  1. Slide 1: Edenville Energy plc Investor Presentation August 2016

    June 2016 Edenville Energy plc Investor Presentation August 2016 AIM code:EDL www.edenville-energy.com

  2. Slide 2: Corporate Information

    Corporate Information KEY FACTS  Edenville Energy plc is a natural resources company focused on advancing the development of a Coal to Power project in Western Tanzania  Edenville Energy plc is approximately 6 years old and listed on the AIM Market of the London Stock Exchange  It is at pre-devel

  3. Slide 3: Key Points

    Key Points MINING PROJECT AT ADVANCED STAGE  Asset quality and scale – 173 million tonnes JORC resource + exploration upside – Thermal power plant quality coal  Mining Environmental Impact Assessment Certificate granted  Mining Licence Granted over Mkomolo – rapid application process took 7 month

  4. Slide 4: Rukwa Coal to Power Project – Rukwa Region - Tanzania

    Rukwa Coal to Power Project – Rukwa Region - Tanzania 4 www.edenville-energy.com

  5. Slide 5: Regional Power Landscape

    Regional Power Landscape  Planned New 400KV transmission line linking north- south within 7km of Rukwa Tanesco Planned National Grid System  Part of “East Africa Power Pool” development plan, which will see a total of 2,302km under construction between Kenya, Tanzania and Zambia (ZTK Project)  Co

  6. Slide 6: Rukwa Coal to Power Project

    Rukwa Coal to Power Project  The Company’s core asset is the Rukwa Coal to Power Project, located in western Tanzania, ~25km by road to the north-east of the Typical Section through North Mkomolo major commercial centre of Sumbawanga.  The Rukwa Coalfields are comprised of the Mkomolo, Namwele and

  7. Slide 7: Sumbawanga and Site Area

    Sumbawanga and Site Area Sumbawanga – Regional Centre Top: Old Namwele Pit Bottom: Upgrading access to the coal deposit Top: New +200km Road Connection Bottom: Namwele Pit Workings 7 www.edenville-energy.com

  8. Slide 8: Resource Statement – Rukwa

    Resource Statement – Rukwa The JORC Compliant Resource Statement completed in 2013 from Independent Consultants SMS outlined 173 Million Tonnes of which 61.5 Million Tonnes are in the Measured Category Deposit Classification Tonnes Measured 36,958,091 Mkomolo Indicated 93,414,982 Inferred 1,923,817

  9. Slide 9: Extensive Outcropping of Coal

    Extensive Outcropping of Coal Mkomolo – Old Surface Workings Diamond Drilling at Mkomolo Mkomolo Drill Core “Bar Code” Coal measures (seams marked in red) 1 metre Overburden at Namwele Mkomolo Prospecting Pit 9 www.edenville-energy.com

  10. Slide 10: Site Development Initiated

    Site Development Initiated Top: Providing education facilities to the local community Top: Accessing extensive outcropping at Mkomolo Centre: Site visit by senior MEM and Tanesco officials Bottom & Bottom Centre: Access upgrade work Bottom: Bulk sampling at Mkomolo 10 www.edenville-energy.com

  11. Slide 11: Current Status – Mining

    Current Status MINING - The Current Status  Mining Licence and Mining Environmental Certificate in place – enables mining operations on the Mkomolo deposit which holds the majority of the Rukwa coal resource – further prospecting licence areas to be converted to mining licences as the project progr

  12. Slide 12: Current Status – Power

    Current Status POWER- The Current Status  The timing and structure of the power development at Rukwa (and elsewhere in Tanzania) is controlled by the Ministry of Energy and Minerals (MEM) and Tanesco along with other government bodies including the Energy and Water Utilities Regulatory Authority (E

  13. Slide 13: Target Timeline to Planned Development

    Target Timeline to Planned Development 13 www.edenville-energy.com

  14. Slide 14: Board and Management Team

    Board and Management Team Jeffrey Malaihollo, Non Executive Chairman (from 1 Sept 2016) – 22 + experience in varied roles within resources and finance. A Phd in Geology having worked for Newcrest Mining and Loeb Aron Financial Advisors, followed by several years of CEO / MD roles with Central China

  15. Slide 15: Appendix - Tanzania Power & Country Statistics

    Appendix 1 - Tanzania Power & Country Statistics Power & Electricity Overview Country Statistics Tanzania has total installed electricity capacity of around 1,200MW, of Population: 47.2m which around 42% is generated by power Presently, only 45% of urban areas are electrified and this falls to 2014

  16. Slide 16: Thank you

    Edenville Energy plc Thank you Company Address: Aston House Cornwall Avenue London N3 1LF info@edenville-energy.com www.edenville-energy.com

  17. Slide 17: Disclaimer

    Disclaimer This presentation ("Presentation") has been prepared by Edenville Energy plc (the "Company") and is confidential and is only directed at persons who fall within the exemptions contained in Articles 19 and 49 of the Financial Services and Markets Act 2000 (Financial Promotion) Order 2005 (