Nevada Copper Corp.

Nevada Copper — Investor Presentation (December 2019)

27 slides from Nevada Copper's investor presentation, December 2019

  1. Slide 1: America's Next Mid-Tier Copper Producer

    Slide 1: America's Next Mid-Tier Copper Producer

    TSX:NCU nevadacopper.com AMERICA’S NEXT MID-TIER COPPER PRODUCER nevadacopper.com TSX:NCU | December, 2019

  2. Slide 2: Cautionary Note

    Slide 2: Cautionary Note

    CAUTIONARY NOTE Forward-Looking Information obligation to publicly update or revise such information to reflect new events or circumstances, except as may be required by applicable securities laws. Investors ▪ This presentation contains forward-looking statements and forward-looking are cautioned no

  3. Slide 3: Building the Next Mid-Tier Copper Producer

    Slide 3: Building the Next Mid-Tier Copper Producer

    BUILDING THE NEXT MID-TIER COPPER PRODUCER PUMPKIN HOLLOW NOW PRODUCING CONCENTRATE. OPEN PIT PROJECT ADVANCING TO FEASIBILITY STAGE. CLEAR PATH FOR EXPANSION AND EXPLORATION. • Mill for underground mine commenced production, as scheduled, in December, 20191 • Currently ramping up to full commercial

  4. Slide 4: Stable, Highly Supportive Jurisdiction

    Slide 4: Stable, Highly Supportive Jurisdiction

    STABLE, HIGHLY SUPPORTIVE JURISDICTION Favorable Mining Conditions in Nevada, USA • Nevada is Fraser Institute’s Top Ranked Mining Jurisdiction in the World • Desert climate and local topography optimal for efficient and eco-friendly mining techniques. No Tailings Dam required as Company is able to

  5. Slide 5: The Right Timing

    Slide 5: The Right Timing

    THE RIGHT TIMING 2018 Top 10 Copper Producing Jurisdictions1 STRONG COPPER FUNDAMENTALS (Thousand tonnes) ▪ Substantial part of global supply comes from fragile Russia 785 jurisdictions Indonesia 686 ▪ Global growth is combining with new demand from Mexico 722 electric vehicles, grid upgrades, charg

  6. Slide 6: Backed by Blue Chip Investors

    Slide 6: Backed by Blue Chip Investors

    BACKED BY BLUE CHIP INVESTORS CAPITALIZATION ITEMS STRONG INSITUTIONAL BACKING Key Shareholders Include: Symbol TSX: NCU Blackrock Share Price (November 21, 2019) US$ 0.19 Capital Group Canadian Market Capitalization US$ 145M Castlelake LP Senior Debt US$ 116M1 CIBC Cash & Equivalent US$ 14.6M1 Fide

  7. Slide 7: Strong Partnerships in Place

    Slide 7: Strong Partnerships in Place

    STRONG PARTNERSHIPS IN PLACE Our new partner KfW IPEX-Bank is a large, sought-after financing partner focused on the export industry, climate protection, infrastructure and the supply of raw materials. The Bank is also a key adviser for policymakers. “Financing of this type allows KfW IPEX-Bank to p

  8. Slide 8: Mine Building & Operations Expertise

    Slide 8: Mine Building & Operations Expertise

    MINE BUILDING & OPERATIONS EXPERTISE Matthew Gili, P. Eng. President and CEO ▪ Comes directly from Barrick, where he served as Executive General Manager Tom Albanese, Braam Jonker, CFO for the Cortez District in Nevada and, ▪ Registered Chartered Lead Independent Director more recently, as Chief Tec

  9. Slide 9: The Pumpkin Hollow Copper Project

    Slide 9: The Pumpkin Hollow Copper Project

    THE PUMPKIN HOLLOW COPPER PROJECT Power Paved Road Access U/G Open Pit UNDERGROUND MINE nevadacopper.com ▪ Fully-permitted, mineral reserves of 23.9 Mst @ Private Land Owned 1.74% Cu eq1 By Nevada Copper ▪ 13.5-year mine life1 ▪ Ramping up to commercial production in 2020, targeting 50M lbs copper p

