Slide 1: Multi Moz Potential in Yellowknife, NWT
TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0 OTCQB: YGTFF Multi Moz Potential in Yellowknife, NWT LARGEST UNDER EXPLORED High Grade Gold Camp in Canada AUGUST 2026 CORPORATE PRESENTATION www.goldterracorp.com
Slide 2: Forward Looking Statement
Forward Looking Statement Statements contained in this presentation that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward- Looking Information") within the meaning of applicable Canadian securities legislation. Forward Looking Informa
Slide 3: Cautionary Statement
Cautionary Statement This presentation does not constitute an offer, advertisement or solicitation for the purchase of securities. Further, this presentation has been prepared by Gold Terra Resources Corp. (“Gold Terra”) management and does not represent a recommendation to buy or sell securities. I
Slide 4: Corporate Snapshot
Corporate Snapshot Gold Terra Capitalization (in Millions) Shares Outstanding 514.9 Options 15.5 Yellowknife Project Fully Diluted Shares 530.5 Top Shareholders +30% Analyst Coverage 4
Slide 5: Proven Exploration & Mine Building Team
Proven Exploration & Mine Building Team Gerald Panneton, Chairman & CEO - Geologist with +35 years of Canadian and international experience. Founder, President & CEO of Detour Gold Corporation (2006-2013) Detour Lake project grew to over 16 Moz in reserves and within 30 Moz resources and brought int
Slide 6: Yellowknife High Grade Gold Focused Strategy
FOCUSED STRATEGY YELLOWKNIFE HIGH GRADE GOLD CAMPBELL SHEAR (CS) = 14 Moz @ 16-22 g/t YELLOWKNIFE 6th LARGEST HIGH GRADE GOLD CAMP (Timmins / Kirkland L / Val D’or / RL ) INFRASTRUCTURE – Hydro Power, airport Yellowknife town of 23,000 / Low-cost drilling (C$250/m) Con Mine Option = Brownfield Statu
Slide 7: 2026-2027 Catalysts
DELIVERABLES & TIMELINE 2026-2027 CATALYSTS 103 N Zone to expand the 595,000 ounces (MRE 2026) CON MINE HISTORICAL TAILING OF 6-12 Mt (1938-2003) 7000 m of Sonic drilling to start in Q3 YELLOREX DRILLING METALLURGICAL TESTWORK PERMITTING RPROCESS INITIATED TO SUBMIT THE PROJECT DESCRIPTION PRELIMINA
Slide 8: Potential Quick Path to Production
POTENTIAL QUICK PATH TO PRODUCTION 2021-25 2026 2027 2028 2029 Con Mine DRILLING FEASABILITY DEVELOPMENT PRODUCTION $16 million 103N / TSF PERMITTING 35,000m Q4 PEA/PFS MRE 2022 PRODUCTION DECISION 8
Slide 9: Strategic Land Holdings - 70km Campbell Shear Gold Mineralized System
Strategic Land Holdings - 70km Campbell Shear Gold Mineralized System Yellowknife Gold Belt 2.0 MILLION OUNCES DISCOVERED* ON YELLOWKNIFE PROJECT 2026 N43-101 Mineral Resource Estimate (MRE: Con Mine Option (CMO)Property: 103N = 595,000 Inferred oz within 5.1 M tonnes @ 3.64 g/t Yellorex = 178,000 I
Slide 10: Con Mine (1938-2003) 6 Moz @ 16-20 g/t
Con Mine (1938-2003) 6 Moz @ 16-20 g/t Workforce Hydro Power Airports and Roads 10
Slide 11: Focus on the Prolific Campbell Shear
Focus on the Prolific Campbell Shear 2023 drilling focus was on Con Mine near surface where A 5 Moz the last MRE was the focus B 1 Moz Drilling Targets between surface and 500m vertical over 2km strike length: ▪ Yellorex North ▪ Yellorex Main Con Mine (1938-2003) Historic Production 1.0 Moz @ 20 g/t
Slide 12: 2026 Drilling Program
2026 Drilling Program 2026 MRE – addition of 595,000 Inferred ounces within 5.1 million tonnes grading 3.64 g/t from the 103N Zone, historically drilled from the Con Mine underground development in the northern extension of the Campbell Shear structure (Refer to the 2026 43-101 Technical Report) 12
Slide 13: Zone 103N Drilling Program
