27 slides from Aldridge Minerals's shareholder meeting presentation, May 2013

Slide 1: Mario Caron, President & CEO
Mario Caron, President & CEO Aldridge Minerals Inc. TSX-V: AGM May 2013 1

Slide 2: 30M Tonnes Gold, Silver, Copper, Lead, Zinc
30M Tonnes GOLD, SILVER, COPPER, LEAD, ZINC KNOWN MINERALIZED OUTCROPS <2KM FROM DEPOSIT 2

Slide 3: Yenipazar Location
Y E N I PA Z A R LOCATION Istanbul Inmet Cayeli Koza Gold Alamos Gold Mastra Agi Dag Ankara Alacer YENIPAZAR Copler Eldorado Eldorado Kayseri Efemcukuru Kisladag Iskenderun TURKEY IS EMERGING AS A MAJOR MINING AREA 3

Slide 4: Significant Milestones
YENIPAZAR SIGNIFICANT MILESTONES 2010 2011 2012 2013 § PEA – Dec. 2010 § Feasibility study § Diamond § Feasibility study ini?ated twinning § Metallurgical § Updated § Project financing drilling resource § Geotechnical § Extensive drilling metallurgical testwork MAJOR ACHIEVEMENTS TOWARDS PRO

Slide 5: Aerial View – Ideal for Open Pit
Y E N I PA Z A R AERIAL VIEW – IDEAL FOR OPEN PIT WELL-DEFINED WITH OUTCROPS UPSIDE POTENTIAL SITE PLAN OVERLAY EGLENCE VILLAGE DEPOSIT 1.7 km strike Himmetdede rail station (74km) 5

Slide 6: Feasibility Study: Key Assumptions
FEASIBILITY STUDY: KEY ASSUMPTIONS § Open Pit Mine § EPCM basis § Throughput: 2.5M TPA § Owner-‐operated mining Metal Pricing Feasibility 3 Year Study Trailing* Gold ($/oz) $1,450 $1,531 Silver ($/oz) $28 $30 Copper ($/lb) $3.00 $3.70 Lead ($/lb) $0.95 $1.00 Zinc ($/lb) $0.90 $0.94 METAL PRICIN

Slide 7: Resource & Reserve Estimates
RESOURCE & RESERVE ESTIMATES Resource EsVmate: November 26, 2012* Contained Metal Au Ag Cu Pb Zn Au Ag Cu Pb Zn Category Tonnage (g/t) (g/t) (%) (%) (%) (M oz) (M oz) (M lbs) (M lbs) (M lbs) Indicated 29,669,000 0.95 31.3 0.31 1.01 1.47 0.9 29.85 204.8 660.2 961.2 Inferred 369,000 0.47 25.5 0.18 0.9

Slide 8: Capital Cost & Sustaining Capital
CAPITAL COST & SUSTAINING CAPITAL Capital Cost US$ millions Mine Development, Plant & Equipment Mine development $20 Sustaining Capital US$ millions Mine equipment $41 Mining Equipment $22 Process plant equipment $55 Tailings Management $12 Process plant & infrastructure $119 Closure $24 Tailings fa

Slide 9: Operating Cost
OPERATING COST OperaVng Costs* $/tonne of ore Mining** $11.15 Processing $16.36 Tailings/water management $0.36 G&A $1.26 Total OPEX $29.13 SHALLOW OREBODY, OPEN PIT = LOW OPERATING COSTS *LOM average cost. **LOM strip ratio 4.3:1 9

Slide 10: Outline of the Process Flowsheet
OUTLINE OF THE PROCESS FLOWSHEET Crushing PROVEN TECHNOLOGY Grinding and Classifica?on Gravity Circuit Flota?on Tail Gold Leaching Cu Flota?on (Doré) Pb Flota?on Zn Flota?on 10

Slide 11: Sulphide Recoveries
SULPHIDE RECOVERIES* Copper / Total Lead / Silver Zinc Metal Doré Gold Recoveries Concentrate Concentrate Concentrate Gold 88% 59% 11% 15% 3% Silver 84% 4.50% 15% 54% 10.50% Copper 72% 72% Lead 72% 72% Zinc 56% 56% SIGNIFICANT IMPROVEMENT SINCE PEA *Sulphide ore makes up 80% of reserves. 11

Slide 12: Production
PRODUCTION Gold (oz) Silver (M oz) Copper (M lbs) Lead (M lbs) Zinc (M lbs) Life of Mine 696,482 21.2 120.1 368.0 563.8 Average Annual1 62,642 1.9 11.2 33.8 56.3 1Years 2 – 10. 12

Slide 13: Economic Highlights
ECONOMIC HIGHLIGHTS Pre-‐NPI, Acer-‐NPI, Acer-‐NPI, Pre-‐tax Pre-‐Tax Acer-‐Tax IRR 26.5% 24.4% 23.7% NPV (0%) $908M $816M $782M NPV (7%) $438M $381M $361M Payback (years) 2.6 2.7 2.8 ROBUST ECONOMICS + UPSIDE POTENTIAL 13

