Aldridge Minerals Inc

Aldridge Minerals — Investor Presentation (July 2015)

23 slides from Aldridge Minerals's investor presentation, July 2015

  1. Slide 1: Corporate Presentation July 2015

    Slide 1: Corporate Presentation July 2015

    Corporate Presentation July 2015

  2. Slide 2: Corporate Highlights

    Slide 2: Corporate Highlights

    Corporate Highlights 100% Owner of Yenipazar Project in Central Turkey • Open pit polymetallic VMS deposit • Highly robust economics • All key Central and Local permits secured • Turkey is a favourable mining jurisdiction Deep expertise in Turkey • CEO: Han Ilhan Turkish-American engineer based in A

  3. Slide 3: Project Highlights – Yenipazar

    Slide 3: Project Highlights – Yenipazar

    Project Highlights – Yenipazar Polymetallic VMS deposit (open pit) • Gold, Silver, Copper, Lead, Zinc = Revenue diversification • Base case revenue split: 55% precious, 45% base1 • Spot revenue split: 55% precious, 45% base2 Low CAPEX and high operating margins • Excellent access to existing infrast

  4. Slide 4: Comparables – IRR / CAPEX / Gold Grade

    Slide 4: Comparables – IRR / CAPEX / Gold Grade

    Comparables – IRR / CAPEX / Gold Grade* Peers: P/NAV 1 60 0.9 0.8 0.7 0.6 Avg. 0.48 True Gold 50 0.5 Karma Pilot 0.4 Halilaga 0.3 0.2 0.1 After-tax IRR (%) 40 Dalradian Curraghinalt 0 Romarco Haile Midway Aldridge (Pan) Yenipazar 30 Guyana Rubicon Lydian Aurora Phoenix Alacer (Amulsar) Copler 20 Exp

  5. Slide 5: Project Highlights – Yenipazar

    Slide 5: Project Highlights – Yenipazar

    Project Highlights – Yenipazar Feasibility Study and Optimization Study Completed • Involved Jacobs Engineering, Promer Engineering (Turkey) and other international consultants • High level of confidence in CAPEX and OPEX with appropriate contingencies All key Central and Local permits secured • EIA

  6. Slide 6: History

    Slide 6: History

    History 2004 • Aldridge founded by two geologists with extensive expertise in Turkey • Aldridge entered into an option agreement with Anatolia Minerals (now Alacer Gold), which owned the Yenipazar project 2005-2013 • Extensive exploration and development program; completed over 70,000 metres of dril

  7. Slide 7: Path-Forward

    Slide 7: Path-Forward

    Path-Forward Land Acquisition (by Q1 2016) • Low quality agricultural land with no resettlement of people • Offering high value proposition of 3X – 4X fair value of the land • Well-established compulsory State land acquisition program with a legal basis in Turkey which mitigates holdout risk Project

  8. Slide 8: Turkey: Favourable Jurisdiction

    Slide 8: Turkey: Favourable Jurisdiction

    Turkey: Favourable Jurisdiction Place - Strong Support for Mining in Turkey • Mining sector GDP up 4.6X in last 10 years (from $2.6B to $12B), objective of $15B by 2023. • No. 1 gold producer in Europe achieved in less than 15 years; international companies operating successfully for 10+ years such

  9. Slide 9: Turkey: Growth in FDI

    Slide 9: Turkey: Growth in FDI

    Turkey: Growth in FDI FDI Inflow to Turkish Mining Total FDI Inflow to Turkey Sector $18,000 $500 $16,000 $14,000 $400 $12,000 USD (M) USD (M) $300 $10,000 $8,000 $200 $6,000 $4,000 $100 $2,000 $- $- 2009 2010 2011 2012 2013 2014 2009 2010 2011 2012 2013 2014 Source: Investment Support and Promotion

  10. Slide 10: Ideal Site Conditions

    Slide 10: Ideal Site Conditions

    Ideal Site Conditions Outcrops 100 sq. km concession PLANT EGLENCE PIT VILLAGE TMF TAILINGS CLEAN Waste Rock WRD BEACH WATER Dump (WRD) pit POND backfill (starts Year 5) 1 km TAILINGS POND EARNING SOCIAL LICENCE TO OPERATE TEN YEARS ESTABLISHING STRONG COMMUNITY RELATIONS www.aldridgeminerals.ca 10

  11. Slide 11: Geology

    Slide 11: Geology

    Geology www.aldridgeminerals.ca 11

  12. Slide 12: Yenipazar: 43-101 Reserves

    Slide 12: Yenipazar: 43-101 Reserves

    Yenipazar: 43-101 Reserves Reserve Estimate: April 15, 2014 Contained Metal Probable Au Ag Cu Pb Zn NSR Au Ag Cu Pb Zn Tonnage Reserves (g/t) (g/t) (%) (%) (%) ($/t) (M oz) (M oz) (M lbs) (M lbs) (M lbs) Oxide 3,214,000 0.83 23.2 0.24 0.96 0.54 42.24 0.09 2.40 16.67 68.02 38.31 Cu-Enriched 2,547,000