  10. Slide 10: Track Record of Delivering on Schedule

    Slide 10: Track Record of Delivering on Schedule

    TRACK RECORD OF DELIVERING ON SCHEDULE “In August 2018, Nevada Copper posted a target of Q4, 2019 for production. 16 months later, the company began producing concentrate as scheduled.” Open Pit PFS Targeting U/G Targeting OP Optimization Pit Drilling Full Commercial Construction Production Decision

  11. Slide 11: Underground Mine: Economically Robust with Expansion Potential

    Slide 11: Underground Mine: Economically Robust with Expansion Potential

    UNDERGROUND MINE: ECONOMICALLY ROBUST WITH EXPANSION POTENTIAL 1 UNDERGROUND MINE HIGHLIGHTS Project Post-Tax 25% IRR and US$301M NPV5% Robust economics Economics1 First 5 Years LOM 2 Competitive OPEX Opex C1: US$1.68/lb Cu C1: US$1.81/lb Cu AISC: US$1.96/lb Cu AISC: US$1.86/lb Cu Production Y1-5 an

  12. Slide 12: Significant Underground Resource Upside

    Slide 12: Significant Underground Resource Upside

    SIGNIFICANT UNDERGROUND RESOURCE UPSIDE - Large quantity of inferred resource mineralization (approx. 636M lbs copper) presents opportunity to upgrade with underground drilling nevadacopper.com TSX:NCU | NI 43-101 Technical Report: Pumpkin Hollow Project, Open Pit and Underground Mine Prefeasibility

  13. Slide 13: Open Pit PFS Results Summary

    Slide 13: Open Pit PFS Results Summary

    OPEN PIT PFS RESULTS SUMMARY: STRONG CASH GENERATOR, LOW CAPEX, LONG LIFE 1 OPEN PIT PFS HIGHLIGHTS Project Robust economics Economics Post-Tax 21% IRR and $829M NPV7.5% Low upfront capex CAPEX Pre-production capex: US$672 million Competitive opex OPEX2 $1.73/lb Cu (C1) and $2.03/lb Cu (AISC)5 Long

  14. Slide 14: Favorable Upfront Cost, Simplified Build and Phased Expansion

    Slide 14: Favorable Upfront Cost, Simplified Build and Phased Expansion

    FAVORABLE UPFRONT COST, SIMPLIFIED BUILD AND PHASED EXPANSION: Conventional truck-and-shovel Isometric Illustration (Looking SE) of the Stand-alone Open Pit Project.2 ✓ Low capital intensity of South Pit US$9,544/annual tonne of 163Mt @ 0.37%Cu Ore Stockpile Strip Ratio 2.4 Cu-eq production1 Primary

  15. Slide 15: Open Pit: Robust Economics and Optionality

    Slide 15: Open Pit: Robust Economics and Optionality

    OPEN PIT: ROBUST ECONOMICS AND OPTIONALITY 1 - Strong economics for the open pit production plan - LoM of 37kstpd for 6 years and then 13 years at 70kstpd production rate (19 years) - Timing of expansion to 70kstpd is flexible and decision will be based on market conditions. There is no obligation t

  16. Slide 16: Demonstrated Scope for Pit Deposit Expansion

    Slide 16: Demonstrated Scope for Pit Deposit Expansion

    Open Pit Optimization DEMONSTRATED SCOPEPlanFOR PIT DEPOSIT EXPANSION 1 Recent Drilling (2018 summer program) ✓ Extended open pit deposit, both within and beyond the existing pit shell ✓ Demonstrated further expansion potential in multiple directions Further Drilling ✓ Current reserve model excludes

  17. Slide 17: Attractive Whole of Property Economics

    Slide 17: Attractive Whole of Property Economics

    ATTRACTIVE WHOLE OF PROPERTY ECONOMICS 1 Potential combined economics of standalone underground and standalone open pit ✓ Combined IRR of 24% pre-tax (22% post-tax) ✓ Combined NPV7.5% of US$1,320M pre-tax (US$1,062M post-tax)2 ✓ Further drilling of inferred resources of both Open Pit and Underground

  18. Slide 18: Exploration Program: New Ground

    Slide 18: Exploration Program: New Ground

    EXPLORATION PROGRAM: NEW GROUND Exploration Activity Drill test high-priority areas including Tedeboy and East targets • Mapping, sampling, airborne geophysics • Drill test Tedeboy target • Drill test East target nevadacopper.com TSX:NCU | 18