Slide 14: Development Timeline
DEVELOPMENT TIMELINE 2013 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 H1 H2 H1 H2 Feasibility Study EIA / ESIA Land Acquisi?on Permigng Project Finance Award EPCM Detailed Engineering Construc?on Commissioning/Ramp Up Produc?on Stakeholder Engagement 14

Slide 15: Strategic Local Partner: ANT Holding
STRATEGIC LOCAL PARTNER: ANT HOLDING § Private holding company with interests in media, engineering, construc?on § $11.2 million investment – April 2012 § $4.5 million investment – February 2013 § Strong rela?onships with local banking & government contacts 30% OWNERSHIP OF ALDRIDGE ACCELERATES

Slide 16: Experienced Board & Management
EXPERIENCED BOARD & MANAGEMENT BOARD MANAGEMENT § Barry Hildred, Chairman § Mario Caron, § Daniella Dimitrov President & CEO & Director § John F. Cook § Robbert Borst, § Ed Guimaraes VP Project Development § Ahmet Tacyildiz § Jim O’Neill, CFO § Hande Tacyildiz § Dr. Mar?n Oczlon, VP Explor

Slide 17: Capital Structure
CAPITAL STRUCTURE* Shares Outstanding: 84.7 million Fully diluted: 90.0 million Director/Insider ownership: ~36% 52 week range: $0.28 -‐ $0.71 Recent price: $0.33 Market Cap: $28 million Top ins?tu?onal holders: Mavi, Goodman, US Global, Colonial, Spron Analyst coverage: Paradigm Capital Clarus Sec

Slide 18: Significant Upside Potential
SIGNIFICANT UPSIDE POTENTIAL § ExploraVon § Excellent poten?al to further expand the resource § Limited blue sky explora?on to date on large land package § Metallurgy § Poten?al to increase gold, VMS Deposits appear in clusters silver, and lead recoveries in sulphide ore 100km2 Land Package 18

Slide 19: Investment Highlights
INVESTMENT HIGHLIGHTS § Aldridge brings together robust economics & blue-‐sky poten?al § Polymetallic project = natural hedge § Located in safe, mining friendly jurisdic?on § Experienced management team § Strategic local partner & suppor?ve shareholders § Catalysts for new value crea?on ADDIN

Slide 20: Aldridge Minerals Inc.
MINERALS INC. 20

Slide 21: Recoveries by Ore Type
RECOVERIES BY ORE TYPE Total Copper / Gold Lead / Silver Zinc Metal Doré Recoveries Concentrate Concentrate Concentrate Gold 88% 59% 11% 15% 3% Sulphide Silver 84% 4.50% 15% 54% 10.50% 80% Copper 72% 72% Of Reserves Lead 72% 72% Zinc 56% 56% Gold 75% 53% 4% 10% 8% Copper-‐ Silver 52% 6% 13% 21% 12%

Slide 22: Sensitivities
SENSITIVITIES PROJECT IS ECONOMICALLY VIABLE ACROSS MULTIPLE SCENARIOS 22

Slide 23: Economic Considerations
ECONOMIC CONSIDERATIONS § Turkey Net Profit Royalty: 1.6%1 § Alacer Net Profit Interest: 6% -‐ 10% § Significant Tax IncenVves STABLE & PREFERABLE TAX JURISDICTION 1Included in all three economic scenarios. 23

Slide 24: Turkey Incentive Plan by Region
TURKEY INCENTIVE PLAN BY REGION IncenVve Component 1 2 3 4 5* 6 VAT Exemp?on P P P P P Customs Duty Exemp?on P P P P P Investment Contribu?on 15 20 25 30 40 50 Rate (%) Tax Rate Reduc?on (%) 50 55 60 70 80 90 Exemp?on on Social 2 yrs 3 yrs 5 yrs 6 yrs 7 yrs 10 yrs Security Premium Supp

Slide 25: Yenipazar Property Map
YENIPAZAR PROPERTY MAPProperty Map Yenipazar 25

Slide 26: Longitudinal Section
LONGITUDINAL SECTION om 200m 400m 600m 800m 1000 m 1200 m (__)_ Neogene cover - Marly clay, occasionally sandy. Calcrete layer on top. (1 Schist halo (meta-sediments/tuffites) (|) Gneiss (intermediate to acidic footwall meta-volcanics) - intercalating schist probably due to low-angle thrusting — Bou

Slide 27: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Certain statements in this presenta?on cons?tute forward-‐looking statements or forward-‐looking informa?on within the meaning of applicable securi?es laws (“forward-‐looking statements”). Any statements that express or involve discussions with respect to predic?ons, ex
Source: Internet Archive copy of aldridgeminerals.ca