  1. Slide 1: AGM Presentation Project Update

    Terramin Australia| ASX.TZN AGM PRESENTATION PROJECT UPDATE Martin Janes| Executive Director May 2025

  2. Slide 2: Disclaimer

    Disclaimer The material contained in this presentation has been prepared by Terramin Australia Limited (Terramin or TZN). It is current as at the date of this presentation. It contains information in a summary form and should be read in conjunction with Terramin’s other periodic and continuous discl

  3. Slide 3: Terramin Australia Project Overview

    Terramin Australia Project Overview Driving Development in Algeria and South Australia 14.2% 3

  4. Slide 4: Tala Hamza Zinc Project – 49% TZN

    Tala Hamza Zinc Project – 49% TZN One of the largest undeveloped zinc and lead mines in the world and an important part of future supply geared towards meeting projected increases in global zinc demand. 14.2% 4

  5. Slide 5: Tala Hamza Zinc Project Overview

    Tala Hamza Zinc Project Overview ❖ World-class resource with 3.5Mt of zinc and lead.1 ❖ Global resource of 53.0 Mt @ 6.6% zinc + lead. 1 ❖ Fully permitted with mining licence and environmental approvals in place. ❖ Joint Venture with Algerian government entities – Terramin holds 49% and project mana

  6. Slide 6: Supportive Economics with Competitive Cost Position

    Supportive Economics with Competitive Cost Position Low pre- Key financials and outputs – DFS 2018 2nd Quartile cost curve position(4) production capital Key financial metrics DFS 20183 and highly Commodity Price Metrics competitive Zinc price – LOM average US$1.25/lb - US$1.50/lb operating costs, L

  7. Slide 7: Bird-in-Hand Gold Project – 100% TZN

    Bird-in-Hand Gold Project – 100% TZN ❖ In February 2023, SA Government rejected Terramin’s proposal to mine. Terramin initiated legal action against SA Government in late 2023. ❖ On October 14, 2024, Supreme Court of SA heard the judicial review of the government’s decision. The Court has reserved i

  8. Slide 8: Kapunda ISR Copper Project – 50% TZN

    Kapunda ISR Copper Project – 50% TZN ❖ Terramin, in joint venture with Environmental Copper Recovery (ECR), is assessing a low-cost in-situ recovery (ISR) copper project near Kapunda, South Australia, ~90 km north of Adelaide. ❖ Field test work confirms the technical viability of ISR copper extracti

  9. Slide 9: South Gawler Ranges Project (SGRP)

    South Gawler Ranges Project (SGRP) An underexplored, highly prospective multi-commodity 4,524km2 exploration portfolio with potential to host significant Iron Oxide Copper Gold (IOCG) mineralisation alongside epithermal Ag-Pb-Zn deposits, tin- tungsten and copper gold skarns along with potential por

  10. Slide 10: Competent Person Statement

    Competent Person Statement The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Eric Whittaker (Tala Hamza, Menninnie, Angas and Kapunda Resources and Exploration Results) and Mr Dan Brost (Bird in Hand Resource), both being

  11. Slide 11: www.terramin.com.au

    www.terramin.com.au For further information, please contact: Company Martin Janes Executive Director Terramin Australia Limited +61 8 8536 5950 info@terramin.com.au Investor Relations Mark Flynn Investor Relations Terramin Australia Limited +61 416 068 733 ir@terramin.com.au

  12. Slide 12: Appendix - Tala Hamza Zinc Project Resources & Reserves Statement

    Appendix - Tala Hamza Zinc Project Resources & Reserves Statement Table of Resources – Lead Zinc Measured Resource Indicated Resource Inferred Resource Total Resources Terramin Tonnes Zn Pb Tonnes Zn Pb Tonnes Zn Pb Tonnes Zn Pb Interest (%) (Mt) (%) (%) (Mt) (%) (%) (Mt) (%) (%) (Mt) (%) (%) 2023 T