officer at Azad Engineering

Ronak Jaju

CFO at Azad Engineering