Terramin Australia Limited · ASX:TZN
Terramin Australia — Corporate Update (October 2017)
25 slides from Terramin Australia's corporate update, Oct 11, 2017

Slide 1: Bird in Hand Gold Project Project Update
TERRAMIN AUSTRALIA LIMITED Bird in Hand Gold Project Project Update Joe Ranford, General Manager – Chief Technical Officer, 11th October 2017

Slide 2: WCCC Briefing Content
WCCC Briefing Content This briefing will present update on; Corporate Operations Community Input Concept – Bird In Hand Gold Project – Site Plan – Visual Amenity – Underground Operations – Haulage Route & Traffic – Water TERRAMIN AUSTRALIA LIMITED SLIDE No. 2

Slide 3: Corporate update
Corporate update Terramin recently entered a share placement to raise ͌ $8 million – October 2017 High level of interest in Tala Hamza Zinc Project and Bird in Hand Gold project BIHGP Mining Lease Application continues to be drafted Feedback from WCCC, focus groups and drop in days has been

Slide 4: Proposed Bird in Hand Gold Project Concept
Proposed Bird in Hand Gold Project Concept Establish a small low impact underground mine to access the gold bearing rock at Woodside Transport the ore to Angas processing plant (32km South) Produce a gold concentrate for domestic or export market Haulage component Concept peak production r

Slide 5: Community Input - Outcomes
Community Input - Outcomes Outcomes – developed Project objectives from community viewpoints expressed through consultation. Mining Lease Application: Creates commitment to deliver on Outcomes. Program for Env. Protection and Rehab. (PEPR): Legal mechanism for demonstrating how we are achievin

Slide 6: Outcome examples to date
Outcome examples to date Example: No loss of productivity on properties surrounding the mining lease from dust generated by construction, mining or closure activities. Example: No adverse impacts on soil quality within the mining lease that could compromise the post mining land use Example: No adver

Slide 7: Community Engagement Process in Summary
Community Engagement Process in Summary Identified Operate as project aspects per CEP Develop Engage with Outcomes and Review and the Test with update CEP community Stakeholders Report on Review new Engagement information and experiences TERRAMIN AUSTRALIA LIMITED SLIDE No. 7

Slide 8: Summary of Community Engagement Activities
Summary of Community Engagement Activities Meetings with neighbours, community members, stakeholders CSIRO Drop-in Days surveys Focus Newsletters Groups Mining Meetings with WCCC Lease government Application and councils TERRAMIN AUSTRALIA LIMITED SLIDE No. 8

Slide 9: Site Plan update #1
Site Plan update #1 Outcome: The form, contrasting aspects and reflective aspects of mining structures are visually softened to blend in with the surrounding landscape. Update: Area required for water treatment smaller on current design iteration Community feedback on site design early – resul

Slide 10: Role of Strategic Visual Amenity Plan
Role of Strategic Visual Amenity Plan Identify viewpoints Review and outline landscape character Built and Natural Building materials and colour palette for project Style of built structures Informs vegetation type and density Provides Impact Objectives for Design Landscape bunding p

Slide 11: Viewpoint – Strategic Visual Amenity complete
Viewpoint – Strategic Visual Amenity complete Viewpoints surrounding public roadways places of business where views to the project site are visible Oxigen reviewed views of the project site from private residences. Views were identified with owners or tenants based on relative level of v

Slide 12: Role of Landscape Bunding
Role of Landscape Bunding TERRAMIN AUSTRALIA LIMITED SLIDE No. 12

Slide 13: Role of Landscape Bunding
Role of Landscape Bunding Site designed to limit line of sight from neighbouring properties Below is an concept example – not the BIHG Project Actual viewpoints next TERRAMIN AUSTRALIA LIMITED SLIDE No. 13

Slide 14: Site Plan update #2
Site Plan update #2 Outcome: The form, contrasting aspects and reflective aspects of mining structures are visually softened to blend in with the surrounding landscape. By lowering operational area behind bund, site activities aren’t visible from public viewpoints or residences. TERRAMIN AUSTRAL

Slide 15: Visual Amenity Projections Completed for Operations - Petaluma
Visual Amenity Projections Completed for Operations - Petaluma TERRAMIN AUSTRALIA LIMITED SLIDE No. 15

Slide 16: Visual Amenity Projections Completed for Operations – BIH Winery
Visual Amenity Projections Completed for Operations – BIH Winery TERRAMIN AUSTRALIA LIMITED SLIDE No. 16

Slide 17: Visual Amenity Projections Completed for Operations - Artwine
Visual Amenity Projections Completed for Operations - Artwine TERRAMIN AUSTRALIA LIMITED SLIDE No. 17

Slide 18: Where are the underground workings
Bird in Hand Gold Project Where are the underground workings TERRAMIN AUSTRALIA LIMITED SLIDE No. 18

Slide 19: Where are the underground workings
Bird in Hand Gold Project Where are the underground workings TERRAMIN AUSTRALIA LIMITED SLIDE No. 19

Slide 20: Mining Cycle: What happens underground
Mining Cycle What happens underground TERRAMIN AUSTRALIA LIMITED SLIDE No. 20

Slide 21: Underground Cycle - Backfilling
Underground Cycle - Backfilling Small voids Small blasts More control for groundwater Backfill creates long term geotechnical stability TERRAMIN AUSTRALIA LIMITED SLIDE No. 21

Slide 22: Haulage Route Proposed + Traffic Management
Haulage Route Proposed + Traffic Management TERRAMIN AUSTRALIA LIMITED SLIDE No. 22

Slide 23: Water Policy Update
Water Policy Update Proposal: Water removed by the mining operation is returned to the system at same or better quality (via MAR) to prevent impacts on existing users and water dependent ecosystems. Outcome: No adverse impact to the supply or quality of water by the mining operations to existing

Slide 24: Terramin Activities | August - October
Terramin Activities | August - October Outcome: Terramin is committed to working with communities where we operate to maximise the benefits and minimise the impacts resulting from our activities Woodside Community Drop in Day – 25th September Newsletter Courier and Southern Argus insert Post

Slide 25: Website Update
Website Update Terramin have added a range of Assessment Reports Noise Dust Vibration Traffic Visual Amenity Discussion of these at next meeting – focus on noise, traffic, dust, vibration TERRAMIN AUSTRALIA LIMITED SLIDE No. 25
Source: Internet Archive copy of terramin.com.au
More decks from Terramin Australia Limited
Shareholder Meeting (May 2026)15 slides · May 2026
Shareholder Meeting (May 2025)12 slides · May 2025
Shareholder Meeting (May 2022)12 slides · May 26, 2022
Investor Presentation (October 2019)23 slides · Oct 31, 2019
Investor Presentation (October 2019)22 slides · Oct 30, 2019
Technical Presentation (June 2019)20 slides · June 2019