Terramin Australia Limited · ASX:TZN
Terramin Australia — Corporate Update (November 2016)
16 slides from Terramin Australia's corporate update, Nov 23, 2016
Slide 1: Terramin General Update
Terramin General Update Joe Ranford – General Manager Angas Zinc Mine 1
Slide 2: Angas Zinc Mine
Angas Zinc Mine Outcome Criteria Tables for Mine Closure Plan completed! Submitted Closure costings for review NEW SA Cost Calculator Remaining: Internal management Closure Plan review Requested direction on Lease Condition change from DSD Negotiation for cleanfill clay from Adelaide Hil
Slide 3: Terramin - Projects
Terramin - Projects Bird in Hand Conceptual underground and surface design refinement Community consultation First open public meeting in September Groundwater workshops in October Geotechnical / Blasting workshops in December Vegetation works continue onsite Tala Hamza Algeria sit
Slide 4: Quarterly Environment Report
Quarterly Environment Report Matt Daniel – Environment and Community Superintendent Angas Zinc 4
Slide 5: Overview
Overview No non-compliances against Lease Condition Outcomes for Quarter 3, 2016 Largest ever host of Government Regulators onsite in August Fortnightly meetings with DSD, EPA, DEWNR Outcome tables finalised between Terramin, DSD, EPA and DEWNR Ground and surface water Acid and Metallife
Slide 6: Callington Road – Geotechnical Stability
Callington Road – Geotechnical Stability DPTI have reviewed all monitoring data Letter sent to Matt Daniel on 2nd September 2016 STEDS will continue to be monitored “After consideration of the evidence produced by yourself (MD) and Mr Joe Ranford on behalf of Terramin Australia Ltd, the depart
Slide 7: TSF
TSF TSF remained under 15 000m2 throughout Q3 – peaked at 14 800 in September Seepage drains increased slightly to 3.0L/minute (from 2.4L/minute) Location Total Q3 Strathalbyn PO - Average 178.3 Strathalbyn PO - 2016 314.6 AZM - 2016 379.14
Slide 8: Revegetation at AZM
Revegetation at AZM Some wetland species present Common Spike Rush Eleocharis sp. Julia’s basket weaving species Spiney Headed Sedge Cyperus gymnocaulos
Slide 9: Strathalbyn Show
Strathalbyn Show AZM Terramin Stand Mine Closure Strategies Draft final landform TSF Phytocap outline Bird in Hand proposed haulage route Bird in Hand and AZM Project SCCC member Julia Currie with Environment Superintendent Matt Daniel
Slide 10: Government Regulatory Team onsite 9th August 2016
Government Regulatory Team onsite 9th August 2016 Site inspection for government regulators DSD Kyle Rice Senior Compliance Regulator Paul Thompson Assessment Officer Antonia Scrase Senior Mine Closure Officer EPA Greg Tyczenko Manager Mineral Resources Prabhu Shankar Senior Environm
Slide 11: Mine Closure Plan Update
Mine Closure Plan Update Matt Daniel – Environment and Community Superintendent Angas Zinc 11
Slide 12: Closure Tasks – Completed and Remaining
Closure Tasks – Completed and Remaining Completed Remaining Phytocap final report DSD Review of Closure Costings - covering all modelling changes review (based on Closure Strategies) - construction designs - Awaiting response from Senior DSD - compares and contrasts Closure Costing Officer O’Kane an
Slide 13: TSF Closure Monitoring Plan
TSF Closure Monitoring Plan Vegetation assessment, erosion and TSF Cap Infiltration visual amenity Volumetric water content at 4 Laser and DTM/DSM survey to detect locations at 10 depths erosion and vegetation cover Matric suction (negative pore water Landscape Function Analysis – pressu
Slide 14: Terramin Angas Zinc Mine Closure – TSF Locations
A=COM PROcT TERRAMIN ANGAS ZINC MINE CLOSURE STRATHALBYN cuent ‘TeRWUIAN Pay Us ‘Adem. Unt 7. 202-206 Clon Osmond Row atarton BA 2083 CONSUL TANT RECOM Acaane Fey ‘AGW 20009 64s 202 Key Puan TSF LOCATIONS.
Slide 15: EPA Site Contamination Assessment Captured in DSD Outcome Tables
EPA Site Contamination Assessment Captured in DSD Outcome Tables Collaboration between EPA and DSD EPA “Site Contamination” now captures final review of: Groundwater Surface water Soil quality Waste disposal and hazardous substances “Prior to surrender of the ML, a suitably qualified sit
Slide 16: Questions?
Questions? Happy Birthday Paul!