Slide 1: Aldridge Minerals Inc. AGM Presentation
Barry Hildred, Chairman Aldridge Minerals Inc. TSX-V: AGM September 2013 1

Slide 2: 30M Tonnes Gold, Silver, Copper, Lead, Zinc
30M Tonnes GOLD, SILVER, COPPER, LEAD, ZINC KNOWN MINERALIZED OUTCROPS <2KM FROM DEPOSIT 2

Slide 3: Aldridge: The Exception to the Rule?
ALDRIDGE: THE EXCEPTION TO THE RULE? A"er-‐Tax A"er-‐Tax Payback Cash on Hand1 NAV/Share2 NPV7% IRR $361M 23.7% 2.8 Years C$11.4M $4.01 CASHED UP JUNIOR ROBUST PROJECT MANAGEABLE SIZE 1 As at June 30, 2013 2 A/er-‐tax NPV 3 7% of $361M / 90.0M fully diluted shares outstanding

Slide 4: Location
Y E N I PA Z A R LOCATION Istanbul Inmet Cayeli Koza Gold Alamos Gold Mastra Ağı Dağı Ankara Alacer YENIPAZAR Copler Eldorado Eldorado Kayseri Efemcukuru Kisladag Iskenderun TURKEY IS EMERGING AS A MAJOR MINING AREA 4

Slide 5: Aerial View – Ideal for Open Pit
Y E N I PA Z A R AERIAL VIEW – IDEAL FOR OPEN PIT CAMP OUTCROPS UPSIDE POTENTIAL PLANT EGLENCE VILLAGE PIT WRD TMF EXCELLENT INFRASTRUCTURE Himmetdede rail station (74km) 5

Slide 6: Feasibility Study: Key Assumptions
FEASIBILITY STUDY: KEY ASSUMPTIONS § Open Pit Mine § EPCM basis § Throughput: 2.5M TPA § Owner-‐operated mining Metal Pricing Feasibility Spot* Study Gold ($/oz) $1,450 $1,325 Silver ($/oz) $28 $22 Copper ($/lb) $3.00 $3.20 Lead ($/lb) $0.95 $0.95 Zinc ($/lb) $0.90 $0.83 * As at September 12, 2

Slide 7: Resource & Reserve Estimates
RESOURCE & RESERVE ESTIMATES Resource Es\mate: November 26, 2012* Contained Metal Au Ag Cu Pb Zn Au Ag Cu Pb Zn Category Tonnage (g/t) (g/t) (%) (%) (%) (M oz) (M oz) (M lbs) (M lbs) (M lbs) Indicated 29,669,000 0.95 31.3 0.31 1.01 1.47 0.9 29.85 204.8 660.2 961.2 Inferred 369,000 0.47 25.5 0.18 0.9

Slide 8: Capital & Operating Costs
CAPITAL & OPERATING COSTS Capital Cost1 $ millions $/tonne Opera\ng Costs2 Mine Development, Plant & Equipment of ore Mining3 $11.15 Mine development $20 Processing $16.36 Mine equipment $41 Tailings/water mgmt. $0.36 Process plant equipment $55 G&A $1.26 Process plant & infrastructure $119 Tailings

Slide 9: Outline of the Process Flowsheet
OUTLINE OF THE PROCESS FLOWSHEET Crushing PROVEN TECHNOLOGY Grinding and Classifica[on Gravity Circuit Flota[on Tail Gold Leaching Cu Flota[on (Doré) Pb Flota[on Zn Flota[on 9

Slide 10: Sulphide Recoveries
SULPHIDE RECOVERIES* Copper / Total Lead / Silver Zinc Metal Doré Gold Recoveries Concentrate Concentrate Concentrate Gold 88% 59% 11% 15% 3% Silver 84% 4.50% 15% 54% 10.50% Copper 72% 72% Lead 72% 72% Zinc 56% 56% SIGNIFICANT IMPROVEMENT SINCE PEA *Sulphide ore makes up 80% of reserves. 10

Slide 11: Production
PRODUCTION Gold (oz) Silver (M oz) Copper (M lbs) Lead (M lbs) Zinc (M lbs) Life of Mine 696,482 21.2 120.1 368.0 563.8 Average Annual1 62,642 1.9 11.2 33.8 56.3 1Years 2 – 10. 11