  19. Slide 19: Exploration: New Ground – Surface Outcrops

    Slide 19: Exploration: New Ground – Surface Outcrops

    EXPLORATION: NEW GROUND – SURFACE OUTCROPS nevadacopper.com TSX:NCU | 19

  20. Slide 20: Exploration Program: Open Pit Advancement

    Slide 20: Exploration Program: Open Pit Advancement

    EXPLORATION PROGRAM: OPEN PIT ADVANCEMENT Open Pit Exploration Open Pit Advancement Drill test open extensions to the Open Pit ore body and Infill drilling of in-pit inferred material to increase resource tonnage follow up on 2018 results and grade • Drill test the new, shallow mineralization in the

  21. Slide 21: First Mover Advantage in a Region with Major Potential

    Slide 21: First Mover Advantage in a Region with Major Potential

    FIRST MOVER ADVANTAGE IN A REGION WITH MAJOR POTENTIAL Nevada Copper’s Geologic Advisory Council (GAC) has been formed. We are leveraging their vast experience and knowledge of the Yerington District to optimize our growth strategy BEAR Large district Cu MCARTHUR Inventory BEAR ANN MASON BLUE HILLS

  22. Slide 22: Potential Open Pit Funding Options

    Slide 22: Potential Open Pit Funding Options

    1 POTENTIAL OPEN PIT FUNDING OPTIONS Open Pit Funding Options ✓ Partial use of underground production cashflows ✓ Project debt financing akin to that in place for the UG underground project Production Cashflow ✓ Concentrate off-take and pre-pay agreement ✓ Asset Level Partnership Options Minority ✓

  23. Slide 23: Analyst Coverage

    Slide 23: Analyst Coverage

    ANALYST COVERAGE Research Analyst Scotia Capital Inc. Orest Wowkodaw, CFA Numis Securities Justin Chan RBC Dominion Securities Inc. Sam Crittenden National Bank Financial Markets Shane Nagle, CFA nevadacopper.com Haywood Securities Inc. Pierre Vaillancourt Arlington Group Asset Management Ltd. Matt

  24. Slide 24: Appendix - Current Project Financing Summary

    Slide 24: Appendix - Current Project Financing Summary

    APPENDIX - CURRENT PROJECT FINANCING SUMMARY ROBUST AND FLEXIBLE CONSTRUCTION/RAMP UP ATTRACTIVE, LONG-TERM BALANCE SHEET FINANCING PROJECT FINANCE FACILITY Project finance senior debt facility US$115 MILLION1 US$30 MILLION2 supported by loan guarantee issued KfW IPEX-Bank project Credit facility (n

  25. Slide 25: Mineral Reserves

    Slide 25: Mineral Reserves

    MINERAL RESERVES Mineral Reserve Estimate (Underground) Note: Effective date on the Underground Mineral Reserve is September 15, 2017 Tons Cu Au Ag Category (millions) % oz/st oz/st Proven 7.4 1.85 0.007 0.144 Probable 16.5 1.47 0.006 0.138 Net Reserves 23.9 1.59 0.006 0.139 Mineral Reserve Estimate

  26. Slide 26: Mineral Resources

    Slide 26: Mineral Resources

    MINERAL RESOURCES The current mineral resource estimate for the Open Pit was disclosed April 16, 2019 and the related NI 43-101 Technical Report was filed on SEDAR in April 16, 2019, with an effective date of January 21, 2019. Confidence Category Ore (Mst) Average Ore Grades Contained Metal Cu (%) A

  27. Slide 27: Investor Relations Contact

    Slide 27: Investor Relations Contact

    Nevada Copper Corp Investor Relations Suite 598, 999 Canada Place Rich Matthews Vancouver, BC Rmatthews@nevadacopper.com P: 1-(604) 683-8992 P: 1-(604) 683-8266 F: 1-(604) 681-0122 TF: 1-(877) 648-8266 nevadacopper.com TSX:NCU | 27

Source: Internet Archive copy of nevadacopper.com

More decks from Nevada Copper Corp.