Terramin Australia Limited · ASX:TZN
Terramin Australia — Shareholder Meeting (May 2026)
15 slides from Terramin Australia's shareholder meeting presentation, May 2026
Slide 1: AGM Presentation May 2026
Terramin Australia| ASX.TZN AGM PRESENTATION May 2026
Slide 2: Disclaimer
Disclaimer The material contained in this presentation has been prepared by Terramin Australia Limited (Terramin or TZN). It is current as at the date of this presentation. It contains information in a summary form and should be read in conjunction with Terramin’s other periodic and continuous discl
Slide 3: Corporate Snapshot
Corporate Snapshot Corporate Snapshot Corporate 52 week ASX Ticker Share Price Shares on Issue Market Cap Convertible Note trading range TZN A$0.023 2,387,663,574 A$54.91m A$10.5m $0.022-$0.080 (19 May 2026) (Undiluted) (As at 31 March 2026) Share Price Board of Directors 0.07 2,500,000 Feng (Bruce)
Slide 4: Terramin Australia Project Overview
Terramin Australia Project Overview Driving Development in Algeria and South Australia 4
Slide 5: Tala Hamza Zinc Project – 49% TZN
Tala Hamza Zinc Project – 49% TZN One of the largest undeveloped zinc and lead mines in the world and an important part of future supply geared towards meeting projected increases in global zinc demand. ❖ A large Mineral Resource of 53.0Mt @ 6.6% Zn+Pb (5.3% Zn, 1.3% Pb) which supports a 20+ year mi
Slide 6: Terramin Positioned to Benefit from Algeria's Mining Sector Reforms
Terramin Positioned to Benefit from Algeria’s Mining Sector Reforms ❖ Algeria Approves New Mining Laws (Jun 2025) ✓ Foreign ownership cap lifted from 49% to 80% ✓ Streamlined single permit (exploration and extraction) valid up to 30 years ❖ Part of Algeria’s Strategy to Diversify Economy ✓ Targeting
Slide 7: Development Milestones Achieved
Development Milestones Achieved ❖ Optimisation completed. 2026 study supports increased mining and processing rate to 2.0Mtpa (from 1.32Mtpa), enhancing project economics. ❖ Decision to Mine. JV partners endorsed development pathway in March 2022. ❖ Mining permit granted. Issued May 2023, confirming
Slide 8: Updated Study Confirms Enhanced Scale and Economics
Updated Study Confirms Enhanced Scale and Economics ❖ Updated Mining Study (Mar 2026)1 Technical Parameters Financial Parameter Estimates shows throughput increased to ~178 ktpa zinc concentrate (~93 Commodity Prices US$1.27/lb zinc Indicative ktpa contained zinc) assumptions US$0.91/lb lead 2.0Mtpa
Slide 9: Strong Government Support Underpins Project Development
Strong Government Support Underpins Project Development1 ❖ AAPI registration secured. Tala Hamza formally registered with the Algerian Investment Promotion Agency. Tala Hamza Project Site ❖ Investment incentives granted. Includes tax exemptions (corporate tax for up to 7 years, with potential extens
Slide 10: Bird-in-Hand Gold Project (BIHGP) – 100% TZN
Bird-in-Hand Gold Project (BIHGP) – 100% TZN ❖ High-grade Resource of 265,000 ounces of gold at 12.6g/t2 ❖ Tenure restored. BIHGP deposit returned to Exploration Licence 6447 held by Terramin Exploration Pty Ltd following March 2026 ❖ Suitable for underground mining using cut and fill method Court o
Slide 11: Kapunda ISR Copper Project – 25% TZN
Kapunda ISR Copper Project – 25% TZN ❖ Terramin, in joint venture with Environmental Copper Recovery (ECR), is assessing a low-cost in-situ recovery (ISR) copper project near Kapunda, South Australia, ~90 km north of Adelaide. ❖ Field test work confirms technical viability of ISR copper extraction f
Slide 12: South Gawler Ranges Project (SGRP) – 49.9% TZN
South Gawler Ranges Project (SGRP) – 49.9% TZN An underexplored, highly prospective multi-commodity 4,524km2 exploration portfolio with potential to host significant Iron Oxide Copper Gold (IOCG) mineralisation alongside epithermal Ag-Pb-Zn deposits, tin-tungsten and copper gold skarns along with po
Slide 13: www.terramin.com.au
www.terramin.com.au For further information, please contact: Company Martin Janes Executive Director Terramin Australia Limited +61 8 8536 5950 info@terramin.com.au Investor Relations Mark Flynn Investor Relations Terramin Australia Limited +61 416 068 733 ir@terramin.com.au Released with the Author
Slide 14: Appendix - Tala Hamza Resources & Production Target (July 2025)
Appendix - Tala Hamza Resources & Production Target (July 2025) Mineral Resources – July 2025¹ Category Tonnes (Mt) Zn (%) Pb (%) Contained Zn (Mt) Contained Pb (Mt) Indicated Resource 44.2 5.54 1.44 2.44 0.64 Inferred Resource 8.9 4.0 0.7 0.35 0.06 Total Resource (100%) 53.0 5.3 1.3 2.8 0.7 Terrami
Slide 15: Competent Person Statement
Competent Person Statement The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Eric Whittaker (Tala Hamza, Menninnie, Angas and Kapunda Resources and Exploration Results) and Mr Dan Brost (Bird in Hand Resource), both being