Slide 12: Significant Upside Potential
SIGNIFICANT UPSIDE POTENTIAL § Explora\on § Excellent poten[al to further expand the resource § Limited blue sky explora[on to date on large land package § Metallurgy § Poten[al to increase gold, VMS Deposits appear in clusters silver, and lead recoveries in sulphide ore 100km2 Land Package 12

Slide 13: Development Timeline
DEVELOPMENT TIMELINE 2013 2014 2015 2016 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 H1 H2 H1 H2 Feasibility Study EIA / ESIA Land Acquisi[on Permigng Project Finance Award EPCM Detailed Engineering Construc[on Commissioning/Ramp Up Produc[on Stakeholder Engagement 13

Slide 14: Strategic Local Partner: ANT Holding
STRATEGIC LOCAL PARTNER: ANT HOLDING § Private holding company with interests in media, engineering, construc[on § C$11.2 million investment – April 2012 § C$4.5 million investment – February 2013 § Strong rela[onships with local banking & government contacts 30% OWNERSHIP OF ALDRIDGE ACCELERATE

Slide 15: Experienced Board & Management
EXPERIENCED BOARD & MANAGEMENT BOARD MANAGEMENT § Barry Hildred, Chairman § Robbert Borst, § Daniella Dimitrov VP Project Development § John F. Cook § Serdar Akca, Country Manager § Ed Guimaraes § Jim O’Neill, CFO § Ahmet Tacyildiz § Dr. Mar[n Oczlon, VP Explora:on § Hande Tacyildiz § Mer

Slide 16: Capital Structure
CAPITAL STRUCTURE* Shares Outstanding: 84.7 million Fully diluted: 90.0 million Director/Insider ownership: ~36% 52 week range: C$0.17 -‐ C$0.64 Recent price: C$0.19 Market Cap: C$16 million Top ins[tu[onal holders: Mavi, Goodman, US Global, Colonial Analyst coverage: Paradigm Capital Clarus Securi

Slide 17: Investment Highlights
INVESTMENT HIGHLIGHTS § Aldridge brings together robust economics & blue-‐sky poten[al § Polymetallic project = natural hedge § Safe, mining friendly jurisdic[on § Experienced management team § Strategic local partner & suppor[ve shareholders A"er-‐Tax A"er-‐Tax Payback Cash on Hand NAV/Shar

Slide 18: Aldridge Minerals Inc.
MINERALS INC. 18

Slide 19: Detailed Flowsheet: Crushing and Copper Circuit
DETAILED FLOWSHEET: CRUSHING Yenipazar Property COPPER CIRCUIT Map 19

Slide 20: Detailed Flowsheet: Lead & Zinc Circuits
DETAILED FLOWSHEET: LEADProperty Yenipazar & ZINCMap CIRCUITS 20

Slide 21: Recoveries by Ore Type
RECOVERIES BY ORE TYPE Total Copper / Gold Lead / Silver Zinc Metal Doré Recoveries Concentrate Concentrate Concentrate Gold 88% 59% 11% 15% 3% Sulphide Silver 84% 4.50% 15% 54% 10.50% 80% Copper 72% 72% Of Reserves Lead 72% 72% Zinc 56% 56% Gold 75% 53% 4% 10% 8% Copper-‐ Silver 52% 6% 13% 21% 12%

Slide 22: Longitudinal Section
LONGITUDINAL SECTION om 200m 400m 600m 800m 1000 m 1200 m (__)_ Neogene cover - Marly clay, occasionally sandy. Calcrete layer on top. (1 Schist halo (meta-sediments/tuffites) (|) Gneiss (intermediate to acidic footwall meta-volcanics) - intercalating schist probably due to low-angle thrusting — Bou

Slide 23: Sensitivities
SENSITIVITIES PROJECT IS ECONOMICALLY VIABLE ACROSS MULTIPLE SCENARIOS 23

Slide 24: Turkey Incentive Plan by Region
TURKEY INCENTIVE PLAN BY REGION Incen\ve Component 1 2 3 4 5* 6 VAT Exemp[on P P P P P Customs Duty Exemp[on P P P P P Investment Contribu[on 15 20 25 30 40 50 Rate (%) Tax Rate Reduc[on (%) 50 55 60 70 80 90 Exemp[on on Social 2 yrs 3 yrs 5 yrs 6 yrs 7 yrs 10 yrs Security Premium Supp

Slide 25: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Certain statements in this presenta[on cons[tute forward-‐looking statements or forward-‐looking informa[on within the meaning of applicable securi[es laws (“forward-‐looking statements”). Any statements that express or involve discussions with respect to predic[ons, ex