  13. Slide 13: Yenipazar: Outline of Process Flowsheet

    Slide 13: Yenipazar: Outline of Process Flowsheet

    Yenipazar: Outline of Process Flowsheet Crushing SIMPLE & PROVEN TECHNOLOGY Grinding and Classification Gravity Circuit Flotation Tail Gold Leaching Cu Flotation (Doré) Pb Flotation Zn Flotation TOTAL RECOVERIES - SULPHIDE ZONE YEARS 1-4: Au: 82% Ag: 72% Cu: 75% Pb: 73% Zn: 62% YEARS 5-11: Au: 79% A

  14. Slide 14: Yenipazar: Capital & Operating Costs

    Slide 14: Yenipazar: Capital & Operating Costs

    Yenipazar: Capital & Operating Costs Pre-Production Capital Costs (CAPEX) in millions HIGH MARGIN: DIRECT Pre-production development $20 NSR PER TONNE: $83.24 Mine equipment $0 Life of Mine Operating Costs1 Process plant and equipment $63 $ Total $/tonne Tailings & waste rock dump $12 (millions) of

  15. Slide 15: Revenue and Cash Flow

    Slide 15: Revenue and Cash Flow

    Revenue and Cash Flow EBITDA by Year 200,000,000 180,000,000 AVERAGE EBITDA PER YEAR: $84 million over 12 year mine life 160,000,000 140,000,000 EBITDA (USD) 120,000,000 100,000,000 80,000,000 60,000,000 Production 40,000,000 20,000,000 Life of Average - Mine Annual 1 2 3 4 5 6 7 8 9 10 11 12 Year G

  16. Slide 16: Corporate Capital Structure

    Slide 16: Corporate Capital Structure

    Corporate Capital Structure Shares Outstanding: 107.0 million Stock Options: 8.3 million (avg. price C$0.42) Warrants: 10.6 million (avg. price C$1.16) Fully diluted: 125.8 million Director/Management ownership: 3.0% 52 week range: C$0.15 - C$0.40 Recent price: C$0.19 Market Cap: C$20.3 million P/NA

  17. Slide 17: Experienced Team: Diverse Skill Set

    Slide 17: Experienced Team: Diverse Skill Set

    Experienced Team: Diverse Skill Set BOARD MANAGEMENT Barry Hildred, Chairman Han Ilhan, President & CEO CEO & Director of Aquila Resources; founder of The Equicom Group. Professional engineer; 26 years at URS leading global mining practice. Baran Baycan Robbert Borst, VP Project Development Founder

  18. Slide 18: Aldridge Differentiators

    Slide 18: Aldridge Differentiators

    Aldridge Differentiators Yenipazar Project: • Highly robust polymetallic project with strong cash flows and downside protection • All key Central and Local permits secured • Land acquisition proceeding as planned within defined framework Deep expertise in Turkey • Local CEO, development team, and a

  19. Slide 19: Appendix

    Slide 19: Appendix

    Appendix David Carew Director Corporate Development & IR T: +1 (416) 477-6984 E: dcarew@aldridgeminerals.ca DEVELOPING VALUE  SUSTAINING GROWTH 19

  20. Slide 20: Project Background

    Slide 20: Project Background

    Project Background Owner: Aldridge Minerals Inc. (TSX-V:AGM) – 100% (Alacer Gold Corp. maintains a NPI) Project Location: Tethyan mineral belt, Central Turkey Geology: Metamorphosed volcanogenic massive sulphide Mining Operation: Conventional open pit utilizing contract mining Strip Ratio: 4.3 : 1 (

  21. Slide 21: Yenipazar: Recoveries by Ore Type

    Slide 21: Yenipazar: Recoveries by Ore Type

    Yenipazar: Recoveries by Ore Type Total Copper Lead Zinc Metal Doré Recoveries Concentrate Concentrate Concentrate Gold 82% 71.5% 9% 0% 1.5% Silver 72% 2.5% 9.5% 50% 10% Sulphide Copper 75% 75% Yrs 1 – 4 Lead 73% 73% Zinc 62% 62% Gold 79% 65% 10% 0% 4% Sulphide Silver 76% 4% 10% 51% 11% Yrs 5 – 11 C

  22. Slide 22: Yenipazar: Resource & Reserve Estimate

    Slide 22: Yenipazar: Resource & Reserve Estimate

    Yenipazar: Resource & Reserve Estimate Resource Estimate: November 26, 2012 Contained Metal Au Ag Cu Pb Zn Au Eq Au Ag Cu Pb Zn AuEq Category Tonnage (g/t) (g/t) (%) (%) (%) (g/t) (M oz) (M oz) (M lbs) (M lbs) (M lbs) (M oz) Indicated 29,669,000 0.95 31.3 0.31 1.01 1.47 2.42 0.90 29.85 204.8 660.2 9

  23. Slide 23: Cautionary Statement

    Slide 23: Cautionary Statement

    Cautionary Statement Certain statements in this presentation constitute forward-looking statements or forward-looking information within the meaning of applicable securities laws (“forward-looking statements”). Any statements that express or involve discussions with respect to predictions, expectati

Source: Internet Archive copy of aldridgeminerals.ca