Gold Terra Resource Corp. · TSXV:YGT
Gold Terra Resource — Investor Presentation (October 2026)
26 slides from Gold Terra Resource's investor presentation, October 2026
Slide 1: Multi Moz Potential in Yellowknife, NWT
TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0 OTCQB: YGTFF Multi Moz Potential in Yellowknife, NWT: Large Under Explored High Grade Gold Camp in Canada OCTOBER 2026 CORPORATE PRESENTATION www.goldterracorp.com
Slide 2: Forward Looking Statement
Forward Looking Statement Statements contained in this presentation that are not historical facts are "forward-looking information" or "forward-looking statements" (collectively, "Forward- Looking Information") within the meaning of applicable Canadian securities legislation. Forward Looking Informa
Slide 3: Cautionary Statement
Cautionary Statement This presentation does not constitute an offer, advertisement or solicitation for the purchase of securities. Further, this presentation has been prepared by Gold Terra Resources Corp. (“Gold Terra”) management and does not represent a recommendation to buy or sell securities. I
Slide 4: Corporate Snapshot
Corporate Snapshot Overview Gold Terra Capitalization Basic Shares Out. 515.0 M 1 Yellowknife Project Options 15.5 M • Con Mine (optioned from Newmont) • Crestaurum Fully Diluted Out. 530.5 M • Sam Otto Market Cap. (FD at C$0.20/sh.) C$106.1 M • Walsh Lake • Homer (Cu-Au) Cash C$10 M Top 30% Shareho
Slide 5: Investment Thesis
Investment Thesis Canadian District scale – 70km Campbell Shear - High grade 01 • • 1.9 Moz discovered since inception Includes high-grade material at historic Con Mine Near-term production potential 02 • • Con Mine restart opportunity with Infrastructure (large savings of +C$ 200 million) Increment
Slide 6: Benchmarking Against Canadian Developers
Benchmarking Against Canadian Developers PEA Stage Developers in Canada – Resource & Grades MI&I Grade 5.21 3.33 3.02 1.11 1.12 1.38 2.18 1.66 1.19 1.07 0.99 0.45 16.6 8.8 6.8 6.7 4.8 4.1 4.0 3.0 2.3 1.9 1.8 1.2 STLLR Snowline Talamore Gold X2 Spanish Mtn. Wallbridge Fury White Gold Radisson Gold Te
Slide 7: Proven Exploration & Mine Building Team
Proven Exploration & Mine Building Team Gerald Panneton, Chairman & CEO - Geologist with +40 years of Canadian and international experience. Founder, President & CEO of Detour Gold Corporation (2006-2013) Detour Lake project grew to over 16 Moz in reserves and 30 Moz resources and brought into produ
Slide 8: Yellowknife Mineral Resource Estimate (2026)
Yellowknife Mineral Resource Estimate (2026) ~2.0 MILLION OUNCES DISCOVERED CMO and Crestaurum (2026 MRE - SLR) 1 Category Tonnage Grade Contained (kt) (g/t) (koz) Indicated 729 4.40 103 Inferred 7,534 3.70 895 1 Crestaurum Total 2 103N Zone Effective Date April 30, 2026; using US$2,600/oz Au 3 Yell
Slide 9: 2026 Fall Drilling +10000m Program Ongoing
2026 Fall Drilling +10000m Program Ongoing ❑ Historical Tailings of the Con Mine: Ounces near surface / No Gravity Circuit (1938-1986) 10% of unrecovered gold = 6 Mt @ 1.6-2.0 g/t = > 200,000 ounces Upper Pud 85/150 holes completed for 1,688 metres Assay expected to be received at end of October ❑ C
Slide 10: Anticipated Development & Timeline to Production
Anticipated Development & Timeline to Production Near term production potential underpinned by established infrastructure, permitting strategy, and supportive mining jurisdiction 2021-25 2026 2027 2028 2029 Con Mine 16,000m Done Feasibility Development Production $16 million Study ✓ Q1 MRE Permittin
Slide 11: The Con Mine produced 6 Moz between 1938-2003 @ 16-22 g/t
The Con Mine produced 6 Moz between 1938 -2003 @ 16-22 g/t Workforce Hydro Power Airports and Roads 11
Slide 12: Con Mine Historical Tailings – 17 holes completed
