Slide 1: Edenville Energy plc Investor Presentation August 2016
June 2016 Edenville Energy plc Investor Presentation August 2016 AIM code:EDL www.edenville-energy.com
Slide 2: Corporate Information
Corporate Information KEY FACTS Edenville Energy plc is a natural resources company focused on advancing the development of a Coal to Power project in Western Tanzania Edenville Energy plc is approximately 6 years old and listed on the AIM Market of the London Stock Exchange It is at pre-devel
Slide 3: Key Points
Key Points MINING PROJECT AT ADVANCED STAGE Asset quality and scale – 173 million tonnes JORC resource + exploration upside – Thermal power plant quality coal Mining Environmental Impact Assessment Certificate granted Mining Licence Granted over Mkomolo – rapid application process took 7 month
Slide 4: Rukwa Coal to Power Project – Rukwa Region - Tanzania
Rukwa Coal to Power Project – Rukwa Region - Tanzania 4 www.edenville-energy.com
Slide 5: Regional Power Landscape
Regional Power Landscape Planned New 400KV transmission line linking north- south within 7km of Rukwa Tanesco Planned National Grid System Part of “East Africa Power Pool” development plan, which will see a total of 2,302km under construction between Kenya, Tanzania and Zambia (ZTK Project) Co
Slide 6: Rukwa Coal to Power Project
Rukwa Coal to Power Project The Company’s core asset is the Rukwa Coal to Power Project, located in western Tanzania, ~25km by road to the north-east of the Typical Section through North Mkomolo major commercial centre of Sumbawanga. The Rukwa Coalfields are comprised of the Mkomolo, Namwele and
Slide 7: Sumbawanga and Site Area
Sumbawanga and Site Area Sumbawanga – Regional Centre Top: Old Namwele Pit Bottom: Upgrading access to the coal deposit Top: New +200km Road Connection Bottom: Namwele Pit Workings 7 www.edenville-energy.com
Slide 8: Resource Statement – Rukwa
Resource Statement – Rukwa The JORC Compliant Resource Statement completed in 2013 from Independent Consultants SMS outlined 173 Million Tonnes of which 61.5 Million Tonnes are in the Measured Category Deposit Classification Tonnes Measured 36,958,091 Mkomolo Indicated 93,414,982 Inferred 1,923,817
Slide 9: Extensive Outcropping of Coal
Extensive Outcropping of Coal Mkomolo – Old Surface Workings Diamond Drilling at Mkomolo Mkomolo Drill Core “Bar Code” Coal measures (seams marked in red) 1 metre Overburden at Namwele Mkomolo Prospecting Pit 9 www.edenville-energy.com
Slide 10: Site Development Initiated
Site Development Initiated Top: Providing education facilities to the local community Top: Accessing extensive outcropping at Mkomolo Centre: Site visit by senior MEM and Tanesco officials Bottom & Bottom Centre: Access upgrade work Bottom: Bulk sampling at Mkomolo 10 www.edenville-energy.com
Slide 11: Current Status – Mining
Current Status MINING - The Current Status Mining Licence and Mining Environmental Certificate in place – enables mining operations on the Mkomolo deposit which holds the majority of the Rukwa coal resource – further prospecting licence areas to be converted to mining licences as the project progr
Slide 12: Current Status – Power
Current Status POWER- The Current Status The timing and structure of the power development at Rukwa (and elsewhere in Tanzania) is controlled by the Ministry of Energy and Minerals (MEM) and Tanesco along with other government bodies including the Energy and Water Utilities Regulatory Authority (E
Slide 13: Target Timeline to Planned Development
Target Timeline to Planned Development 13 www.edenville-energy.com
Slide 14: Board and Management Team
Board and Management Team Jeffrey Malaihollo, Non Executive Chairman (from 1 Sept 2016) – 22 + experience in varied roles within resources and finance. A Phd in Geology having worked for Newcrest Mining and Loeb Aron Financial Advisors, followed by several years of CEO / MD roles with Central China
Slide 15: Appendix - Tanzania Power & Country Statistics
Appendix 1 - Tanzania Power & Country Statistics Power & Electricity Overview Country Statistics Tanzania has total installed electricity capacity of around 1,200MW, of Population: 47.2m which around 42% is generated by power Presently, only 45% of urban areas are electrified and this falls to 2014
Slide 16: Thank you
Edenville Energy plc Thank you Company Address: Aston House Cornwall Avenue London N3 1LF info@edenville-energy.com www.edenville-energy.com