Gold Terra Resource Corp. · TSXV:YGT
Gold Terra Resource — Investor Presentation (February 2021)
18 slides from Gold Terra Resource's investor presentation, February 2021
Slide 1: Multi-million Ounce Potential in Yellowknife
TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0 Multi-million Ounce Potential in Yellowknife February 2021 Corporate Presentation www.goldterracorp.com
Slide 2: Forward Looking Statement
Forward Looking Statement Statements contained in this presentation that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward-Looking Information") within the meaning of applicable Canadian securities legislation. Forward Looking Informat
Slide 3: Cautionary Statement
Cautionary Statement This presentation does not constitute an offer, advertisement or solicitation for the purchase of securities. Further, this presentation has been prepared by Gold Terra Resources Corp. (“Gold Terra”) management and does not represent a recommendation to buy or sell securities. I
Slide 4: Gold Terra Investing Rationale
• Safe Jurisdiction - Canada • Located in the Heart of Yellowknife, NWT • High-Grade Gold Mineralization • Historic Production of 14 Moz. @ +15 g/t Au • Campbell Shear Structure is + 70km strike trend Gold Terra • Gold Terra Controls + 95% Investing • 14 Moz. came from 7km of the 70km = 10% • Undere
Slide 5: Yellowknife = 14 M oz Historic District
Yellowknife = 14 M oz Historic District 800 km2 Gold Terra has consolidated large property (800 km2) adjacent to Con and Giant mines (past production of 14 M oz at 16 g/t Au) Close to the City of Yellowknife Excellent infrastructure Option with Newmont adjacent to Con mine1 Multiple high-grade gold
Slide 6: Yellowknife City Gold Project
Yellowknife City Gold Project Initial mineral resource estimate of Inferred 735,000 oz completed November 2019 ▪ The 2020 Drilling program completed on Sam Otto & Crestaurum extended the known gold mineralized corridors and should contribute positively to an update resources in 2021 Our High Priorit
Slide 7: Gold Terra 2020 Achievements
Gold Terra 2020 Achievements ▪ Raised ~C$12 M ▪ Optioned Newmont Claims south of Con mine ▪ Drilling program ongoing on Campbell Shear ✓ C$7.1 financing ✓ Crestaurum ~7,000m drilling program ✓ Sam Otto ~10,000m ✓ Newmont option executed (09/20) drilling program Q4 2019 Q1 2020 Q2 2020 Q3 2020 Q4 202
Slide 8: Campbell Shear High Priority Target
Campbell Shear High Priority Target A B Campbell Shear = 13 Moz From the Giant and Con mines Same deposit over 7 km ▪ Con Mine (1938-2005): ▪ 1.0 Moz @ 20 g/t from Con Shear ▪ 5.1 Moz @ 16 g/t from Campbell Shear ▪ Campbell Shear is underexplored north and south of Giant and Con mines ▪ Gold Terra s
Slide 9: Campbell Shear Compilation
Campbell Shear Compilation ▪ The Campbell Shear extend South of Campbell Shear Relatively Untested South of the Con Mine the Con Mine Long-section ▪ Historical drilling has already outlined know mineralization for more than 10km south of the Con Mine ▪ Known resources in Yellowrex and Kam Point Nort
Slide 10: Campbell Shear Drilling Program
Campbell Shear Drilling Program ▪ Phase 1 Drilling Program: 19 holes Totaling ~12,000m ▪ Test 1.2 km of strike length at 125-150m spacing ▪ Target between 250 and 600m vertical depth ▪ Subject to positive results, Phase 2 drilling to test below -500m Long-section 10
Slide 11: Successful Track Record
Successful Track Record Team with History of Discoveries, Mine Development and Strong Shareholder Return Gerald Panneton, Executive Chairman ▪ Geologist with +30 yrs of Canadian and international experience ▪ President / CEO and Founder of Detour Gold (2006-2013) raised +$2.6B and brought Detour Lak
Slide 12: Initial Mineral Resource (November 2019)
Initial Mineral Resource (November 2019) Pit Constrained Inferred Mineral Resources Deposit Tonnes Grade (Au g/t) Contained Gold Ounces Crestaurum Pit (Starter) 127,000 9.41 38,000 Mispickel Pit 696,000 2.62 59,000 Sam Otto Pit 10,794,000 1.23 426,000 Pit Constrained Total 11,617,000 1.40 523,000 Un
Slide 13: 2020 – Crestaurum Drilling Program
2020 – Crestaurum Drilling Program ▪ 2020 drilling at the Crestaurum deposit identified multiple vein systems from near surface to approximately 250m below surface ▪ November 2019 mineral resource estimate: OP: shallow high-grade starter pit (Inferred:126,000 t at 9.41 g/t Au)1 ▪ UG: Inferred 153,00
Slide 14: 2020 – Crestaurum Drilling Program
2020 – Crestaurum Drilling Program Crestaurum: Potential to Increase Resources NEAR SURFACE as all open 14
Slide 15: 2020 – Drilling Success at Sam Otto
2020 – Drilling Success at Sam Otto ▪ Sam Otto Corridor – total strike length of 4.5km, 80-130m wide shear zone, ~3km NE of Crestaurum deposit ▪ Completed 9,622m in 34 holes at 50 to 200m centers Highlights ▪ Results show good continuity at >1 g/t and have 1.30 g/t Au over 50.6m, (including 3.02 g/t
Slide 16: City of Yellowknife – Engagement & Community
City of Yellowknife – Engagement & Community Northwest Territories grants Gold Terra the NWT MAX Award for Environmental and Social Responsibility Drill permits issued in record time 3 mines permitted in NWT in last 5 years Strong Community Support for Mining Exceptional Infrastructure ▪ Rich mining
Slide 17: Capital Structure and Ownership
Capital Structure and Ownership Gold Terra Capitalization1 (in millions) Shares Outstanding 181.3 Warrants 10.9 Closed $7.1M Options 5.5 Financing Fully Diluted Shares 197.7 Treasury1 $3.5 Major Shareholders2 Mgmt & Board 6.1% SSI Asset Mgmt 5.4% RBC Global Asset Mgmt 3.4% Konwave AG 1.1% Gabelli 1.
Slide 18: For more information, please contact
For more information, please contact: David Suda President & CEO Toll-Free: 855-737-2684 Phone: 604-689-1749 dsuda@goldterracorp.com Mara Strazdins Manager of Investor Relations Phone: 1-778-897-1590 | 604-689-1749 ext 102 Strazdins@goldterracorp.com www.goldterracorp.com TSX.V: YGT | OTCQX: YGTFF |