Con Mine Historical Tailings – 17 holes completed CMUP-05 @ 26m 12
Slide 13: Sonic Hole CM26-005 @ 25-26 metres depth
Sonic Hole CM26-005 @ 25-26 metres depth: 13
Slide 14: Con Mine – Close up Long Section of Campbell Shear
Con Mine – Close up Long Section of Campbell Shear S Robertson Shaft C1 shaft N North (103) CS L 2300 feet L 3100 feet ? GxT gram*meters 5-20 20-50 60 m Campbell Shear 50-100 +100 GTCM23-055 -1900 m 12.7 g/t over 1.7m GTCM25-056a CS intersection 14
Slide 15: Zone 103 North Drilling
Zone 103 North Drilling Looking West GTCM26-61-61A 103 N Target Block Grades Au g/t Completed Yellowknife Gold Project > 20 Zone 103N > 10 Source: GeoVector Management Inc July 2026 >5 > 3.5 >2 2600 Level >1 > 0.5 2750 Level 2900 Level 3100 Level Previously Mined Stope CMO YGT-2 15
Slide 16: 2026 Resource Overview | Con Mine Property
2026 Resource Overview | Con Mine Property Resource expansion from 2026 drilling at 103N Zone ✓ 2026 MRE – addition of 595,000 Inferred ounces within 5.1 Mt at 3.64 g/t from 103N Zone, drilled from Con Mine UG development at northern extension of CS structure, developed in the later years of the min
Slide 17: Open for Expansion | 100% Owned Walsh Lake Area
Open for Expansion | 100% Owned Walsh Lake Area 20 km north of Yellowknife – 15 holes with 4,905 m completed Extending Zone 14-24: Hole GTWL26-024 intersected 22.46 g/t Au (uncut) over 5.7 m from 119.6 m to 125.3 m downhole, including 198 g/t over 0.5 m starting at 119.6, opening two (2) new gold mi
Slide 18: Commitment to ESG
Commitment to ESG Gold Terra is the recipient of the 2023 NWT MAX Environmental and Social Responsibility Award in recognition of exceptional efforts in supporting the 2023 NWT wildfire efforts Forward-Looking Community Relations Environmental • The City of Yellowknife Responsibility Engagement Plan
Slide 19: 19
19
Slide 20: For more information, please contact
For more information, please contact: Gerald Panneton Chairman & CEO gpanneton@goldterracorp.com Mara Strazdins Investor Relations Phone: 1-778-897-1590 | 1-416-710-0646 Strazdins@goldterracorp.com www.goldterracorp.com TSX.V: YGT | OTCQX: YGTFF | Frankfurt: TX0
Slide 21: Con Mine Option – Deep Value Restart Opportunity
Con Mine Option – Deep Value Restart Opportunity Commitments (6-year Option with Newmont ending November 21st 2027) Minimum spend of C$8.0M (C$20M as of June 2026) • Assume existing site liabilities & reclamation obligations (C$16M as of Dec 2025) • Payment of C$8M (in cash or shares) due on closing
Slide 22: 2026 Total Mineral Resource Estimate
2026 Total Mineral Resource Estimate* ~2 Moz discovered since inception Deposit Year Method Tonnage Grade Contained (kt) (g/t) (koz Au) Indicated MRE Subset: Con Mine (2026 SLR) Yellorex 2026 UG 145 5.15 24 Category Tonnage Grade Contained Crestaurum 2026 OP/UG 584 4.21 79 (kt) (g/t) (koz) Indicated
Slide 23: 2026 Resource Overview | Con Mine Property
2026 Resource Overview | Con Mine Property Crestaurum Cross Section - Grade and Resource Breakdown 23
Slide 24: 2025 Drilling: Wedge Hole 56A Intersects Campbell Shear
2025 Drilling: Wedge Hole 56A Intersects Campbell Shear Cross section showing wedge hole GTCM24-056A drilled from master hole GTCM24-056, intersected the Campbell Shear from approximately 2,665 to 2,707 m downhole 24
Slide 25: Campbell Shear Model
Campbell Shear Model High Grade (+ 30 g/t Au) bordered by pinching quartz vein systems with lower grade intersections Applied to guide exploration across the property 25
Slide 26: Hole GTCM23-055 core showing the Campbell Shear
Hole GTCM23-055 core showing the Campbell Shear from 2102 to 2118 metres Including 12.93 g/t over 1.7m (quartz veining): 26
Gold Terra Resource — Investor Presentation (October 2026) on 6ix