Argosy Minerals Limited · ASX:AGY

Argosy Minerals — Investor Presentation (October 2021)

21 slides from Argosy Minerals's investor presentation, October 2021

  1. Slide 1: Investor Presentation

    Investor Presentation October 2021 ASX: AGY www.argosyminerals.com.au

  2. Slide 2: Disclaimer & Important Statement

    Disclaimer & Important Statement • This presentation is for information purposes only. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation m

  3. Slide 3: Company Overview

    Company Overview 3

  4. Slide 4: What sets us apart from our peers

    What sets us apart from our peers  Owner of the Rincon Lithium Project, Salta Province, Argentina – 77.5% current interest, increasing to 90% ownership upon development of 10,000tpa operation  Industrial-scale pilot plant in operation for over 2 years  Proof of Concept – produced +30 tonnes of ba

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot Capital Structure Recent Share Price Performance Shares on issue 1,250,271,704 0.25 50 Share price 1 A$0.19 Volume Close 45 0.20 40 Market capitalisation 1 A$238 million 35 (Price A$/sh) Cash 2 Volume (m) A$27.8 million 0.15 30 2 Debt Nil 25 Options 3 154,719,285 0.10 20 15 ASX co

  6. Slide 6: Rincon Project: Lithium Production

    Rincon Project: Lithium Production 6

  7. Slide 7: Rincon Lithium Project: Production in Argentina

    Rincon Lithium Project: Production in Argentina • Rincon Lithium Project located in the world-class “Lithium Triangle” in Salta Province, Argentina • Project area located adjacent to highway, gas pipeline, grid power & solar park • PEA completed in 2018 - US$399M1 NPV10%, IRR 53%, Opex US$4,645/t •

  8. Slide 8: Industrial Scale Pilot Plant – Producing Li2CO3

    Industrial Scale Pilot Plant – Producing Li2CO3 1 Industrial Scale Pilot Plant • Industrial scale pilot plant has successfully proven AGY’s proprietary technology • Produced +30t of battery quality lithium carbonate at >99.5% Li2CO3 purity • Delivered two cargoes to customers in Japan and South Kore

  9. Slide 9: Stage in Construction: 2,000tpa Operation

    Stage 2 in Construction : 2,000tpa Operation 2 2,000tpa Li2CO3 Production Capacity • Construction 40% complete • First Li2CO3 product by mid-2022 • CAPEX ~US$20 million (excl. VAT) - fully funded • Works progressing on schedule and budget Advantages associated with Argosy’s fast-track development st

  10. Slide 10: Stage in Construction: 2,000tpa Operation

    Stage 2 in Construction : 2,000tpa Operation 10

  11. Slide 11: Stage in Construction: 2,000tpa Operation

    Stage 2 in Construction : 2,000tpa Operation 11

  12. Slide 12: 10,000tpa Expansion Operation

    10,000tpa Expansion Operation 3 12,000tpa Li2CO3 Production Capacity • Completed PEA with exceptional results - low opex and robust returns • Permitting approval for additional 10,000tpa operation expected late-2021 • Will utilise the same processing technology as the 2,000tpa operation – modular ad

  13. Slide 13: Significant Infrastructure Footprint

    Significant Infrastructure Footprint • Rincon has significant site, power and transport infrastructure in place • Commercial 10,000tpa scale evaporation ponds (~300ha) to be constructed ~6km Existing ~38ha from production wells and proposed process operational evaporation ponds plant site Site of 2,

  14. Slide 14: Minimal Environmental Footprint

    Minimal Environmental Footprint High Water Low Impact Green Process & Low Energy Use Low Water Use Clean Technology Green Product Recycling Flora & Fauna Argosy has developed a chemical process technology with a minimal environmental footprint • Technology has two key differentiating factors compare

  15. Slide 15: Low Carbon Footprint A Reality

    Low Carbon Footprint A Reality • AGY has the ability to be truly carbon neutral • Altiplano Solar Power Park: - Less than 5km to plant operations - Final stages of construction, fully operational in late-2021 5km - Owned and operated by Neoen, France’s leading independent producer of renewable energ

  16. Slide 16: Significant Exploration Potential to Realise

    Significant Exploration Potential to Realise • 245,120t Li2CO3 JORC Indicated Resource to a vertical depth of 102.5m • Additional Exploration Target1 of 262,000t to 479,000t contained Li2CO3 within depth interval between 102.5m to 300m below ground level • Combined JORC Indicated Mineral Resource an

  17. Slide 17: Argentina & Salta: Open for business

    Argentina & Salta: Open for business • Investment friendly tax regime, no need to negotiate separate fiscal agreements: - 25% Corporate income tax - 30 year tax stabilisation - VAT is set at 21%, with some capital items attracting a lower rate of 10.5%. Reimbursement for imported capital assets & se

  18. Slide 18: Tonopah Project: Exploration

    Tonopah Project: Exploration 18

  19. Slide 19: Tonopah Lithium Project – Nevada USA

    Tonopah Lithium Project – Nevada USA TONOPAH IS STRATEGICALLY LOCATED IN THE EMERGING USA LITHIUM HEARTLAND • Located ~4km from Albermarle’s longstanding Silver Peak operation - the only lithium carbonate operation in USA (operating for +50yrs) • Geophysical data identifies lithium brine target area

  20. Slide 20: Argosy: A New Lithium Producer

    Argosy: A New Lithium Producer  Staged development strategy - industrial scale pilot plant→2,000tpa→12,000tpa o Stage 1 – Pilot plant accelerating process and product qualification works o Stage 2 – 2,000tpa in construction → first commercial production from mid-2022 Rincon Lithium o Stage 3 – 10,0

  21. Slide 21: Contact

    Jerko Zuvela, Managing Director Contact +61 8 6188 8181 admin@argosyminerals.com.au Level 2, 22 Mount Street Perth WA 6000 Australia 21

Argosy Minerals — Investor Presentation (October 2021) on 6ix