Shuka Minerals Plc · LSE:SKA
Shuka Minerals — Edenville Energy — Investor Presentation (May 2018)
14 slides from Shuka Minerals's investor presentation, May 2018
Slide 1: Edenville Energy plc Company Presentation
June 2016 Edenville Energy plc Company Presentation May 2018 Ticker:EDL www.edenville-energy.com
Slide 2: Disclaimer
The information contained in these slides and this presentation is being supplied to you by Edenville Energy plc (the "Company”) solely for your information and may not be reproduced or redistributed in whole or in part to any other person. This document has not been approved by a person authorised
Slide 3: Investment case
Investment case KEY FACTS ¡Edenville Energy (“Edenville” or the “Company”) owns a 90% interest in the 170mt Rukwa Thermal Coal Mine, located in Tanzania. ¡The Company is using a dual approach strategy to extract the most value from the project by combining near-term cash flow generation from small-s
Slide 4: Corporate Information
Corporate Information [to be updated] Company Capitalisation Share Price Performance Shares in Issue 1,547,746,370 Warrants and Options 293,678,147 Fully Diluted 1,841,424,517 12 month share price range 0.35 – 0.84p Share Price (04/05/2018) 0.37p Market Capitalisation £5.7M Source: Yahoo Board and M
Slide 5: Board and Management Team
Board and Management Team Jeffrey Malaihollo, Non-Executive Chairman – Over 23 experience in varied roles within resources and finance. A PhD in geology having worked for Newcrest Mining and Rio Tinto. A mining analyst with Loeb Aron, a corporate finance firm in London, followed by several years of
Slide 6: Small Scale Mining
Small Scale Mining ¡ Construction completed. Mining and washing operations underway. Commercial sales made. ¡ Thermal power plant quality coal – Typical washed values 5,800kcal, Ash 20%, Moisture 5%-9%. ¡ Tanzanian Government directive to ban or restrict coal imports provides market opportunities. ¡
Slide 7: Excellent Infrastructure
Excellent Infrastructure The mine is located in a strong position in western Tanzania for transportation and logistics ______ Excellent road network north and south of the project Multiple access to Zambia going south (140/240km) ______ Lake Tanganyika (140km) provides barging options to take coal n
Slide 8: Fully Operational Mine
Fully Operational Mine Top: A Crushed Coal Stockpile Top: Mining Coal Top: Washed Coal Stockpile Bottom: Mining Upper Seam Coal Bottom: Wash Plant Source: Edenville Energy 8 www.edenville-energy.com
Slide 9: Advancing Coal-to-Power Project
Advancing Coal-to-Power Project ¡ Edenville has been formally asked to move forward plans on a coal fired thermal power project in the Sumbawanga area by the Ministry of Energy and Minerals (MEM). ¡ Edenville Project Concept Study has been accepted and approved by Tanesco. ¡ Rukwa Power Project is p
Slide 10: Regional Power Landscape
Regional Power Landscape ¡ Planned New 400KV transmission line linking north- south within 7km of Rukwa. Tanesco Planned National Grid System ¡ Part of “East Africa Power Pool” development plan, which will see a total of 2,302km under construction between Kenya, Tanzania and Zambia (ZTK Project). ¡
Slide 11: Edenville Energy plc
Edenville Energy plc Company Address: Nominated Adviser & Broker: Financial PR: Aston House Northland Capital Partners Limited IFC Advisory Cornwall Avenue info@northlandcp.co.uk www.investor-focus.co.uk London www.northlandcp.co.uk N3 1LF info@edenville-energy.com www.edenville-energy.com www.edenv
Slide 12: Appendix – Coal-to-Power Project
Appendix 1 – Coal-to-Power Project ¡ The Company’s core asset is the Rukwa Coal-to-Power Project, located in western Tanzania, ~25km by road to the north-east of the major commercial centre of Sumbawanga. ¡ The Rukwa Coalfields are comprised of the Mkomolo, Namwele and Muze deposits – historical sma
Slide 13: Appendix – Resource Estimate
Appendix 2 – Resource Estimate The JORC Compliant Mineral Resource Estimate completed in 2013 from Independent Consultants SMS outlined 173 Million Tonnes of which 61.5 Million Tonnes are in the Measured Category Deposit Classification Tonnes Measured 36,958,091 Mkomolo Indicated 93,414,982 Inferred
Slide 14: Appendix – Tanzanian Statistics
Appendix 3 – Tanzanian Statistics Power & Electricity Overview Country Statistics Tanzania has total installed electricity capacity of around 1,500MW Population: 47.2m Presently, only 45% of urban areas are electrified and this falls to 2014 per capita GDP: US$912.7 below 5% for rural areas. Literac