Zone 103N Drilling Program • Drilling has started on the newly re-evaluated historical Zone 103N which is the Campbell Shear(CS) continuation to the North of the CMO property, developed in the later years of mine’s operating life • The CS northern extension can be followed for 1.6 kilometres on thre
Slide 14: Underground Cross Section 7900 looking North
Underground Cross Section 7900 looking North 14
Slide 15: CS – Close up Long Section looking West
CS – Close up Long Section looking West S Robertson Shaft C1 shaft N North (103) CS L 2300 feet L 3100 feet ? GxT gram*meters 5-20 20-50 60m Campbell Shear 50-100 ++100 Long Section -1900 m GTCM23-055 12.7 g/t over 1.7m GTCM25-056a CS intersection 15
Slide 16: Hole GTCM23-055 core showing the Campbell Shear
Hole GTCM23-055 core showing the Campbell Shear from 2102 to 2118 metres Including 12.93 g/t over 1.7m (quartz veining): 16
Slide 17: 2026 Drilling to Expand 2022 MRE on the CMO Property
2026 Drilling to Expand 2022 MRE on the CMO Property The Yellorex zone immediately south of the past producing Campbell Shear • Hole GTY26-22 intersected 5.88 g/t Au over 19.00 m from 268 m to 287 m downhole, including 18.50 g/t over 4 m starting at 268 m, including 27.50 g/t over 2 m starting at 26
Slide 18: Con Mine Historical Tailings – High-Priority Target
Con Mine Historical Tailings – High-Priority Target Con Mine historical Tailing Storage facility (TSF) high- priority exploration program: ▪ Approximately 148 sonic drill holes spaced 40 metres by 40 metres with an average depth of 20 to 30 metres om two TSF’s, the Upper Pud, and the Middle Pud ▪ Ob
Slide 19: 100% Owned Walsh Lake Area - Open for Expansion
100 % Owned Walsh Lake Area - Open for Expansion 20 kilometres north of Yellowknife 15 holes with 4,904.9 m completed Extending Zone 14-24: Hole GTWL26-024 intersected 22.46 g/t Au (uncut) over 5.7 m from 119.6 m to 125.3 m downhole, including 198 g/t over 0.5 m starting at 119.60, opening two (2) n
Slide 20: Walsh Lake Area – New Zone
Walsh Lake Area – New Zone Section showing two new gold mineralization zones separated by 200 metres with multiple visible gold specks in Walsh Lake gold corridor 20
Slide 21: Commitment to ESG
Commitment to ESG Gold Terra is the recipient of the 2023 NWT MAX Environmental and Social Responsibility Award in recognition of exceptional efforts in supporting the 2023 NWT wildfire efforts Forward-Looking Community Relations Environmental • The City of Yellowknife Responsibility Engagement Plan
Slide 22: 22
22
Slide 23: For more information, please contact
For more information, please contact: Gerald Panneton Chairman & CEO gpanneton@goldterracorp.com Mara Strazdins Investor Relations Phone: 1-778-897-1590 | 1-416-710-0646 Strazdins@goldterracorp.com www.goldterracorp.com TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0
Slide 24: 2025 Drilling: Wedge Hole 56A Intersects Campbell Shear
2025 Drilling: Wedge Hole 56A Intersects Campbell Shear Cross section showing wedge hole GTCM24-056A drilled from master hole GTCM24-056, intersected the Campbell Shear from approximately 2,665 to 2,707 metres downhole 24
Slide 25: Campbell Shear Model
Campbell Shear Model High Grade (+ 30 g/t Au) bordered by pinching quartz vein systems with lower grade intersections No question we are in the Campbell Shear and more drilling is needed 25
Slide 26: Con Mine Option Property - Substantial Benefits To Unlock
Con Mine Option Property - Substantial Benefits To UNLOCK Con Mine Option to purchase 100% Interest would have MAJOR BENEFITS ) Mineral leases and surface rights. Access to infrastructure, such underground openings and shafts, buildings, storage facilities and roads including original C -1 shaft ope