  1. Slide 1: AGM Presentation: Project Update

    AGM PRESENTATION PROJECT UPDATE Martin Janes| Executive Officer May 2022

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Disclaimer The material contained in this presentation has been prepared by Terramin Australia Limited (Terramin or TZN). It is current as at the date of this presentation. It contains information in a summary form and should be read in conjunction with Terramin’s other pe

  3. Slide 3: Tala Hamza Zinc Project

    Tala Hamza Zinc Project High grade • Tala Hamza is a high grade zinc and lead operation & large • Concentrate production will be significant in global terms scale • Tala Hamza has a projected mine life of 21 years Long life • Deposit is open to the south and east with near mine exploration potential

  4. Slide 4: Tala Hamza Overview

    Tala Hamza Overview Tala Hamza is one of the largest undeveloped zinc & lead mines in the world and an important part of future supply geared towards meeting projected increases in global zinc demand next decade Overview • World class resource containing 3.5mt of zinc and lead • Global resource1 of

  5. Slide 5: Supportive Economics with competitive cost position

    Supportive Economics with competitive cost position Low pre-production capital and highly competitive operating costs, with optimisation potential from already identified expansion cases. Project optimisation to enhance returns. Key financials and outputs – DFS 2018 2nd Quartile cost curve position(

  6. Slide 6: Bird-in-Hand Gold Project

    Bird-in-Hand Gold Project ✓ High grade: Reserve grade of 13g/t gold, ~4 years mining inventory producing ~180k oz of gold and 80k oz silver in concentrate ✓ Growth potential: significant scope for resource expansion at depth and from underexplored historic workings along strike ✓ Feasibility study c

  7. Slide 7: Bird-in-Hand: Simple Mining & Processing

    Bird-in-Hand: Simple Mining & Processing Terramin’s existing Angas processing facility at Strathalbyn will be a central hub for gold production from Bird in Hand and potentially other regional high grade gold exploration targets • Simple small scale underground cut and fill mining operation • High g

  8. Slide 8: Bird-In Hand: Feasibility Study June 2020

    Bird-In Hand: Feasibility Study June 2020 Positioned to deliver outstanding returns for investors Key financial metrics Feasibility Study 20205 ➢ Low costs, strong margin: All in sustaining Commodity Price Metrics1 costs of approximately A$959/oz, positions Gold price – LOM average US$1,500/oz (A$2,

  9. Slide 9: Kapunda ISR Copper Project

    Kapunda ISR Copper Project Terramin with its joint venture partner, Environmental Copper Recovery Pty Ltd (ECR) are investigating the potential development of a low cost insitu recovery (ISR) copper project near Kapunda, South Australia, approximately 90 km north of Adelaide. To date, all the field

  10. Slide 10: South Gawler Ranges Project

    South Gawler Ranges Project The South Gawler Ranges Project (“SGRP”) is an underexplored, highly prospective multi-commodity asset with potential to host significant Iron Oxide Copper Gold (IOCG) mineralisation alongside epithermal Ag-Pb-Zn deposits, tin-tungsten and copper gold skarns along with po

  11. Slide 11: Terramin

    Terramin 11

  12. Slide 12: A: Competent Person Statements

    A: Competent Person Statements Competent Person Statement The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr Eric Whittaker (Tala Hamza, Menninnie, Angas and Kapunda Resources and Exploration Results) and Mr Dan Brost (Bird