Terramin Australia Limited · ASX:TZN

Terramin Australia — Corporate Update (August 2018)

17 slides from Terramin Australia's corporate update, August 2018

  1. Slide 1: Terramin General Update

    Slide 1: Terramin General Update

    Terramin General Update Matt Daniel – Environment and Community Superintendent Angas Zinc Mine 1

  2. Slide 2: Angas Zinc Mine

    Slide 2: Angas Zinc Mine

    Angas Zinc Mine  New CEO and CFO  Richard Taylor (CEO), Simon Iacopetta is our new CFO  Attended SA Investment in Mining and Exploration Conference – see here for Richards presentation - https://www.terramin.com.au/category/asx- announcements/  Newsletter released includes update on Terramin’s g

  3. Slide 3: University of Adelaide Students

    Slide 3: University of Adelaide Students

    University of Adelaide Students  Environmental Engineering students  Soil study  Hydrochar for soil amendment from hydrothermal carbonisation of biomass  Grapemark and micro-algy  Native grasses

  4. Slide 4: Terramin - Projects

    Slide 4: Terramin - Projects

    Terramin - Projects  Bird in Hand / Angas Processing Facility  Draft AZM MPL being reviewed by DEM for checks against Ministerial Determination prior to formal lodgment with BIH ML  Managed Aquifer Recharge bore drilling at BIH has commenced this week – still waiting for guidance on testwork comp

  5. Slide 5: Quarterly Environment Report

    Slide 5: Quarterly Environment Report

    Quarterly Environment Report Matt Daniel – Environment and Community Superintendent 5

  6. Slide 6: Activities over Q1

    Slide 6: Activities over Q1

    Activities over Q1  Care and Maintenance air and water monitoring  Regional groundwater  Angas River  Regional and onsite dust monitoring  Draft MPL for Angas Processing Facility completed and sent to DEM for checks against Ministerial Determination  Hydrostor have been onsite for planning and

  7. Slide 7: Angas Zinc Mine – Quarterly Environment Report

    Slide 7: Angas Zinc Mine – Quarterly Environment Report

    Angas Zinc Mine – Quarterly Environment Report No non-compliances against Lease Conditions for Quarter 2, 2018  Continued instances of higher dust offsite  Agricultural activities through the region  Wind direction towards the North East  All higher dust (Total Insoluble Matter) located north-we

  8. Slide 8: Melaleuca lanceolata Healthy resident water birds

    Slide 8: Melaleuca lanceolata Healthy resident water birds

     Melaleuca lanceolata  Healthy resident water birds

  9. Slide 9: Tailings Storage Facility

    Slide 9: Tailings Storage Facility

    Tailings Storage Facility  Surface area remained approximately 7000m2 for Q2  Water level is approximately 68.1m RL (compliance is 74.2m RL)  Seepage drains remain at approx. ≈ 1L/min TSF Drain Flow Rates 3.5 3.0 Flow Rate (Litres/minute) 2.5 2.0 1.5 1.0 0.5 0.0 Mar-2016 May-2016 Jun-2016 Mar-201

  10. Slide 10: Newsletter released

    Slide 10: Newsletter released

    Newsletter released  Information on  New strategy  New CEO  Drilling at Bird in Hand  Water test work

  11. Slide 11: Questions?

    Slide 11: Questions?

    Questions?

  12. Slide 12: SCCC - Mining Regulation Report

    Slide 12: SCCC - Mining Regulation Report

    SCCC - Mining Regulation Report Mark Stewart (Dept. for Energy & Mining) Strathalbyn 23 August 2018

  13. Slide 13: QER

    Slide 13: QER

    QER • DEM reviewed & accept the Q2 2018 QER • Note: Care and Maintenance Plan reference to be updated • DEM completed review of Annual Compliance Report • No significant concerns raised

  14. Slide 14: Hydrostor

    Slide 14: Hydrostor

    Hydrostor • DEM & EPA met with Golder (Hydrostor Consultant) on 16 July 2018 • Golder presented progress on Development Application (DA) in relation to Mine Closure Plan requirements • DEM & EPA provided feedback on details to be addressed in DA submission to ensure clarity is provided where there i

  15. Slide 15: Mining Act Review

    Slide 15: Mining Act Review

    Mining Act Review • On 2nd August the Statutes Ammendments (Mineral Resources) Bill 2018 was introduced to Parliament • More information: http://minerals.statedevelopment.sa.gov.au/mining/ leading_practice_mining_acts_review

  16. Slide 16: DEM Office Relocation

    Slide 16: DEM Office Relocation

    DEM Office Relocation • On 13 August DEM moved to 11 Waymouth Street • Mining Reg on Level 7 – Visitors to Reception (Level 4) • My desk shown below during unpacking (looks over back of post office)

  17. Slide 17: Questions? - Contact

    Slide 17: Questions? - Contact

    Questions? - Contact Mark Stewart – Senior Mine Regulator Department for Energy and Mining 11 Waymouth Street Adelaide, South Australia 5000 GPO Box 320 Adelaide, South Australia 5001 T: +61 8 8429 2450 M: +61 475 819 262 E: Mark.Stewart2@sa.gov.au