  1. Slide 1: Terramin General Update

    Terramin General Update Joe Ranford – General Manager Angas Zinc Mine 1

  2. Slide 2: Angas Zinc Mine

    Angas Zinc Mine  Outcome Criteria Tables for Mine Closure Plan completed!  Submitted Closure costings for review  NEW SA Cost Calculator  Remaining: Internal management Closure Plan review  Requested direction on Lease Condition change from DSD  Negotiation for cleanfill clay from Adelaide Hil

  3. Slide 3: Terramin - Projects

    Terramin - Projects  Bird in Hand  Conceptual underground and surface design refinement  Community consultation  First open public meeting in September  Groundwater workshops in October  Geotechnical / Blasting workshops in December  Vegetation works continue onsite  Tala Hamza  Algeria sit

  4. Slide 4: Quarterly Environment Report

    Quarterly Environment Report Matt Daniel – Environment and Community Superintendent Angas Zinc 4

  5. Slide 5: Overview

    Overview  No non-compliances against Lease Condition Outcomes for Quarter 3, 2016  Largest ever host of Government Regulators onsite in August  Fortnightly meetings with DSD, EPA, DEWNR  Outcome tables finalised between Terramin, DSD, EPA and DEWNR  Ground and surface water  Acid and Metallife

  6. Slide 6: Callington Road – Geotechnical Stability

    Callington Road – Geotechnical Stability  DPTI have reviewed all monitoring data  Letter sent to Matt Daniel on 2nd September 2016  STEDS will continue to be monitored “After consideration of the evidence produced by yourself (MD) and Mr Joe Ranford on behalf of Terramin Australia Ltd, the depart

  7. Slide 7: TSF

    TSF  TSF remained under 15 000m2 throughout Q3 – peaked at 14 800 in September  Seepage drains increased slightly to 3.0L/minute (from 2.4L/minute) Location Total Q3 Strathalbyn PO - Average 178.3 Strathalbyn PO - 2016 314.6 AZM - 2016 379.14

  8. Slide 8: Revegetation at AZM

    Revegetation at AZM  Some wetland species present  Common Spike Rush Eleocharis sp.  Julia’s basket weaving species  Spiney Headed Sedge Cyperus gymnocaulos

  9. Slide 9: Strathalbyn Show

    Strathalbyn Show  AZM Terramin Stand  Mine Closure Strategies  Draft final landform  TSF Phytocap outline  Bird in Hand proposed haulage route  Bird in Hand and AZM Project SCCC member Julia Currie with Environment Superintendent Matt Daniel

  10. Slide 10: Government Regulatory Team onsite 9th August 2016

    Government Regulatory Team onsite 9th August 2016  Site inspection for government regulators  DSD  Kyle Rice Senior Compliance Regulator  Paul Thompson Assessment Officer  Antonia Scrase Senior Mine Closure Officer  EPA  Greg Tyczenko Manager Mineral Resources  Prabhu Shankar Senior Environm

  11. Slide 11: Mine Closure Plan Update

    Mine Closure Plan Update Matt Daniel – Environment and Community Superintendent Angas Zinc 11

  12. Slide 12: Closure Tasks – Completed and Remaining

    Closure Tasks – Completed and Remaining Completed Remaining Phytocap final report DSD Review of Closure Costings - covering all modelling changes review (based on Closure Strategies) - construction designs - Awaiting response from Senior DSD - compares and contrasts Closure Costing Officer O’Kane an

  13. Slide 13: TSF Closure Monitoring Plan

    TSF Closure Monitoring Plan  Vegetation assessment, erosion and  TSF Cap Infiltration visual amenity  Volumetric water content at 4  Laser and DTM/DSM survey to detect locations at 10 depths erosion and vegetation cover  Matric suction (negative pore water  Landscape Function Analysis – pressu

  14. Slide 14: Terramin Angas Zinc Mine Closure – TSF Locations

    A=COM PROcT TERRAMIN ANGAS ZINC MINE CLOSURE STRATHALBYN cuent ‘TeRWUIAN Pay Us ‘Adem. Unt 7. 202-206 Clon Osmond Row atarton BA 2083 CONSUL TANT RECOM Acaane Fey ‘AGW 20009 64s 202 Key Puan TSF LOCATIONS.

  15. Slide 15: EPA Site Contamination Assessment Captured in DSD Outcome Tables

    EPA Site Contamination Assessment Captured in DSD Outcome Tables  Collaboration between EPA and DSD  EPA “Site Contamination” now captures final review of:  Groundwater  Surface water  Soil quality  Waste disposal and hazardous substances “Prior to surrender of the ML, a suitably qualified sit