Argosy Minerals Limited · ASX:AGY

Argosy Minerals — Bell Potter Unearthed Conference (February 2024)

24 slides from Argosy Minerals's conference presentation, Feb 13, 2024

  1. Slide 1: Argosy Minerals (ASX: AGY)

    ASX: AGY www.argosyminerals.com.au

  2. Slide 2: Building a Tier-1 Lithium Producer

    Building a Tier-1 Lithium Producer • Well established & experienced team of technical operators in Argentina • Supported by strong technical and corporate team in Perth Experienced Team • Pablo Alurralde with +30 years industry experience, ex-FMC (Livent), patented lithium carbonate production • Ind

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Capital Structure Share Price vs Lithium Price 0.90 90.0 0.80 Lithium Price (US$/kg) 80.0 Shares on issue 1,404,407,498 0.70 70.0 Share Price (A$) 0.60 60.0 0.50 50.0 Share price 1 A$0.10 0.40 40.0 0.30 0.20 30.0 Market capitalisation 1 A$140 million 0.10 20.0 0.00 10.0 Cash 2 A$1

  4. Slide 4: Rincon Lithium Project: Production in Argentina

    Rincon Lithium Project: Production in Argentina  Rincon Lithium Project located in the world-class “Lithium Bolivia Triangle” in Salta Province, Argentina  Argosy currently owns 77.5% of Puna Mining S.A., moving to Olaroz - Arcadium Lithium 90% ownership upon development of 10,000tpa operation Ata

  5. Slide 5: Lithium Demand Growth Continues

    Lithium Demand Growth Continues 5

  6. Slide 6: Lithium Supply Shortfall Looming

    Lithium Supply Shortfall Looming Demand Growth Unprecedented New operations required to achieve product supply to meet demand in coming years 3.5 +213% 8.0 Secondary Brownfield expansion 3.0 7.0 Operating Base case demand 2.5 6.0 High case demand Mt LCE (weighted) Mt LCE Demand 5.0 2.0 4.0 1.5 +446%

  7. Slide 7: New Operations Critical to Meet Demand

    New Operations Critical to Meet Demand History Repeating 8.0 Secondary 7.0 Possible Challenging market conditions – lithium mines Probable Highly probable being suspended or reducing operations 6.0 Brownfield expansion Operating Base case demand Lithium prices move closer to the cost of 5.0 producti

  8. Slide 8: Rincon 2,000tpa Operation Status

    Rincon 2,000tpa Operation Status 8

  9. Slide 9: 2,000tpa Operation Status

    2,000tpa Operation Status  Focus to complete ramp-up works toward production operations  Key workstreams to achieve 2,000tpa production operations include:  Focus on primary solids filtration circuit and improving filtration rates  Comprehensive test-works, including flowrate variation and filte

  10. Slide 10: 2,000tpa Operation – Toward Production

    2,000tpa Operation – Toward Production Construction complete - Ramp-up works in progress Producing high purity battery quality Li2CO3 product, successfully produced +63t to date & strong off-taker interest, with product testing being undertaken with strategic customers 2ktpa operation sets Argosy ap

  11. Slide 11: Rincon 10,000tpa Operation Overview

    Rincon 10,000tpa Operation Overview 11

  12. Slide 12: 10,000tpa Operation Status

    10,000tpa Operation Status EIA regulatory approval process expected to be finalised during Q1-CY2024 Pre-development works ongoing, including process design reviews, evaporation pond design & engineering and industrial water drilling operations Planning works and project engineering definition under

  13. Slide 13: 10,000tpa Operation – Production Expansion

    10,000tpa Operation – Production Expansion 13

  14. Slide 14: Significant Infrastructure Footprint

    Significant Infrastructure Footprint Rincon has significant site, power and Existing ~58ha transport infrastructure in place operational evaporation ponds Commercial 10,000tpa scale evaporation Site of 2,000tpa facility & ponds (~350ha) to be constructed ~6km from planned 10,000tpa production wells

  15. Slide 15: JORC Mineral Resource

    JORC Mineral Resource Li2CO3 Weighted mean average (tonnes) lithium concentration Total Mineral Resource Estimate (MRE) 686,875 329mg/L Indicated MRE 606,313 326mg/L Inferred MRE 80,562 351mg/L Updated Total MRE1 completed in January 2024 forms basis for increased sustainable commercial production t

  16. Slide 16: Project Milestones

    Proposed 10,000tpa Expansion Operation Timetable* Secure and implement Commence Execution Phase Operations/Ramp- funding Construction up Phase H1 H2 H3 H4 H5 H6 H7 H8 EPCM Contractor Evaluation Process 3 - 6 months to implement funding post “Decision • Finalise basis of design to Mine” approval • Fi

  17. Slide 17: Tonopah Lithium Project

    Tonopah Lithium Project 17

  18. Slide 18: Tonopah Lithium Project – Nevada, USA

    Tonopah Lithium Project – Nevada, USA TONOPAH IS STRATEGICALLY LOCATED IN THE EMERGING USA LITHIUM HEARTLAND Located ~4km from Albermarle’s longstanding Silver Peak operation - the only lithium carbonate operation in USA Geophysical data identifies lithium brine target areas Gravity-derived 3D depth

  19. Slide 19: The Next Tier 1 Sustainable Lithium Carbonate Producer

    The Next Tier 1 Sustainable Lithium Carbonate Producer 19

  20. Slide 20: Rincon Lithium Project: Supporting our communities

    Rincon Lithium Project Supporting our communities Our CSR pillars Employment Education Training Local Suppliers Fair wages, Encouragement and Training on specific Being hired by the professional growth, incentive for employees topics - caring for the company on a regular family care and to finish se

  21. Slide 21: Upcoming Milestones

    Upcoming Milestones Finalised upgraded JORC resource, to support increased production  capacity and operation mine-life  Ramp-up & progress to 2,000tpa Li2CO3 production operations Receive EIA regulatory approval for 10,000tpa Li2CO3 expansion  operation  Key 10ktpa engineering works updates (in

  22. Slide 22: Contact

    Argosy Minerals Limited (ASX: AGY) +61 8 6188 8181 Contact admin@argosyminerals.com.au www.argosyminerals.com.au Level 2, 22 Mount Street Perth WA 6000 Australia 22

  23. Slide 23: Disclaimer & Important Statement

    Disclaimer & Important Statement • This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation m

  24. Slide 24: Disclaimer & Important Statement

    Disclaimer & Important Statement • The Mineral Resources information in this report is extracted from the report entitled “JORC Resource Upgrade for Rincon Lithium Project – Substantial 180% Increase” dated 15 January 2024 available at www.argosyminerals.com.au and www.asx.com. Argosy confirms that