Global Lithium Resources Ltd. · ASX:GL1

Global Lithium Resources — Future Facing Commodities Conference (March 2024)

17 slides from Global Lithium Resources's conference presentation, Mar 26, 2024

  1. Slide 1: Global Lithium Resources - Manna Lithium Project

    For personal use only GLOBAL LITHIUM RESOURCES Manna Lithium Project March 2024 ASX:GL1 1

  2. Slide 2: Important Notice and Disclaimer

    Important Notice and Disclaimer These presentation materials and the accompanying verbal presentation (together, the Presentation Materials) have been • involve known and unknown risks and uncertainties that could cause actual events or results to differ materially from estimated prepared by Global

  3. Slide 3: Strategic Highlights

    Strategic Highlights Multi-asset development JORC compliant Tier 1 For personal use only optionality resources Jurisdiction • Combined Mineral Resource of • Wholly owned 2 JORC compliant • Located in world’s best mining 54Mt @ 1.09% Li2O 1 lithium resources in Australia jurisdiction of Western Austr

  4. Slide 4: GL1 Corporate Snapshot

    GL1 Corporate Snapshot (22 March 2024) ASX share price performance Millions 14 $3.5 Market Cap Share Price Shares on issue 12 $3.0 For personal use only A$140m A$0.54 260m 10 $2.5 Share Price (A$) Volume (m) 8 $2.0 Options1 Cash2 Equity in ASX:KAI3&4 6 $1.5 12.7m A$32m A$3.7m (10%) 4 $1.0 2 $0.5 0 $

  5. Slide 5: GL1 Strategic Shareholder

    GL1 Strategic Shareholder • Canmax (formerly Suzhou TA&A) is listed on the Shenzhen Stock For personal use only Exchange with a market cap of US$2.6bn. • Canmax is a globally integrated leading lithium chemicals producer with key customers including LG Energy Solutions, SKOn, Tesla, Ford & Mercedes

  6. Slide 6: Manna Lithium Project

    MANNA LITHIUM PROJECT For personal use only • 100% owned project • Tier 1 mining jurisdiction • Outcropping spodumene bearing pegmatite • Current Indicated & Inferred Mineral Resource of 36.0Mt @ 1.13% Li O 2 6

  7. Slide 7: World Class Location

    World Class Location For personal use only Major Mines & City of Kalgoorlie- Access to Railway Projects Boulder Access Road High-speed Data Utilities 1 Company public information 7

  8. Slide 8: Exploration Summary

    Exploration Summary Exploration For personal use only • Two years of intensive exploration: o CY22 – 46,000m1 o CY23 – 60,000m2 o Current MRE (36.0Mt @ 1.13%) based on historical and CY2022 drilling3 • CY23 infill drilling to increase confidence in resource classification • CY24 extensional drilling

  9. Slide 9: Exploration - Upside Ahead

    Exploration - Upside Ahead Results received from over 60,000m of RC and Diamond Drilling completed in CY231 For personal use only • MRE update underway, expected Q2 CY24, to be included in Manna DFS • Further high-grade results received from CY23 resource infill and expansion drilling2 • Best drill

  10. Slide 10: Definitive Feasibility Study - Advancing

    Definitive Feasibility Study - Advancing • DFS and related metallurgical studies well advanced For personal use only • Completion of DFS expected CY24 and to incorporate: • Updated MRE including all CY23 drilling program results • Detailed open pit and underground mine schedules • Optimised metallur

  11. Slide 11: Metallurgy – Excellent Lithium Recoveries

    Metallurgy – Excellent Lithium Recoveries • Manna process flowsheet well defined Zone 1 Zone 2 For personal use only • Whole-of-ore (WOO) flotation flowsheet Result Unit High Grade Low Grade achieving 70-75% lithia recovery Prior Prior Updated Prior Updated1 Updated1 • This increase in lithia recove

  12. Slide 12: Approvals and Permitting - Well Advanced

    Approvals and Permitting - Well Advanced Environmental • All flora and fauna surveys completed with no For personal use only significant impacts identified Native Title and Heritage • All heritage surveys completed with no culturally significant sites identified • Native Title Mining Agreement (NTMA

  13. Slide 13: Manna Project

    For personal use only Manna Project 13

  14. Slide 14: 2024 Key Milestones - De-risked and Disciplined

    2024 Key Milestones - De-risked and Disciplined Well positioned to capture significant upside with anticipated lithium market recovery For personal use only Global Lithium Resources CY24 Metallurgical Test Results / Ore Sorting Trials Mineral Resource Estimate (MRE) Update Environmental / Native Tit

  15. Slide 15: Marble Bar Lithium Project

    MARBLE BAR For personal use only LITHIUM PROJECT • 100% owned • Tier 1 mining jurisdiction • Inferred Mineral Resource of 18.0Mt @ 1% Li2O 15

  16. Slide 16: Highly Prospective Geological Setting

    Highly Prospective Geological Setting For personal use only Geology Resource • Spodumene bearing pegmatite • Inferred Mineral Resource of hosted in greenstone and 18.0Mt @ 1.0% Li2O3 granite contact • Lithium mineralisation in drilling • Similar geological settings to identified over 15km nearby Pil

  17. Slide 17: Contact Us

    Contact Us For personal use only RON MITCHELL au.linkedin.com/company/ Managing Director global-lithium-resources +61 8 6103 7488 info@globallithium.com.au @Global_Lithium BEN CREAGH Subscribe to our mailing list at: Media and Investor Relations globallithium.com.au +61 (0) 417 464 233 benc@nwrcommu

Global Lithium Resources — Future Facing Commodities Conference (March 2024) on 6ix