Shuka Minerals Plc · LSE:SKA

Shuka Minerals — Edenville Energy — Investor Presentation (May 2019)

13 slides from Shuka Minerals's investor presentation, May 2019

  1. Slide 1: Edenville Energy plc Investor Presentation

    June 2016 Edenville Energy plc Investor Presentation May 2019 Ticker:EDL www.edenville-energy.com

  2. Slide 2: Disclaimer

    The information contained in these slides and this presentation is being supplied to you by Edenville Energy plc (the "Company”) solely for your information and may not be reproduced or redistributed in whole or in part to any other person. This document has not been approved by a person authorised

  3. Slide 3: Corporate Information

    Corporate Information Company Capitalisation Share Price Performance Share Price (15/05/2019) 0.10p 12 month share price range 0.43p - 0.0175p 0.6 800 Millions Shares in Issue 2,148,261,562* 700 0.5 Options 244,574,707** 600 Warrants 127,500,000*** 0.4 500 Fully Diluted 2,392,836,269*** 0.3 400 Curr

  4. Slide 4: Board and Management Team

    Board and Management Team Jeffrey Malaihollo, Non-Executive Chairman – Over 23 experience in varied roles within resources and finance. A PhD in geology having worked for Newcrest Mining and Rio Tinto. A mining analyst with Loeb Aron, a corporate finance firm in London, followed by several years of

  5. Slide 5: Investment Case

    Investment Case • Post fundraise and general meeting, the Company is funded to increase production to 10,000t per month within one year by: i. Opening of a new mining area; and ii. minor refurbishments to existing infrastructure; and iii. Refurbishments to the plant. • The Board believe there is a p

  6. Slide 6: Sales Strategy

    Sales Strategy • The company reported revenues for the first time in H1 2018 • Between 1 Jan 2018 and 31 March 2019, Edenville processed approximately 92,000 tonnes of Run of Mine (“ROM”) Coal • Production included 18,000 tonnes of washed coal and 40,000 tonnes of fine coal • Circa 17,500 tonnes (mo

  7. Slide 7: Rukwa Mine - Infrastructure

    Rukwa Mine - Infrastructure • Favourable position for infrastructure • Domestic and external markets accessible • Choice of transportation and export scenarios • Existing production sold FOB Road network north and south of the project Multiple access to Zambia going south (140/240km) Lake Tanganyika

  8. Slide 8: Existing Operations – Rukwa Mine

    Existing Operations – Rukwa Mine Positive Areas Coal Production 2018 (non audited) ¡ Established operation 6000 5000 Washed Coal ¡ Regular sales and customers Production 4000 Tonnes Fine Coal ¡ Significant potential for additional customers 3000 Production 2000 ¡ Plant upgrade completed 1000 ¡ New m

  9. Slide 9: Edenville Energy plc

    Edenville Energy plc Company Address: Aston House, Cornwall Avenue, London N3 1LF info@edenville-energy.com www.edenville-energy.com Nominated Adviser & Joint Broker: SP Angel Corporate Finance LLP www.spangel.co.uk Joint Broker: Brandon Hill Capital Limited www.brandonhillcapital.com Financial PR:

  10. Slide 10: Appendix 1 – Resource Estimate

    Appendix 1 – Resource Estimate The JORC Compliant Mineral Resource Estimate completed in 2013 from Independent Consultants SMS outlined 173 Million Tonnes of which 61.5 Million Tonnes are in the Measured Category Deposit Classification Tonnes Measured 36,958,091 Mkomolo Indicated 93,414,982 Inferred

  11. Slide 11: Appendix 2 – Tanzanian Statistics

    Appendix 2 – Tanzanian Statistics Power & Electricity Overview Country Statistics Tanzania has total installed electricity capacity of around 1,500MW Population: approximately 57.2m Approximately only 33% of the population has access to electricity. 2014 per capita GDP: US$912.7 Adult literacy in Ta

  12. Slide 12: Appendix 3: Operating Rukwa Mine Photos

    Appendix 3: Operating Rukwa Mine Photos Top: A Crushed Coal Stockpile Top: Mining Coal Top: Washed Coal Stockpile Bottom: Mining Upper Seam Coal Bottom: Wash Plant Source: Edenville Energy 12 www.edenville-energy.com

  13. Slide 13: Appendix 4: Plant, Loading Yard and Pit

    Appendix 4: Plant, Loading Yard and Pit Source: Edenville Energy 13 www.edenville-energy.com

Edenville Energy — Investor Presentation (May 2019) on 6ix